PROJECT CLOSURE REPORT PURPOSE - uidaho.edu.docx

上传人:M****1 文档编号:561970922 上传时间:2023-11-08 格式:DOCX 页数:30 大小:172.60KB
返回 下载 相关 举报
PROJECT CLOSURE REPORT PURPOSE - uidaho.edu.docx_第1页
第1页 / 共30页
PROJECT CLOSURE REPORT PURPOSE - uidaho.edu.docx_第2页
第2页 / 共30页
PROJECT CLOSURE REPORT PURPOSE - uidaho.edu.docx_第3页
第3页 / 共30页
PROJECT CLOSURE REPORT PURPOSE - uidaho.edu.docx_第4页
第4页 / 共30页
PROJECT CLOSURE REPORT PURPOSE - uidaho.edu.docx_第5页
第5页 / 共30页
点击查看更多>>
资源描述

《PROJECT CLOSURE REPORT PURPOSE - uidaho.edu.docx》由会员分享,可在线阅读,更多相关《PROJECT CLOSURE REPORT PURPOSE - uidaho.edu.docx(30页珍藏版)》请在金锄头文库上搜索。

1、Final ReportInteractive Signals for Able-Bodied andDisabled PedestriansUniversity of IdahoNational Institute for Advanced Transportation TechnologyOctober 5, 2009Prepared ByDocument Owner(s)Project/Organization RoleDr. Richard W. WallProfessor, Department of Electrical andComputer EngineeringDr. Jam

2、es FrenzelAssociate Professor, Department of Electrical and Computer EngineeringProject Closure Report Version ControlVersionDateAuthorChange Description1.09/20/2009R.W. Wall1.19/30/09R.W. WallBudget Details1.210/1/2009J.F. FrenzalEditorial Corrections1.310/4/09T. NobleEditorial CorrectionsNoteBudge

3、t PerformanceBudget CategoryFY08 Adjusted BudgetYear to DateEncumbered/ Projected CostsBalance01-Salaries$44,535.59$1,230.40$-$43,305.1902-Fringes$4,138.00$20.60$4,117.4003-lrregular Help$2,504.95$1,464.36$1,040.5904-Travel$4,133.15$2,214.07$-$1,919.0805-Other Expense$1,267.31$1,194.17$-$73.1406-Cap

4、ital 5K$5,300.00$318.49$-$4,981.5107-Capital Outlay 5K$6,922.45$5,882.94$-$1,039.5107-Capital Outlay 5K$4,105.50$4,105.50$-$-08-Reserve$-$-$-$-09-Overhead$-$-$-$-10-Tuition/Stipends$2,606.00$2,606.00$-$-Total$68,557.91$56,777.91$-$11,780.004.5 Metrics Performance RecommendationsRecommendation 1. Res

5、earch by our team on the remote pedestrian assistant will be suspended at its present state of development.Justifications:a. Inaccurate positioning information: Current GPS infrastructure does not have the required accuracy, availability, or coverage to provide an adequate degree of safety needed fo

6、r pedestrian guidance in hazardous environments.b. Accurate directional information: Current electronic compass technology is susceptible to errors generated by local dynamic environment conditions.c. Insufficient range and availability of communication with the traffic control system: Bluetooth com

7、munications does not have sufficient range to support the necessary communications for real time control. Cell phone technology does not have the required reliability for real time safety-critical control.Advantages:a. Research effort can be focused on developing infrastructure capability.b. Cost of

8、 cell phones will drop as the technology matures.c. The demonstration of need draws in additional researchers to address the current problems.d. New GPS technology is under development in the US and Europe that may soon resolve GPS accuracy issues.Disadvantages:a. Loss of advanced navigational assis

9、tance.Risk: The safety advantages associated with the tracking, orientation and guidance capabilities continue to put low vision pedestrians at risk but no more so than currently exists.Action: New technology has been uncovered and is being investigated. The enabling infrastructure provided by the h

10、ardware platform for AAPS Rev 4 is capable of merging a diverse set of positioning technologies and communications schemes.(For additional information, see httD:/)Recommendation 2. Redesign the accessible pedestrian button based upon a more capable microprocessor.Justifications:a. The processor used

11、 in the first design has insufficient resources: Cypress design utilized all memory resources supporting minimum advanced features.b. Savings in pedestrian button reduces system cost: More robust development tools inherently results in more reliable designs with less development effort.c. Fewer elec

12、tronic devices results in increased product reliability.d. Fewer components reduce manufacturing and fabrication costs.e. Additional system functionality is anticipated when the next version of the MUTCD is published.Advantages:a. The cost of the single high performance processor is less than the co

13、st of the eight electronic devices replaced on the design based on the Cypress programmable system on a chip (PSoC) microprocessor.b. A total system cost savings was possible by using a processor with more integrated resources. The new design results in a 60% reduction in component cost per pedestrian station. This savings has a multiplier of 2 to 16 depending on the intersection design.Disadvantages:a. Extends development time.b. Higher cost for development software.Risk: Increased development time and expense delays product introduction.Action: Second design iteration of the Ad

展开阅读全文
相关资源
正为您匹配相似的精品文档
相关搜索

最新文档


当前位置:首页 > 办公文档 > 解决方案

电脑版 |金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号