《山东省计划生育服务手册和生育证办理程序》由会员分享,可在线阅读,更多相关《山东省计划生育服务手册和生育证办理程序(1页珍藏版)》请在金锄头文库上搜索。
the provisions of electric power construction engineering quality supervision and quality . 2.4.1.1 the unit works acceptance rate of 100%, the quality evaluation of a total score of 95 or above; 2.4.1.2 regulated Welding NDT inspection 100%, regulated welding a passing rate of 99%, and weld bead appearance; 2.4.1.3 boiler hydraulic