《quality assurance for electrical installation电气安装质保体系》由会员分享,可在线阅读,更多相关《quality assurance for electrical installation电气安装质保体系(51页珍藏版)》请在金锄头文库上搜索。
1、P2195CC051 Civil 1.OeItm, 1.5“ot“,.“,oflfW(Ilf.SockPlOUIII;I.WId,“Iouu.1.SC.,c 2.2,8M;IC.lla_(quipm1l J1._ContolofM.l. ,i. 1Of!.it 3.1MalO,1(ontoI 3.1ProcuR.qU“ 3.3M.io“ 3. M.iohl“. 3.5 Mariol,.Iutrv“,mD01.fCl.00_edlles.10 P“,“,“1d.“ge 10lhebkwalh01wo,i“el. ,I. sh.1Ibe.iled,with .upport;dr, w“Ils.nd
2、1lSrwu.ry Ie e“b- 1M purthl.rlaundo1.nd fully lhe.lure 01theder1u.e“. llern.I,prapowl. Project Quali y Plan 8.ListofPreferred Suppliers CablesSwanib Cabl s, ARB, Voltex, Walfish Electrical, othr TransformersPowertech Line Material supplySwanib Cables, ARB, Voltex, W lfish Electrical, ot her LVDistri
3、butionBoardsSCHNIEDERNamibia LightingSwanibCables,ARB. Voltex,WalfishEJ ctr lcal,other 9.Statutory Requirements oNamibian Mine Health and Safetylaws cNamibian0cupatlonalHealth andSaftvlaws oMine Health and Safety Regulat ens (Act 29 of 1996) aOccupational Health and Safety Act (Act 85 of 1993) oMine
4、ralsAct (Act50 of 19 1) 27 ProjectQality Plan 10. Acceptanceofconstructioncompletions a.Definition Construction Completion Isachievedwhenthe work has b en constructed correctly In accordancewith thdrawings.spedficarlcn, seepofworand any other documentcontained wlhinthAgreement and any valid instruct
5、ion givenby HPNto the contractor. Construction completion shall not been achieved until such sra usis attestedbyHP Nandas necessary,certifyingauthority by the necessary and required documentation,asmeeting both clients and certifyingauthority stated r qulrernents for construction completion.Upon com
6、pletion ofInstallation,inspection and constructiontstingallaspectsofheplantshallbe n condition wherit can be energized in a safe and reliablewaywithoutsk to life, limp or proprtysuch hatInthe opinionofHPJV,coldComrnisslonlngcancommence. b.Documentation Proof of inspection, completion test, etc, are
7、recorded at individual item IvIon the project ch cklist/testrecord sheets completedbythe contractor and witn ssed fa acceptedby HPN as required and certifying authority where necessary. 11.Acceptaneofconstructioncompletions oHandoverpackage DescrIption At own rs final acceptance of a system/item,HPJ
8、Vwillissua h nd -over packag(HOP) which shall include the followingdocuments: All HOPdocum ents/ch ck sheets andtestreports aagreedIn accordancewith the HPJV approved ITPs and Datadossier indexes. 28 HPN amec!J .- tenova - HliBROJEnJOINT VENTUR C/; CABLEACKIG INSTALLATION CERTIFICATE - CERTIFICATE N
