1、PAINTING WARRANTEEChengda Engineering Corporation of China (hereinafter referred to as the Guarantor) offers the purchaser Oiltanking Daya Bay Pte Ltd (hereinafter referred to as Owner) the following 10 years guarantee covering the performance of Coating System(s) supplied to Tankfarm at Daya Bay (h

2、ereinafter referred to as the Property).1.01The guarantee covers the provision of replacement coating materials and reimbursement of the cost of preparation and application to be borne by the Guarantor as may be necessary to repair, (in accordance with Section 6), defective coated areas in herein de

3、fined.1.02The guarantee shall commence on the date the property is delivered to Oiltanking Daya Bay Pte Ltd or on the date which the completed application is accepted, whichever shall first occur. The maximum between completed application and delivery to Owner is three months. The guarantee should t

4、hen run either from the date of completed application or latest three months after this.The guarantee period will terminate 10 years from the commencement date, but in the event of sale or transfer of the Property, or upon the Property ceasing to be operated by Owner prior to termination date, this

5、guarantee shall terminate at the date of such sale or transfer.The period of this guarantee shall not be extended in the event of coating repairs being carried out under the terms of this guarantee or otherwise.1.03The guarantee covers the repair of defective coated areas if exceeding 3% of the tota

6、l coated surface/PER TANK, PIPE LINE AND STRUCTURES and falling within the scope of this agreement.1.04An area will be considered defective where the coating film is completely absent, or where pinholing. Porosity or loss of adhesion are encountered which have permitted visible corrosion activity to

7、 occur in a severity greater than “Re-3” (as defined in the “European Scale of Degree of Rusting for Anti-Corrosive Paints” of the European Committee of Paint and Printing Ink Manufacturers Associations).Areas where the coating film exhibits fading, staining or discolourations, or loss of gloss, wil

8、l not be considered defective areas as long as effective protection against corrosion has been provided.2.00No liability shall attach under this guarantee unless the following conditions are strictly complied with.2.01Any contractor to be entrusted with the application of the coating system must hav

9、e been previously approved by the Guarantor.2.02All work connected with application of coating must be approved by the Guarantor.2.03Surface PreparationAll steel surfaces must be treated in line with the specification of the coating system.Before starting the coating all previously blasted surfaces

10、must be carefully cleaned and thereafter approved by the Guarantor and/or his designated representative.2.04Temperature and HumidityApplication must take place within the limits specified by the Guarantor/Manufacturer.2.05Thinners and AdditivesOnly thinners and additives supplied or specified by the

11、 Guarantor/Manufacturer are to be used and they are get to exceed the quantity recommended. Only solvents specified by the Guarantor/Manufacturer are to be used for cleaning equipment.2.06Coating applicationa)The Guarantor/Manufacturers specified procedure of application must be strictly followed.b)

12、The Guarantor/Manufacturers specified minimum and maximum time intervals between applications must be strictly adhered to.c)The Guarantor/Manufacturers specified film thickness must be adhered to.d)Unless the Guarantor/Manufacturer agrees to the contrary, only coating batches for the specified job a

13、re to be used.2.07Surfaces and Coatings Damaged During ConstructionAll damaged surfaces and coatings are to be repaired by the Guarantor so that they are equal to the original standards.2.08The guarantee is contingent upon an APPROVED VENDOR coating inspector(s) providing continuous surveillance ove

14、r the surface preparation, mixing of products application of coating, dry film thickness, etc., throughout the coating operation, areas not coated in conformance with Manufacturers quality standards are excluded from this guarantee.Such areas are to be identified and documented by the Inspector(s) w

15、ho will issue appropriate reports to the Purchaser.2.08Storage of the Coating ConsignmentsAll coatings are to be stored in accordance with conditions specified by the coating Manufacturer.2.10MaintenanceThe coating must be inspected annually by the Owner, Chengda Engineeing Corporation of China and

16、approved vendors inspectors and a condition report submitted to the Guarantor.Damages and coating imperfections amounting to 3% per tank and pipeline surface or less are to be repaired with APPROVED VENDOR products by and at the expense of the Guarantor.2.11Cleaning and Touching-upCleaning and touching-up, if a