CCNA-4 EWAN NAT/ACL PT Practice SBA

上传人:ni****g 文档编号:560571779 上传时间:2023-02-15 格式:DOC 页数:4 大小:86KB
返回 下载 相关 举报
CCNA-4 EWAN NAT/ACL PT Practice SBA_第1页
第1页 / 共4页
CCNA-4 EWAN NAT/ACL PT Practice SBA_第2页
第2页 / 共4页
CCNA-4 EWAN NAT/ACL PT Practice SBA_第3页
第3页 / 共4页
CCNA-4 EWAN NAT/ACL PT Practice SBA_第4页
第4页 / 共4页
亲,该文档总共4页,全部预览完了,如果喜欢就下载吧!
资源描述

《CCNA-4 EWAN NAT/ACL PT Practice SBA》由会员分享,可在线阅读,更多相关《CCNA-4 EWAN NAT/ACL PT Practice SBA(4页珍藏版)》请在金锄头文库上搜索。

1、EWAN NAT/ACL PT Practice SBAA few things to keep in mind while completing this activity:1. Do not use the browser Back button or close or reload any Exam windows during the exam.2. Do not close Packet Tracer when you are done, it will close automatically.3. Click the Submit Assessment button to subm

2、it your work.IntroductionIn this practice Packet Tracer Skills Exam, you are expected to:Finish designing the IP addressing scheme.Implement the addressing in the network to meet the stated requirements.Configure and verify a DHCP server implementation.Configure and verify WAN technologies.Configure

3、 EIGRP to enable communication with the rest of the network.Configure NAT to translate addresses for traffic destined to the Internet.Implement access control lists as part of a security policy.Addressing TableDeviceInterfaceAddressSubnet MaskDefault GatewayR1Fa0/0172.16.1.193255.255.255.224n/aS0/0/

4、0172.30.1.1255.255.255.252n/aS0/0/1.10110.10.10.1255.255.255.252n/aR2S0/0/0172.30.1.6255.255.255.252n/aS0/0/1.20110.10.10.2255.255.255.252n/aS0/1/0209.165.201.2255.255.255.252n/aR3Fa0/0172.16.1.129255.255.255.192n/aS0/0/0172.30.1.2255.255.255.252n/aS0/0/1172.30.1.5255.255.255.252n/aPC1NIC172.16.1.22

5、2255.255.255.224172.16.1.193PC3NICDHCP AssignedDHCP AssignedDHCP AssignedNOTE:Use a printed version of these instructions to fill in the missing address information in the table during Step 1 to aid in configuring, verifying and troubleshooting the devices.NOTE:The password for user EXEC mode iscisc

6、o. The password for privileged EXEC mode isclass.Step 1: Finish the IP Addressing Design and Implementation.Design an addressing scheme and fill in the Addressing Table based on the following requirements:a.Subnet the address space 172.16.1.128/25 to provide 50 host addresses for the R3 LAN while wa

7、sting the fewest addresses.b.Assign the first available subnet to the R3 LAN.172.16.1.128/26c.Assign the first (lowest) address in this subnet to the Fa0/0 interface on R3. 172.16.1.129/26d.Subnet the remaining address space to provide 30 host addresses for the R1 LAN while wasting the fewest addres

8、ses.e.Assign the next available subnet to the R1 LAN.172.16.1.192/27f.Assign the first (lowest) address in this subnet to the Fa0/0 interface on R1. 172.16.1.193/27g.Assign the last (highest) host address in this subnet to PC1.172.16.1.222/27h.Finish the IP addressing configuration:Configure R1 and

9、R3 LAN interfaces with IP addressing.Configure PC1 with IP addressing. PC3 will get its address from the DHCP server on R3 in the next step.Step 2: Configure and Verify R3 as the DHCP Server.a.Configure R3 as the DHCP server for the LAN attached to Fa0/0 using the following guidelines:Use the case-s

10、ensitive DHCP pool name ofR3_LAN.Exclude the first three host addresses in the subnet. 132190b.Verify that PC3 now has full IP addressing. It may be necessary to toggle between “Static” and “DHCP” on the IP Configuration screen for PC3 before PC3 will send a DHCP request. PC3 should be able to ping

11、the default gateway.Step 3: Configure WAN Technologies.a.The link between R3 and R2 uses PPP with CHAP. The password isciscochap. Verify that R3 and R2 can ping each other.b.The link between R3 and R1 uses HDLC. R3 should be able to ping the other side of the link. Verify that R3 and R1 can ping eac

12、h other.c.The link between R1 and R2 uses point-to-point Frame Relay subinterfaces. Verify that R1 and R2 can ping each other.Step 4: Configure and Verify EIGRP Routing.a.Configure EIGRP routing on R1, R2, and R3.Use AS number 100.Do not use the wildcard mask argument.Do not advertise the network be

13、tween R2 and the Internet.b.Configure R2 with a default route using theoutbound interfaceargument. Use one command to propagate the default route into the EIGRP routing process.c.Verify PC1 and PC3 can ping each other as well as R1, R2 and R3. You will not be able to ping Internet hosts yet.Step 5:

14、Configure R2 with a NAT.a.Configure NAT on R2 using the following guidelines:Only addresses in the 172.16.1.128/25 address space will be translated.Use the number1for the access list.Configure PAT on the R2 S0/1/0 interface.b.Verify that PC1 and PC3 can ping the Internet hosts.Step 6: Configure Access Control Lists to Satisfy a Security Policy.a.Configure and apply an ACL with the number50that implements the following policy:Deny any host from the R3 LAN from accessing hosts on the R1 LAN.Hosts on the R3 LAN should be ab

展开阅读全文
相关资源
相关搜索

当前位置:首页 > 建筑/环境 > 施工组织

电脑版 |金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号