9、o.:IPROJECT No.: CLIENT: DESCRIPTION:IAREA: CABLE RACK NAMEINo: FROM LOCATION: TO LOCATION ; INSTALLATIONWAS CARRIED OUT TOTHEFOLLOWING REfERENCE DRAWINGS 1SPECIFICATIONS : DRAWING No.SHEETREVSPECIACATION No.SHEETREV ITEM No.DESCRIPTIONCOMMENT 1.TYPE OF CABLE RACK ING CORRECT AS PER AREA SPECIFICATI
10、ON 2.PAINT FINNISH AS PER SPECIFICATION a.LOCATION. ORIENTATION AND ROUTING AS PER DRAWINGISPECIA CATIONS 4.BRACES AND SUPPORTS AS PER DRAWING I SPECIFICATION 5.EARTH BONDING JUMPERS INSTALLED AND CORRECT 6.HOLD DOWNS PROPERLY INSTALLED 7. MINIMUM DISTANCES BETWEEN POWER AND INSTRUMENTATION RACKS VE
11、RIFIED 8.NO SHARP EDGES TO CUT ORDAMAGE CABLES 9.NO OBSTRUCTIONS TO HINDER PULUNGIROUTING OF CABLES 10.CABLE RACK ING BENDS CORRECT AS FORCABLE BENDING RADIUS 11. COVERS, FIRE-BARRIERS AND PARTITIONS INSTALLED AS PER SPECIFICATIONS 12.INSTALLATION NEAT AND TIDY 13,AS-BUILTDRAWINGS CHECKED AND VERIFI
12、ED COMMENTSIREMARKS NS ELECTRICHPJVQA/QC DATEDATEDATE NAMENAMENAE SIGNSIGNISIGNI (/8: CABLE CODUITITRUKG ISTALATIOCERTIFIC TE -.c.-r.Lcnh.:lI. - CERTIFICATE No.:IPROJECT No.: CLIENT: OESCRIPnON:IAREA: FROM LOCAnON; TO LOCATION; INSTALLATIONWAS CARRIED OUT TO THE FOLLOWING REFERENCE ORAWINGSJSPECIFlC
13、ATlONS : ORAWINGNo.SHEETREVSPECIFlCAnONNo.SHEETREV ITEM No.DESCRIPTIONCOMMENT 1.TYPE OF CABLE CONDUIT I TRUNKING CORRECT ASpeRAREA SPECIFICATION 2.PAINT FINNISH I UV PROTECTION RATING AS PER SPECIFICATION 3.LOCATION. ORIENTATiON AND ROUTING AS PER DRAWING SPECIFICAnONS 4.BRACES, SADDLES ANO SUPPORTS
14、 AS PER SPECIFICATION 5.PULL BOXES I EXTENSION BOXESfiTTED AS REQUIREDIAS PER SPECIFICATION 6.PULLBOXES I EXTENSION BOXES/ TRUNKING COVERSfiTTED 7.INSPECTION BOXES FITTED AS AND WHERE REQUIRED 8.CABLE CONDUITITRUNKING BENDS CORRECT AS FOR CABLE BENDING RADIUS 9. CONDUITfTRUNKING ADAPTORS, COUPLINGSj
15、 CABLSLEVETRENCHIG INSTA LATION CERICATE CERTIFICATENo.:IPROJECT No.: CLIENT: SLEEVE TAG No.:IAREA: DESCRIPTION GENERAL INSTALLATION CHECKS TRENCHING ROUTE ACCORDING TO RELEVANTAREA DRAWINGS TRENCHING 51(DEPTH + WIDTH) EQUIPMENT No.:IAREA: EQUIPMENT OESCIPTlON : M.Qm IF NO MANUFACURETERMINATION TORQ
16、UEVALUES.MESUPPLIED, TERMINATIONSwtLLBE TORQUE ACCORDING TO ABB SPECIACATlONS, ASREFERREDTO IN REFERENCe DOCUMENT; ABBl3500010815 - REV 4 BOLT SIZE flB6U MilDQTI:I:I1.1D GSTAINLESS STI“El HIGnR8 MG1().15Nm1().i6Nm1020Nm1().20Nm M820-25Nm2o-25Nm25-30fotm25-30Nm Mi03O-35Nm30-35Nm35-40Nm35-40Nm M124D-45Nm40-45Nm45-50Nm46-50Nm M113S().55Nm50S5Nm55-60Nm55-60Nm BUSB ROlDERSI BOLT BOLTFlSHPLATESI COVERSI TERlNATOR SIZE E U1/RV11W1/R INSULATRSI