Hazard Reporting and HSE Inspection Safe work instruction 安全工作指导 非洲矿业有限公司AML HSE安全管理制度 英文版.doc

上传人:汽*** 文档编号:559345180 上传时间:2023-03-15 格式:DOC 页数:4 大小:117KB
返回 下载 相关 举报
Hazard Reporting and HSE Inspection Safe work instruction 安全工作指导 非洲矿业有限公司AML HSE安全管理制度 英文版.doc_第1页
第1页 / 共4页
Hazard Reporting and HSE Inspection Safe work instruction 安全工作指导 非洲矿业有限公司AML HSE安全管理制度 英文版.doc_第2页
第2页 / 共4页
Hazard Reporting and HSE Inspection Safe work instruction 安全工作指导 非洲矿业有限公司AML HSE安全管理制度 英文版.doc_第3页
第3页 / 共4页
Hazard Reporting and HSE Inspection Safe work instruction 安全工作指导 非洲矿业有限公司AML HSE安全管理制度 英文版.doc_第4页
第4页 / 共4页
亲,该文档总共4页,全部预览完了,如果喜欢就下载吧!
资源描述

《Hazard Reporting and HSE Inspection Safe work instruction 安全工作指导 非洲矿业有限公司AML HSE安全管理制度 英文版.doc》由会员分享,可在线阅读,更多相关《Hazard Reporting and HSE Inspection Safe work instruction 安全工作指导 非洲矿业有限公司AML HSE安全管理制度 英文版.doc(4页珍藏版)》请在金锄头文库上搜索。

1、 AFRICAN MINERALS LIMITEDHazard Reporting & HSE InspectionsBMS-P-0409Rev 1Page 4 of 4HAZARD REPORTING & HSE INSPECTIONSDocument Custodian:Manager HSEDocument Checked:Document Approved:TABLE OF CONTENTS1.0SCOPE AND OBJECTIVES22.0PROCEDURE22.1.General22.2.Hazard Identification22.3.Hazard Reporting22.4

2、.Hazard Control - Hierarchy of Controls22.5.Project HSE Implementation Plan22.6.Daily HSE Inspections32.7.Weekly HSE Inspections32.8.Monthly Formal HSE Inspection32.8.1.How to use the Project Monthly HSE Inspection Form33.0RELATED DOCUMENTS4 GRD MINPROC LIMITED1.0 SCOPE AND OBJECTIVESThis procedure

3、defines the requirements for project hazard reporting and inspections.There are no restrictions on the distribution of this procedure within the Company.2.0 PROCEDURE2.1. GeneralPotential causes of injury and damage can be effectively eliminated through regular hazard inspection programs and the imp

4、lementation of corrective actions.2.2. Hazard IdentificationHazards can be identified by the following processes: informal, on an as see basis during normal work activities; structured, through a formal inspection program.2.3. Hazard ReportingPersonnel are required and are to be encouraged at all ti

5、mes to identify and control hazards on a see and fix basis where it is in their ability to do so.Hazards that are identified, but outside a persons ability to immediately rectify, should be made safe with barricades, warning signs etc. and immediately reported to the Supervisor.Identified hazards sh

6、ould be recorded on a Hazard Notification form where rectification cannot be completed immediately or where the same hazard is continually being identified. 2.4. Hazard Control - Hierarchy of ControlsWhen assessing the risks of identified potential hazards, always consider risk reduction using the h

7、ierarchy of controls method, note that PPE is the last resort method of control.The hierarchy of controls is simply described as the preferred order of control measures: Elimination of the hazard (i.e. eliminate the risk of a fall) Substitution of the work method (use of EWPs and scissor lifts, asse

8、mbly of steel on the ground in modules) Engineering controls (modify tools to prevent slippage, tie-off ladders) Isolation of the hazard ( put physical barriers in place, cover up holes etc, use of fall restraint equipment e.g. inertia reel lanyards) Administration controls (signs, bunting, JSAs, pr

9、ocedures, site rules) PPE - Personnel Protective Equipment (fall arrest harnesses and shock absorbing lanyards)2.5. Project HSE Implementation PlanThe Construction Manager shall upon occupying the site commence the HSE System Implementation, which is included in the Project HSE Plan. The system shal

10、l be used to record HSE implementation progress.Once the system has been implemented satisfactorily the Construction Manager shall instigate the use of the HSE Supervisor Daily Checklist form to maintain a high level of risk management.2.6. Daily HSE Inspections Personnel nominated by the Constructi

11、on Manager shall perform weekly workplace hazard inspections. The nominated person may be any member of the Project Team.The HSE Supervisor Daily Checklist form shall be used to record daily checks.2.7. Weekly HSE InspectionsPersonnel nominated by the Construction Manager shall perform weekly workpl

12、ace hazard inspections. The nominated person should have a basic understanding of HSE management systems.The weekly inspection is based on a non-scored version of the HSE Monthly Site Audit and Inspection and will permit assessment of the HSE implementation on-site. The purpose of the HSE Weekly Sit

13、e Inspection is to identify any matters that may have been overlooked through the normal daily HSE management process.The HSE Weekly Site Inspection form shall be used to record weekly inspections.2.8. Monthly Formal HSE InspectionFormal HSE inspections using form HSE Monthly Site Audit and Inspecti

14、on will be completed monthly on each project site. These may be held more frequently if deemed to be necessary by the Construction Manager.The purpose of the HSE Monthly Site Audit and Inspection is to conduct a formal internal assessment of HSE implementation in accordance with the relevant HSE Pla

15、n.The HSE Monthly Site Audit and Inspection form may also be used for external corporate audits that will be conducted in accordance with the HSE Management Plan by the Manager HSE or delegated representative.All personnel will make themselves available for participation in the HSE inspection activity as required. The make up of the inspection team shall be decided by the Construction Manager and be fully documented.At the conclusion of the hazard inspection, the inspection team shall meet with the Construction Manager, or a nominated representative and the Pr