1、ANY ONE OR MORE OF THE FOLLOWING1. TENDER DOCUMENT INCLUDING PROCESS DETAILS2. OVERALL PROCESS DESCRIPTION / DIAGRAM INCLUDING PLANT / UNIT CAPACITY3. LICENSOR PROCESS DETAILS 4. CONCEPT OR PRE-FEED REPORTAVAILABLE - STARTPROCESS DESIGN BASISISSUED FOR COMMENTS (IFC)IS STANDARD FORMAT AVAILABLE ADOP

2、T STANDARD FORMAT WITH FOLLOWING HEADINGS1. ABBREVIATIONS & DEFINITIONS2. INTRODUCTION3. PROCESS DESCRIPTION4. PROJECT SCOPE5. DESIGN6. DESIGN PHILOSOPHY7. DESIGN CRITERIA8. CODES & STANDARDS9. REFERENCES10. LIST OF HOLDS11. APPENDICESGENERATE WORD DOCUMENT. PROCESS DESIGN BASIS MAY INCLUDE BASIS FO

3、R BUT NOT BE LIMITED TO:1. DESIGN PRESSURE2. DESIGN TEMPERATURE3. DESIGN OR MAXIMUM VELOCITIES FOR PIPING / PIPELINES4. NPSHA (PUMP HYDRAULICS)5. FOULING FACTORS (HEAT EXCHANGERS)6. NOZZLE MOMENTUM VALUES (VESSELS / SEPARATORS)7. PIPING ROUGHNESS VALUES8. OPERATION, CONTROL & SAFEGUARDING PHILOSOPHY

4、9. ISOLATION PHILOSOPHY10. DRAIN PHILOSOPHY11. MATERIAL & CORROSION PHILOSOPHY12. UTILITY REQUIREMENT & BATTERY LIMIT CONDITIONS FOR ISBL13. CHEMICAL DOSING REQUIREMENT14. FIRE, SMOKE & GAS DETECTION PHILOSOPHY15. INSULATION REQUIREMENTNOYESCHECK AGAINST DISICIPLINE CHECK LIST & CORRECT IF NECESSARY

5、ISSUE TO CLIENT AS“ISSUED FOR COMMENTS” (IFC)1. REVISE TO INCORPORATE IF IN AGREEMENT2. DISCUSS TO REMOVE IF NOT IN AGREEMENTNO1. BACK CHECK2. SDCREVISE TO INCORPORATEISSUED FOR “IDC” IN FOLLOWING SEQUENCE1. PIPING2. C&A3. MECHANICAL4. ELECTRICAL5. CIVIL6. PIPELINE (IF APPLICABLE)7. PROJECTSCOMMENTS

6、 NO COMMENTSYESCOMMENTSPROCESS DESIGN BASISAPPROVED FOR DESIGN (AFD)“IFC” MASTER COPY - AVAILABLESTARTREVISE TO INCORPORATECLIENTCOMMENTSe.g. CHANGED SOW,PROJECTSCODES & STANDARDSPIPING / PIPELINEe.g. MOC, INSULATION, ISOLATION, DRAIN PHILOSOPHY e.g. CONTROL & SAFEGUARGINGC & AFIRE, SMOKE & GAS DETE

7、CTION MECHANICALe.g. UTILITYREQUIREMENT1. INCORPORATED & REVISE IF IN AGREEMENT2. DISCUSS TO REMOVE IF NOT IN AGREEMENTPREPARE DISCIPLINE CHECKLIST WITH “AFD” REVISIONYESNOISSUE TO CLIENT AS “APPROVED FOR DESIGN” (AFD)NO1. BACK CHECK2. “SDC”COMMENTS ISSUED FOR “IDC” IN FOLLOWING SEQUENCE1. PIPING2. C&A3. MECHANICAL4. ELECTRICAL5. CIVIL6. PIPELINE (IF APPLICABLE)7. PROJECTSCOMMENTS YESREVISE TO INCORPORATE