《钢结构防火涂料施工方案(Construction+scheme+of+fireproof+coati》由会员分享,可在线阅读,更多相关《钢结构防火涂料施工方案(Construction+scheme+of+fireproof+coati(22页珍藏版)》请在金锄头文库上搜索。

1、钢结构防火涂料施工方案(Construction scheme of fireproof coating for steel structure)钢结构防火涂料施工方案(Construction scheme of fireproof coating for steel structure) Steel structure fireproof paint construction scheme of.Txt24 life is like the sea, tolerance for a boat, boating Yu Hai, known as the wide sea life; howe

2、ver, tolerance for size, path hiking, we know the tall hill; life Cantabile, tolerance is the song, and the song and the song, that song。 This paper is contributed by gsqyhslla DOC documents may experience poor browsing on the WAP side。 It is recommended that you select TXT first or download the sou

3、rce file to the local machine。 Fire retardant coatings for steel structures Construction scheme Jiangsu state farms Construction Engineering Co。, Ltd。, November 25, 2010 One 1 Construction Technology Raw materials for steel structure derusting, cleaning materials, paint quality assurance, supervisio

4、n and acceptance, primer supervision, acceptance, quality assurance, primer construction supervision, acceptance supervision acceptance Erection work, erection of safety net with scaffold Supervision and acceptance of hidden engineering records, rectification supervision, re examination and acceptan

5、ce, comprehensive cleaning The main construction supervision construction supervision and acceptance acceptance finish complete curing acceptance 1。1 preparation before construction: 1.1。1 safety facilities set: 1。1.1。1 scaffolding: 1 according to the actual needs of the construction is firmly fixed

6、 on the body, scaffolding to horizontal and vertical Two The foundation is laid on the same horizontal plane for setting up the construction platform。 The results after the first, the first construction of the steel structure, after the construction of supporting structure。 Bamboo or wooden board er

7、ected in scaffolding, furnishings and stable fixation, group Construction platform, construction personnel standing on top of construction work。 Erection of 1。1。1。2 safety net: For the suspended parts, it is necessary to set up a safety net in the lower part of the building。 The safety net must be f

8、irm and reliable, and be fixed on the steel structure with bearing capacity. 1.1.1。3 wear seat belts, all constructors must work at high altitude Wear safety belt, safety belt should be high hanging bottom, forbid hanging, not wearing, wearing without locking. 1.1。2: 1.1.2。1 1.1.2。2: raw material in

9、spection of the project by Lanling brand SF ultrathin steel structure intumescent coating. Performance characteristics: The paint does not contain harmful substances such as asbestos, and has no special characteristics in production, construction and use Special pungent odor。 The results of the thin

10、 coating, good decoration, to load the protected light steel structure。 The coating prepared by the factory, using one component packaging, stir in the construction site Coating construction。 The coating can be applied by brush, roller coating and spraying method, also can use one or several Combine

11、d with construction, the coating can be painted at lower temperature。 It is the food with excellent performance, fast drying, moisture resistance, water resistance and good resistance to freezing and thawing; finish according to the requirements of users can make up all sorts of color。 Main performa

12、nce: Three 1。1.2。3 1 Appearance and color: uniform dense fluid, no agglomeration, the same color, should be No significant difference in the results, it is; the surface dry: not more than 1 hours; bond strength: not less than 0.15Mpa; earthquake: the deflection of L/200, coating layer, glabrescent;

13、bending resistance: flexural L/100, coating layer, do not fall off; water resistance: soaked in tap water for 24 hours or more, coating no change; resistance to freezing and thawing: more than 15 times. Fire retardant paint must have warranty or inspection report. The supervisor shall check the qual

14、ity according to the warranty or inspection report and performance index 1。1.2.4 1。1.2.5 verification. 1.1。3 other aspects of preparation: 1。1。3.1 1。1。3。2 1.1。3.3 design and other technical documents are complete。 Establish QA system and make warranty plan. Compile and complete construction plan。 Te

15、chnical disclosure and safety education are carried out Technician job review。 1。1。3。4 1.1。3。5 1.1.3.6 construction water and electricity can meet the needs of continuous construction. Protective facilities shall comply with the provisions of safety, hygiene and civilized construction。 Construction

16、equipment, machine tools, testing instruments, instrumentation and other good performance, operation Normal, Conform to the regulations. The quality of 1.1.3。7 anticorrosion body has the certificate of transfer and its appearance quality Check and accept. Four 1.1.3。8 Construction site environment must be guaranteed without ice, frost, rain, snow conditions Under construction, the temperature should be 035 degree