配音最后translation.doc

上传人:壹****1 文档编号:559854363 上传时间:2023-08-29 格式:DOC 页数:10 大小:55.50KB
返回 下载 相关 举报
配音最后translation.doc_第1页
第1页 / 共10页
配音最后translation.doc_第2页
第2页 / 共10页
配音最后translation.doc_第3页
第3页 / 共10页
配音最后translation.doc_第4页
第4页 / 共10页
配音最后translation.doc_第5页
第5页 / 共10页
点击查看更多>>
资源描述

《配音最后translation.doc》由会员分享,可在线阅读,更多相关《配音最后translation.doc(10页珍藏版)》请在金锄头文库上搜索。

1、2010艾格特热水器安装演示配音稿2010 VOICE DRAFT OF AGTHEAT PUMP WATER HEATERS INSTALLATION一、 艾格特热水器产品安装:一、AGT heat pump water heaters installation:艾格特产品安装工具配件依次为AGTs Installation accessories as followings: 卷尺tape measure, 水平仪spirit level, 冲击钻impact drill, M14、M12、M6冲击钻头M14,M12,M6 impact drill, 手锤hand hammer, 活动扳手

2、adjustable wrench, 生料带PTFE Tape, 铜弯头copper elbow, 铜外牙直通copper outer teeth straight, 铜内牙直通straight teeth within copper, brass teeth elbow, 1/2不锈钢外牙直通1/2 stainless steel outer straight teeth, 1/2不锈钢三通1 / 2 stainless steel tee, 螺丝刀screwdrivers, 电工胶布insulation tape, 尼龙扎带nylon cable tie, 冷热水铝塑管hot and co

3、ld water aluminum tube, 10软管 10 tube, 以及随机配件M12*100和M10*80膨胀螺丝and matched accessories M12 * 100 and the M10 * 80 expansion screws, M10*35、M8*35和M8*25不锈钢螺丝M10 * 35, M8 * 35 and M8 * 25 stainless steel screws, 卸压阀unloading pressure valve, 排水嘴water out connection, 排水管drain pipe, 防震胶shockproof glue, 1/2

4、单向止回阀等等1 / 2 one-way back valve and so on.1. 确定安装位置,根据用户外墙不同情况灵活决定Determine the location of installation flexibility, according to the different situations of userss external walls: 主机与水箱必须装在实心承重墙上the host and the tank must be installed in the solid load-bearing walls, 主机和水箱安装为上下式还是左右式the location o

5、f host and water tank installed can be either up-down or left-right , 注意主机和水箱间隔不要超过三米please pay attention to the distance between host and tank ,no more than 3 meters,2.用水平尺确定水箱支架位置Determine the location of the Water tank with a spirit level, 用笔标记出位置,并M14钻头打孔mark the location with the pen and drill

6、hole with M14 hand hammer, 用手锤将随机配备的M12*100膨胀螺丝敲入孔内then hit the M12 * 100 expansion screws into the hole, 牢牢固定水箱支架fix tank bracket firmly, 将水箱抬上水箱支架water tank will be loaded onto tank bracket, 用随机配备的M10*35的不锈钢螺丝固定水箱支脚fix the foot of water tank with the M10 * 35 stainless steel screws, 确保水箱使用安全。 ensu

7、re the safety for using of water tank .3.用随机配备的M8*25组装随机附带的主机支架Assemble and install the host bracket with the M8 * 25, determine the location of host with the spirit level, 用水平尺确定主机支架位置,用笔标记出位置,更换M12钻头打孔mark the location with the pen and drill hole with M12drill, 用手锤将随机配备的M10*80膨胀螺丝敲入孔内then hit the

8、M10*80 expansion screws into the hole, 牢牢固定主机支架fix host bracket firmly, 将主机抬上主机支架,用随机配备的M8*35加防震胶固定主机支脚host will be loaded onto host bracket, fix the foot of host with M*35 and shockproof glue, 确保主机使用安全ensure the safety for using of host. 4.打开水箱循环进水口盖子Open the tank lid of water in, 用1/2不锈钢内节打二十圈左右生料

9、带连接1/2单向止回阀,connect to the 1 / 2 one-way back valve with 1 / 2 stainless steel hex nipple winded with PTFE tape about 12 circles, 单向止回阀箭头指向水箱外arrow on the one-way back valve points to the outside the water tank, 再用1/2不锈钢内节连接1/2不锈钢三通and then connect 1 / 2 stainless steel hex nipple to the 1 / 2 stain

10、less steel tee, 三通另一头接卸压止回阀接自来水the second side of the tee connects to the unloading pressure valve which connects to the tap-water. 卸压止回阀箭头指向三通Arrow on the unloading pressure valve points to the tee, 三通另一头用水管联接到主机进水口the third side of the tee connected with hose connects to the host. 主机出水口用水管联接水箱循环出水

11、口。 The water input of the host connects to the water tank with hose. 水箱出热水口联接到中央热水管道。 The water output of tank connects to the central hot water pipes.5.打开自来水阀门和热水龙头,直到热水龙头有水出Open the tap-water valve and hot water tap until the water flows from the hot tap, 关闭热水龙头then close the hot water tap.6.以十字螺丝

12、刀打开主机盖线板Open the cover line board with the cross screwdriver, 随机配备的4MM*3芯电源线一头接主机双色地线接第三位接线柱 connect one side of 4MM*3 power cable to the leakage protection switch, 第一位接线柱接火线the other side of power cable including three electric wires, 第二位接线柱接零线the two-color earth wire connects to the third terminal

13、 of host, 电源线另一头接随机配备的漏电开关(北方机型)the Live wire connects to the first terminal ,the null wire connects to the second terminal(northern models); 将开关盒打开Open the switch box, 里面有4个固定螺丝孔which has four screw holes, 将开关固定好fix the switch , 开关一定要垂直安装and switch must be installed vertically, 安装完毕后装电源线install the

14、 power cable after installing the switch, 线的规格应选4MM*3芯以上the specification of the power cable should be 4MM*3 or above, 上端为电源进线the top is the input power cable, 下端为出线the bottom is the output power cable, 上下两端左边一个为火线(红线) the left one is Live Wire (red wire), 右边为零线(兰线) the right is null wire(blue wire)

15、, 接地线(双色线)earth wire (two-color wire) , 直接短接并包扎好are wrapped directly. 全部安装完毕后After all the installation is completed, 如果开关右边的方型按钮突出if the square switch button on the right side is sticking out , 就将其按下,合上开关即可just press it and close the switch. 解开绑在水箱上的电源线Unlock the power cable tied to the water tank,

16、 剪开外皮露出红、蓝和双色线cut the cover of the power cable, reveal red, blue and two-color wires, 分别将三根电源线的铜芯剪好露出cut a short length cover of three wires, 源线双色地线接主机内第三位接线柱, the two-color wire connects to the third terminal of host, 电源线另两线接第四,五位接线柱the rest of two wires connect to the fourth and the fifth terminals, 北方机型配备的电热带平铺在自来水管上用随机配的铝泊线粘好the electro-thermal wire of North model should be put on the pipe wrapped with the aluminized paper, 套好随机配的保温管再用随机配的空调包装带缠好cover th

展开阅读全文
相关资源
相关搜索

当前位置:首页 > 生活休闲 > 社会民生

电脑版 |金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号