油藏监测和增产新技术

上传人:ni****g 文档编号:587388745 上传时间:2024-09-05 格式:PPT 页数:25 大小:9.75MB
返回 下载 相关 举报
油藏监测和增产新技术_第1页
第1页 / 共25页
油藏监测和增产新技术_第2页
第2页 / 共25页
油藏监测和增产新技术_第3页
第3页 / 共25页
油藏监测和增产新技术_第4页
第4页 / 共25页
油藏监测和增产新技术_第5页
第5页 / 共25页
点击查看更多>>
资源描述

《油藏监测和增产新技术》由会员分享,可在线阅读,更多相关《油藏监测和增产新技术(25页珍藏版)》请在金锄头文库上搜索。

1、New technologies for reservoir monitoring and production increasing 油藏监测和增产新技术油藏监测和增产新技术Consulting service (DCS), Schlumberger斯伦贝谢 咨询服务Consulting Services Focus咨询服务重点In-time operations support, leveraging superior Schlumberger measurementsActionable business solutions through expert integration and

2、interpretation of exploration and production dataOptimal development strategies for life of fieldReduce Reservoir Risk and Uncertainty23Data and Consulting ServicesSubsurface expertise 2000+ Petroleum & Geosciences Experts in DCS worldwidelocal knowledgeall relevant domainsIndustrys largest petroleu

3、m engineering and geosciences consulting organizationOver 700+ studies in 85 countriesKnowledge to select segment technologyOther 10%Technicians 9%Reservoir/Production 29%Geophysicists 15%Geologists 14%Petrophysicists 23%4INTEGRATED PROJECTS5ADD WORLD MAPAndDCS Consulting offices here.CS PROJECT EXP

4、ERIENCE EOR ProjectIntegrated Project6Geoscience Centre, Beijing*SKK, Fuchinobe*Technology Hub, Kuala LumpurReservoir EngineeringDrilling EngineeringCompletion EngineeringGeomechanicsWell PlacementPerforatingSand Management*Technology Hub, Abu DhabiReservoir EngineeringGeomechanicsGeophysicsRT HubDr

5、illing EngineeringCompletions EngineeringMultilateralsWell PlacementWater Management*Carbonate Reservoir Research, DhahranMEA Technology Support Resources中东亚太区技术支持资源*Mumbay sub basalt RC7FMI .Fracture DensityFracture aperture Matrix porosityFracture porosity Fracture parameters definition using FMI

6、interpretation 通过通过FMI确定裂缝参数确定裂缝参数 8岩石物理岩石物理现今最大主应力方向现今最大主应力方向DSI快横波方位角钻井诱导缝走向9裂缝置信度剖面图裂缝置信度剖面图NWSE高低Fractures Distribution Integrated Study on Ordovician Reservoir in TaZhong10Tg5-1TopInt. 2TopInt. 3TZ 82Interval 2Interval 38282SeismicInterpretation地震解释Petrophysical Analysis常规测井数据常规测井数据/对比对比/测井分析测井

7、分析Multiple Attribute Analysis SeisClass多属性分析多属性分析- SeisClassCoreFMIWorkflow研究流程Integrated Study on Ordovician Reservoir in TaZhong11Net Pay Distribution Integrated Study on Ordovician Reservoir in TaZhong12Seismic inversion 地震反演技术1.Fig.1 Initial seismic interpretation with low resolution. Acoustic i

8、mpedance “smooth near the faults. 2.Fig.2 clear fault and acoustic impedance interpretation after applying seismic inversion 1.2.13Correlation between seismic attributes and well log interpretation井眼控制下的地震属性研究Well 6Well 6aWell 4.Well 3.Well 2.Well 1acoustic impedancePorosity modelfrequency Litology

9、modeling143D fracture modeling三维裂缝模型Well3 - dryWell 2 Well 1 - BestWell interference analysis IncludedBased on our recommendation well 1 was drilling the client meet expectation15Water is the No.1 problem for Mature Fields产水是油田开采后期的最大难题产水是油田开采后期的最大难题Oil77 MBPDWater220 MBPDHistoricallyAverage worldwi

10、de water cut of 75% Industry Opex cost is $0.50/bbl ($40 B total)Fragmented approach to water handling16Well Diagnosis油井诊断log WOR vs log timeChoke-back analysisCHFROH-PressuresCH-PLT17Problem Types 水问题类型SimpleComplex341256879101/2Tubing packer leak 封隔失效封隔失效Flow behind casing 窜层窜层 Oil Water Contact m

11、oving up油水界面上移油水界面上移 -High permeability layer without crossflow 高渗层高渗层Fissures between injector and producer天然裂缝高天然裂缝高导流导流 Fissures/fractures from a water layer裂缝贯通水裂缝贯通水层层 Gravity segregated layer 重力分异重力分异Coning 底水锥进底水锥进 Poor areal sweep 低扫油效低扫油效率率High permeability layer with crossflow 高渗层窜流高渗层窜流18

12、Reservoir Diagnostics油藏诊断Understanding of water production mechanism at reservoir level 产水机理Understanding of pressure support 地层压力变化Water production analysis 产水分析Important: make sure breakthrough threshold makes sense 临界条件的把握19Water-oil ratio change after waterflood front break-through 水突破后的水油比变化水突破

13、后的水油比变化Year 1997Year 2003Year 1987Year 1992 Example C-K field20earlierearlierRemaining Reserves 2D distribution (from DCA)Water break-through mapWells-candidate for testingProduction Engineering Analysis 生产动态分析生产动态分析Example C-K field21Base CaseForecast on 2013Optimization Scenario Forecast on 2013Oi

14、l production WCUTRecommendation for Waterflood optimization 注水优化注水优化Example C-K field22Horizontal wells number (include horizontal sidetrack) 10 % from total foundAnnual Oil Production from horizontal wells 40% from Cum Field ProductionMonthly Oil production was doubled from 2002 to 2003 Project sta

15、rt 11/2000 1970 1980 1990 2000 2003Cumulative Oil Production HistoryField Development Optimization Example from North Siberia (DCS, Schlumberger)油田开发优化北西伯利亚(斯伦贝谢油田开发优化北西伯利亚(斯伦贝谢DCS)23Where Water Management was Implemented斯伦贝谢实施水管理项目的其他记录 Shell North Sea/Brent AGIP Nigeria/Port Harcourt Norsk Hydro Norway/Snorre Lasmo Venezuela/Dacion O/S South America Water Control Producer wells Water Control Producer wells WC Producer Wells/Injector Opt. Field review Field approachAssetSolution Scope24Questions?25

展开阅读全文
相关资源
正为您匹配相似的精品文档
相关搜索

最新文档


当前位置:首页 > 高等教育 > 研究生课件

电脑版 |金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号