浮法玻璃退火窑壳体安装手册FLOAT GLASS ANNEALING LEHR 1200 MTD INSTALLATION GUIDE

上传人:M****1 文档编号:556803087 上传时间:2022-12-21 格式:DOC 页数:14 大小:660.71KB
返回 下载 相关 举报
浮法玻璃退火窑壳体安装手册FLOAT GLASS ANNEALING LEHR 1200 MTD INSTALLATION GUIDE_第1页
第1页 / 共14页
浮法玻璃退火窑壳体安装手册FLOAT GLASS ANNEALING LEHR 1200 MTD INSTALLATION GUIDE_第2页
第2页 / 共14页
浮法玻璃退火窑壳体安装手册FLOAT GLASS ANNEALING LEHR 1200 MTD INSTALLATION GUIDE_第3页
第3页 / 共14页
浮法玻璃退火窑壳体安装手册FLOAT GLASS ANNEALING LEHR 1200 MTD INSTALLATION GUIDE_第4页
第4页 / 共14页
浮法玻璃退火窑壳体安装手册FLOAT GLASS ANNEALING LEHR 1200 MTD INSTALLATION GUIDE_第5页
第5页 / 共14页
点击查看更多>>
资源描述

《浮法玻璃退火窑壳体安装手册FLOAT GLASS ANNEALING LEHR 1200 MTD INSTALLATION GUIDE》由会员分享,可在线阅读,更多相关《浮法玻璃退火窑壳体安装手册FLOAT GLASS ANNEALING LEHR 1200 MTD INSTALLATION GUIDE(14页珍藏版)》请在金锄头文库上搜索。

1、A4 TAIWAN XIANYANG FLOAT GLASS ANNEALING LEHR 1200 MT/DINSTALLATION GUIDE Folio : 4/13 Etabli le : Drawn on : Par : By : S10G07 A-0600-0T-0300 R00 TAIWAN XIANYANG FLOAT GLASS ANNEALING LEHR 1200 MT/D INSTALLATION GUIDE00 Premire dition / First issue w问题Rv. Nature de la modification / Description 描述N

2、om / Name Date Visa Z.A.I. du Bois de lEpine - 3 rue Jules Guesde Ris-Orangis F-91031 EVRY Cedex- FRANCE Tl. +33 (0)1 60 91 12 34 Etabli le : Drawn on : Par : By : Approuv le : Approved on : Par : By : Vrifi le : Checked on : Par : By : A 4 Folio 1/13 Ce document contient des informations confidenti

3、elles, brevetes ou non, proprit de Fives Stein. La divulgation de ces informations confidentielles est interdite sans lautorisation crite pralable de Fives Stein. This document contains confidential information, patented or not, property of Fives Stein. Disclosure of such confidential information is

4、 prohibited without Steins prior written consent. CONTENTS 1 DESCRIPTION OF THE EQUIPMENT.设备描述 .3 2 STORAGE, ERECTION AND COMMISSIONING REQUIREMENTS WITH INVENTORY OF THE EQUIPMENT .储存,安装,调试.3 3 MATERIALISATION OF MAIN AXES (SEE DRAWING A-0600-A-P-1001).主要轴线变形.4 4 CHECKING OF LAYOUT.布局检查 .4 5 MATERI

5、ALISATION OF ROLL AXES.5 6 HOISTING AND HANDLING INSTRUCTIONS (TXYS SUPPLY).5 7 ADJUSTMENT.6 8 FIXED POINT, EXPANSION GUIDES AND TEMPORARY FASTENING.7 9 ASSEMBLING THE ELEMENTS TOGETHER.7 10 CONNECTING THE EXCHANGER TUBES IN ZONES A-B-C.8 11 INSTALLATION OF FLOORS.8 12 INSTALLATION OF ROLL BUNGS.8 1

6、3 INSTALLATION OF OUTSIDE COOLING DUCTS OF ZONE A, B AND C.8 14 INSTALLATION OF WALKWAYS (ZONES A, B & C).9 15 INSTALLATION OF ZONES D, F .9 16 NECESSARY MATERIAL AND TOOLS FOR ERECTION .10 17 FACILITIES TO BE SUPPLIED ON SITE (TXYS SUPPLY).13 (TAIWAN XIANYANG FLOAT GLASS: TXY)1. DESCRIPTION OF THE

7、EQUIPMENT This specification applies to the installation of an annealing lehr. It describes the main tasks to be carried out for lehr installation. It does not in any case constitute an exhaustive list of operations to be carried out. Installation takes place under the control of the Fives Stein rep

8、resentative(s) who is in charge of co-ordinating the work. The FSS erection supervisor is the only person entitled to modify these recommendations depending on possible problems encountered on the site. The longitudinal and transverse datum lines must be demarcated by means of steel studs embedded i

9、n concrete. Levels too will be marked on steel studs embedded in the floor. The installations concerned by this specification will be built according to the general arrangement, assembly and detail drawings of Fives Stein, taking into account protections required, safety requirements of TXY, erectio

10、n schedule and instructions given on site by Fives Steins site managers. Documents defining this equipment are listed in the lists of drawings composed of the following items : -0600 : General -0610 : Zone A0 -0611 : Zone A -0612 : Zone B -0614 : Zone C -0615 : Zone D -0616 : Zone F -0617 : Roller -

11、0618 : Driving system 2. ERECTION REQUIREMENTS 2.1 Storage requirements All equipment shall be stored properly on site, in a building, close to the erection area, protected from weather conditions and flood risks. 2.2 Erection requirements Fives Stein will consider that the erection could start when the following conditions are fulfilled: Civil work completed (with delivery to Fives Stein of civil work and datum lines survey report) Building completed Handling equipment available Necessary equipment on site Necessary manpower available (with installation schedu