1、 TESTING: UNIT TESTING / USER MANUALMODULE: PRODUCTION PLANNING ENVIRONMENT SYSTEM: SAP R/3 CLIENT: 200 UNIT TESTING SCENARIO SCENARIO NUMBER: PP05 DESCRIPTION: Order Confirmation PREPARED BY NAME : Shrikant Ingole TEAM: Production Planning DATE: 17/11/2008 APPROVED & TESTED BY NAME : Nanhe Babu (Pw

2、C) DATE: TEAM: Production Planning Page 1 of 11 TESTING: UNIT TESTING / USER MANUALMODULE: PRODUCTION PLANNING 1. Transaction Code/ Path Enter the menu path of the transaction code, which is going to be tested by the user. Menu Path Logistics Production Shop Floor control Confirmation Enter For Oper

3、ation CO11N Time Ticket T-CodeCO11N 2. Input Data 1. Enter the Input parameters, which need to be given by the user during the testing of this scenario. 2. Input the value for the fields and then if required, copy the screen shot of the input screen after the table. Page 2 of 11 TESTING: UNIT TESTIN

4、G / USER MANUALMODULE: PRODUCTION PLANNING 2.1Input Screen Name Time Ticket For Production Order: Initial Screen Description of the FieldNature of the FieldValue of the Field Order MandatoryEnter your Order No. 85000011 OperationMandatoryEnter your Operation No. 0010 YieldOptional Enter the no. item

5、 that one want to confirm Posting date will be date on which Confirmation will be posted Reason for Var.,the reason for deviation of Confirmed Quantity to Planned Quantity. Plant wise reason codes are provided as F4 values. click on Observe the following Message Page 3 of 11 TESTING: UNIT TESTING /

6、USER MANUALMODULE: PRODUCTION PLANNING Again go to the CO11N for confirmation of another operation for the same order no If there is no further operation the system will give you the following Message Page 4 of 11 See the Message Click Here TESTING: UNIT TESTING / USER MANUALMODULE: PRODUCTION PLANN

7、ING For order confirmation there are three transaction codes CO11N But CO11N transaction code will be used. For the material 311323000049 (collector Ring) there are Four operation. So we need to confirm the order no 85000012 four time for the four operations for t-code CO11N Go to CO11N 2.2Input Scr

8、een Name Time Ticket For Production Order: Initial Screen Description of the FieldNature of the FieldValue of the Field OrderMandatory Enter the order no 85000012 OperationMandatoryEnter the operation 0010 yieldOptionalEnter the no. of Item See the following screen Page 5 of 11 TESTING: UNIT TESTING

9、 / USER MANUALMODULE: PRODUCTION PLANNING After hitting the enter in above screen the following screen appears Page 6 of 11 TESTING: UNIT TESTING / USER MANUALMODULE: PRODUCTION PLANNING Just Save the file (ctrl+s) The following message appears on the screen This is only confirmation for the operati

10、on one Follow the procedure for remaining operation Page 7 of 11 TESTING: UNIT TESTING / USER MANUALMODULE: PRODUCTION PLANNING Operation 0020 2.3Input Input Screen Name Time Ticket For Production Order: Initial Screen Description of the FieldNature of the FieldValue of the Field OrderMandatory Ente

11、r the order no 85000012 OperationMandatory Enter the operation 0020 yieldOptionalEnter the no. of Item Follow the same Procedure for the operation 0030 & 0040 by Entering T-code CO11N Page 8 of 11 TESTING: UNIT TESTING / USER MANUALMODULE: PRODUCTION PLANNING For Last operation, please select follow

12、ing Tab If the confirmed order is of Finish Good then do the Goods Receipt for the same product by entering the T-code MB31 other wise just check the stock by T-code MMBE & you will observe the quantity is increase by the confirmed quantity at production storage location. Also you can change the tim

13、e & work centre that is provide in the routing while confirming the order for such process please see the following screen After entering the order no. & operation No. We will get all the standard data as per the routing data Here we can mention the work center that is actually used while going for

14、the machining process Also can be entered the original time that has been taken for the machining. Page 9 of 11 TESTING: UNIT TESTING / USER MANUALMODULE: PRODUCTION PLANNING Above screen shows all the standard data, While following screen shows the changed data according to the physical process The

15、 actual time may be vary fro time entered in the routing then we can change this time to actual time Also same for the work centre Down Time is the time for which the Work Centre was down. Shift tab is used to mention, in which Shift the Order was confirmed. In COOIS report, Shift wise production co

16、nfirmation order can be seen. SHIFT values are 1, 2, 3. Outcome of the Testing using the T-code CO11N 1) Order confirmation is to be done stage wise 2) Partial or Full Quantity can be confirmed. Page 10 of 11 TESTING: UNIT TESTING / USER MANUALMODULE: PRODUCTION PLANNING 3) Time for the machining can be maintain as per the actual tme 4) Actual work center can be maintain without hang