《电气仪表工程安装调试记录》由会员分享,可在线阅读,更多相关《电气仪表工程安装调试记录(62页珍藏版)》请在金锄头文库上搜索。
1、母线安装记录Bus installation record项目:Project装置:Unit工号:Sectio n名称Name施工日期Date电压等级VoltagekV图号Drawing No.母线型号、规格 Bus model and spec.套管、绝缘子型号Bushing insulator model1、一般安装检查:General installation inspection序号No.检查调整项目Inspection and adjustment item安装检查结果Inspection result1母线型号、规格、材质核对Bus model, spec, and mat. In
2、spection型号规格材质ModelSpecificationMaterial2绝缘子、穿墙套管检查Insulator and lead-in insulator型号规格油位、密封绝缘ModelOil level, sealInsulation3母线支架制作安装Bus support fabrication and installation规格安装尺寸防腐Spec.DimensionAnti-corrosion4母线安装检查Bus installation排列、相色弯曲倍率伸缩节Arrangement, colorCurve radiusExpansion joint5连接螺栓、垫圈检查Bo
3、lt and washer inspection规格热镀锌露岀长度Spec.GalvanizationLeft length6母线接触面Bus contact area inspection光洁平整搪锡电力复合脂Smooth.Enam.Polymer7硬母线焊接检查Rigid bus welding inspection焊工合格证号Weldor No.8软母线、组合母线安装Flexible and combine bus installation2、母线接触面连接紧密检测:Bus contact. Tightness inspection螺栓规格(mm) Bolt spec.实测力矩Actua
4、l值()torque螺栓规格(mm) Bolt spec.实测力矩值()Actual torque螺栓规格(mm) Bolt spec.实测力矩值()Actual torque最小值Min.最大值Max.最小值Min.最大值Max.最小值Min.最大值Max.3、软母线弛度:Flexible bus sag inspection软母线名称Flexible bus name设计弛度(mm)Design sag实测弛度(mm)Actual sag4、母线相同、对地最小距离检测:Bus phase and phase to earth min. Distance measure母线类别Bus typ
5、e主母线Main分支母线Branch实测最小相间距离(mm)Min. Phase to phase distance实测最小对地距离Min. Phase to earth distance备注:Remarks结论:Conclusion技术负责人Check施工人Operator蓄电池充(放)电记录Storage battery charg in g/Discharg ing record项目Project装置:Un it工号:Sectio n名称Name型号Model岀厂日期Manuf. Date电压VoltageV容量capacityAh电池总数Number of battery电解液Elec
6、trolyte电解液化验单或合格证号Electrolyte report or certification No.蒸馏水化验单或合格证号Distilled water report or certification No.注入时电解液温度Electrolyte temp. at fillingc电解液比重Specific gravity of electrolyte开始注入时间Filling start time结束时间End time初充电First charging充电开始时间Charging start time结束时间End time单独补充充电的电池编号Separately char
7、ged cell No.放电Discharging放电开始时间Discharge start time结束时间End time放电电流Discharge current放电容量Discharging capacity为额定容量的% (换算到25C时)% of rated capacity (at 25 C)充(放)电特性曲线图:(充放电记录见附表)Charging/Discharging characteristic curve备注:Remarks结论:Conclusion技术负责人Check施工人Operator蓄电池充(放)电 记录附表Attached table for storage
8、battery charg in g/Discharg ing record项目Project装置:Unit工号:Sectio n名称Name型号Model出厂日期Manufacture date电压VoltageV容量CapacityAh电池总数Number of battery时间Time允(放)电 电压(V)Charge/Discharge voltage允(放)电 电流(A)Charge/Discharge currentNoNoNoNoNoNoUDTUDTUDTUDTUDTUDT技术负责人Check施工人Operator日期Date电机抽芯检查记录Motor loose-core i
9、n spect ion record项目Project装置:Un it工号:Secti on名称Name位号Tag. No.检查日期Inspection Date型号Type额定容量Rated capacitykW额定电压Rated voltagekV额定电流Rated currentA接法Connection绝缘等级Insulation class转速Rotation speedr/min转子结构Rotor structure防爆等级Explosion proof class岀厂编号Manufacturer No.制造厂Manufacturer防护等级Prevention class检查内容Installation contents标记Mark备注Remark铁芯轴颈无伤痕锈蚀No Damage & corrosion on surface of core shaft滑环和换向器无伤痕、锈蚀No Damage & corrosion on surface of commutator and slip-ring绕组绝缘层完好,绑线无松动Winding insulation coating and fixing inspection绕组连接正确,焊接良好Winding connection and welding inspection绕组电阻检测合