大型拖拉机动力换挡变速箱试验台

上传人:oq****t 文档编号:11388162 上传时间:2017-09-02 格式:PDF 页数:5 大小:542.26KB
返回 下载 相关 举报
大型拖拉机动力换挡变速箱试验台_第1页
第1页 / 共5页
大型拖拉机动力换挡变速箱试验台_第2页
第2页 / 共5页
大型拖拉机动力换挡变速箱试验台_第3页
第3页 / 共5页
大型拖拉机动力换挡变速箱试验台_第4页
第4页 / 共5页
大型拖拉机动力换挡变速箱试验台_第5页
第5页 / 共5页
亲,该文档总共5页,全部预览完了,如果喜欢就下载吧!
资源描述

《大型拖拉机动力换挡变速箱试验台》由会员分享,可在线阅读,更多相关《大型拖拉机动力换挡变速箱试验台(5页珍藏版)》请在金锄头文库上搜索。

1、2 0 1 1M4j MQk1p,!9vMQkb!9CazaF#?d,7?0e0dbkTV:kqv,r250 kW;LC?,/?qr80%;_d?,?_zFaaAd16|bk,r!91pb1oM: MQ kms|: S219DSM: AcI|: 1000-1298( 2011) 04-0013-04Test-bed ofPower ShiftTransmission for Large-scale TractorZhu Sihong1 Zhu Yonggang1 Zhu Xingxing1 Deng Xiaoting1 H eHualin2 GaoHuisong1( 1. Colleg e o

2、f E ngineering, Nanjing Agricultural University, Nanjing 210031, China 2. Changfa Group, Changzhou 213000, China )AbstractAccording to the testing requirements of tractor power shift transm ission, a power shift transm issiontestbed for large-scale tractor was designed. The power shift transm ission

3、, drive motor, loading motorand energy feedback system were designed. The electronic control unit and electronic measurementsystem were developed. The overall scheme of tests for power shift transm ission was determ ined andtested. The test results showed that the power of proposed test bed was up t

4、o 250 kW. A closed-loopfeedback of energy was achieved thus energy-saving rate in overload operating conditions reached to80%. The inputspeed and torque, output speed and torque, hydraulic system flow and pressure could betested w ith the system. The testbed was operated steadily and couldmeet the d

5、esign requirem ents.Key words Tractor, Power shift transm ission, Test bedl: 2010-04-29 : 2010-05-19* /EB0SES/9( 2006BAD11A02)Te:,q,pV3=,1VYd#e, E-mai:l zhusihong njau. edu. cnMQTeTrq,11959MCaterpillarD9D,xv/bxSE,BvaBa?vjv/,/?qr80%bF%V,|MQ?VLk1pbkV0e1e,TeL,?kzaFaAd=16bkTV,k,kTVLb(/38:)16j Tk!9 J.2;,

6、 2008, 30( 3): 291 293.CaiP ing, He Yulin, W u M aosheng. The design of automobile gearbox load test bed w ith machine energy return J.P iezoelectrics& Acoustooptics, 2008, 30(3): 291 293. ( in Chinese)2 ,;,./MQFk J.v, 2008, 28( 1): 70 74.Ge Nan, Peng Guangzheng, Yu L in. Gearbox loading test bench

7、based on DC speed regulation J. Transactions of BeijingInstitute ofTechnology, 2008, 28( 1): 70 74. ( in Chinese)3 m,y,.1Mk/#k!9 J.v, 2008, 28( 6): 500504.M an Y im ing, ChenHuiyan, Gong Jianwe,i et a.l Design of a test bench system for automated mechanical transm ission J.Transactions ofBeijing Ins

8、titute ofTechnology, 2008, 28( 6): 500 504. ( in Chinese)4 ,#2.kA)Mked J.qv, 2007, 31( 4):656 659.Cheng Guangwe,i Zhou Zhil,i Deng Chu. nan. Research on tracked vehiclesHMT test-bedmeasure and control system J.JournalofWuhanUniversity ofTechnology, 2007, 31(4): 656 659. ( in Chinese)5 f,I.LabVIEWMQkd J.2S/v:1S, 2006, 27(3): 15 17.Yu Feipeng, JiaHongshe. Test system of tractor power shift transm ission based onLabVIEW J. JournalofHenanUniversityof Science& Technology: N aturalScience, 2006, 27( 3): 15 17. ( in Chinese)38j 2 0 1 1M

展开阅读全文
相关资源
相关搜索

当前位置:首页 > 行业资料 > 其它行业文档

电脑版 |金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号