如何确保勘察质量(how to ensure the quality of investigation)

上传人:bao****ty 文档编号:117580767 上传时间:2019-12-05 格式:DOC 页数:10 大小:35KB
返回 下载 相关 举报
如何确保勘察质量(how to ensure the quality of investigation)_第1页
第1页 / 共10页
如何确保勘察质量(how to ensure the quality of investigation)_第2页
第2页 / 共10页
如何确保勘察质量(how to ensure the quality of investigation)_第3页
第3页 / 共10页
如何确保勘察质量(how to ensure the quality of investigation)_第4页
第4页 / 共10页
如何确保勘察质量(how to ensure the quality of investigation)_第5页
第5页 / 共10页
点击查看更多>>
资源描述

《如何确保勘察质量(how to ensure the quality of investigation)》由会员分享,可在线阅读,更多相关《如何确保勘察质量(how to ensure the quality of investigation)(10页珍藏版)》请在金锄头文库上搜索。

1、如何确保勘察质量(How to ensure the quality of investigation)How to ensure the quality of exploration under the current competitive market conditions - debate with expert Guo ShutaiManagement reminder: this post is executed by 2008-04-03Strict management to ensure the quality of investigationComprehensive su

2、rvey and Design Institute of Ministry of construction Guo ShutaiIn 2001, this paper won the first prize of the first regulation committee of Beijing, and there are still some points for reference todayI. PrefaceThe promulgation of Regulations construction engineering quality management is a major ev

3、ent in Chinas construction industry, the Regulations not only for the parties to engage in construction activities to further clarify the responsibilities and obligations of quality supervision and inspection, at the same time, also stressed the implementation of strengthening the quality of the con

4、struction of laws and regulations and mandatory standards. In recent years, the quality accidents of large and malignant construction projects occur frequently, and the implementation of the regulations is extremely urgent. By studying the quality, responsibility and obligation of the survey and des

5、ign units in the third chapter of the regulations, and combining with the engineering practice, the quality control suggestions for the following projects are put forward.1. strictly investigate the quality of process control.1.1 collect and analyze the data of the survey work is sufficient or not,

6、will directly affect whether can develop a reasonable economic and feasible plan for exploration. In the event of adverse geological phenomena, it is necessary to give full attention to the formulation of the survey plan, without fighting the unprepared battle.1.2 write the investigation outline of

7、investigation outline is a guiding document for investigation of the process, should be clear, specific, operable, before writing the investigation outline, should be made by the owner or fill in the technical requirements of investigation and design units, in order to deeply understand the design i

8、ntent, and some of them have put. Without the preparation of the survey outline or without the signature of the auditor, the phenomenon of exploration will often arise and should be paid full attention to.1.3 field survey and test the original field recording is the investigation process work first-

9、hand information, some units did not attach enough importance, such as stratigraphic description roundness and natural gradation, these industry stratification often brings great difficulties.Pairs of a and B buildings should be measured site shear wave speed, and some projects to do the quantity is

10、 not enough, even do not do, very seriously.Breakage of soil sampler and standard penetration device is still in use, resulting in serious distortion of data. Due to the large layered difficult footage.When the light penetration test is used in individual projects, the standard study is not enough a

11、nd the understanding is not deep, and the maximum experimental depth sometimes exceeds the specifications.Drilling hole elevation measurement without closure, I do not know how accurate?. The location or number of the reference points is not indicated or ominous. Record is not standard, no signature

12、, no date.The stratigraphic division is not reasonable, such as the yellow brown, gray and brown two colors of different soil division a layer is obviously unreasonable, according to the different causes of age and depositional environment division.1.4 indoor geotechnical test personnel and technica

13、l personnel responsible for the lack of communication, test personnel do experiments, the abnormal situation do not inform technical personnel check; technical personnel do not speak the experimental results and check the original records, the experimental results are not compared, brought on by, le

14、aving hidden dangers for engineering quality.Test personnel should be familiar with the code for investigation of geotechnical engineering, such as the case of 0 15m depth in the silt fine sand at,Clay content analysis should be carried out in order to evaluate the liquefaction potential even if the

15、 technical person does not require it.1.5, collation of the industry information, the abnormal situation should be analyzed and determined. Such as the upper miscellaneous fill and find fresh red brick, wood deep in the old-fashioned layer, it should analyze whether the hole collapse and falling blo

16、ck caused by the abnormal layer found most probably it did not actually happen. The draw for the miscellaneous fill soil is obviously a. When necessary, should go to the site to drill proof, until thoroughly identified, without leaving any hidden dangers. Be careful and careful. In order to avoid differences in soil physical and mechanical indicators of the larger layer, missing the soft interlayer, suggested i

展开阅读全文
相关资源
相关搜索

当前位置:首页 > 大杂烩/其它

电脑版 |金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号