1、 Low voltage panels1、Participants in FAT12. Location13、Date14、Item standard15、Purpose16、Inspection Contents16.1 Documents16.2. Equipment Inspection Items36.2.1 Visual inspection36.2.2. Routine Inspection Items56.2.3 Problem List67. FAT Record78. Attachments81、Participants in FATl Supervisor:l Genera

2、l contractor:l Manufacturer:.2. Location 3、Date 4、Item standardl Related product standards and specificationsl Factory Acceptance Test Outline5、PurposeFactory Acceptance Test can operate safely and dimensions of the equipment meet the requirements in the contract and related standards.6、Inspection C

3、ontents 6.1 Documents No.NameContentsQualified or Not(,X)Remarks1Qualification certificateQuality, environment, occupational health, and other management systemQualification of manufacturers2Factory inspection report Performance and function test reports of main parts3Main component1.Product quality

4、 certificate and related certificate documents 2.Product Certificate from supplier and incoming inspection report 3.Purchasing acceptance record and parts in-out records Inspector : Date: 6.2. Equipment Inspection Items 6.2.1 Visual inspection No.Test itemsInspection standardResultsQualified orNot(、

5、X)Remarks1Nameplate and markWhether the installation is reliable, label content is correct.2SprayThe panel color should be RAL7032,and the spraying element should be no flow marks, loss, and damage.3Mechanical operation components, interlocking, lock action reliabilityHuman subjects components, oper

6、ation is flexible and reliable4Wire and cable arrangementLayout is correct5Element selection and installationThe choice for element type should be correct, the element installation position should be correct, and element should be in order.6Parts of fixed connection reliabilityWhether or not the con

7、nection good contacts7The correctness of electrical circuitElectricity for five times, each time 1 s, instrument is normal, switch action is reliable8The reliability of the mechanism operationThe installation within the device switch electrical and all components of the manual operation for 5 times,

8、 whether the agency action is reliable, normal9Cabinet sizeRequirements for Height width depth should be 2200mm 800mm 1000mmInspector: Date:6.2.2. Routine Inspection ItemsNO.Inspection itemsInspection standardResultsQualified orNot(、X)Remarks1Test the effectiveness of the protective circuitInstrumen

9、t door-to-ground 100mCradle-to-ground 100mMain switch base ground 100mBus clip bracket to ground 100mBreaker switch base ground 100m2Dielectric properties testBetween live parts and insulated operating handle3.75KV/1SBetween live parts and exposed conductive parts2.5 KV/1SBetween each pole and conne

10、cted to the exposed conductive parts of other poles 2.5 KV/1SBetween the main and auxiliary circuits not directly connected with the main circuit2 KV/1S3Insulation resistancerelative insulation resistance should be voltage1K/V1K/V 4ClearanceBetween the main circuit bare conductors of different polar

11、ity 5.5 mmBetween the main circuit of bare conductors with the housing 5.5mmCreepage distanceBetween the main circuit bare conductors of different polarity 10 mmBetween the main circuit of bare conductors with the housing 10 mmInspector: Date:6.2.3 Problem List NO.DescriptionModification RecordRecor

12、ded by: Date: 7. FAT Record FAT Record of Low Voltage panels for Mombasa-Nairobi Standard Gauge Railway ProjectDate: Location:NO.Function CategoryTest ltem and StandardsTest resultConclusion1Visual inspectionRefer to section 6.2.1Refer to section 6.2.1PassFailure2Routine Inspection ItemsRefer to sec

13、tion 6.2.2Refer to section 6.2.2PassFailure3Problem ListRefer to section 6.2.3Refer to section 6.2.3PassFailureConclusion:ManufacturerSign:General contractorSign:SupervisorSign:SupervisorSign:8. Attachments Attachment 1:Technical SpecificationAttachment 2:Product certification certificateAttachment 3:Signature List of Factor Acceptance Test Members