报告常用语句

上传人:夏** 文档编号:556323259 上传时间:2022-10-30 格式:DOC 页数:2 大小:68.88KB
返回 下载 相关 举报
报告常用语句_第1页
第1页 / 共2页
报告常用语句_第2页
第2页 / 共2页
亲,该文档总共2页,全部预览完了,如果喜欢就下载吧!
资源描述

《报告常用语句》由会员分享,可在线阅读,更多相关《报告常用语句(2页珍藏版)》请在金锄头文库上搜索。

1、Add 1 alternative cord anchorage and the applicants address is changed from NO.7, XiuFeng Road, Gaoqiao Town, Yinzhou, Ningbo, 315000, China to NO.7, XiuFeng Road, Gaoqiao Town, Haishu, Ningbo, 315000, Zhejiang, China.After review, the 5.2.10.3 test has been evaluated and the result is pass.After re

2、view, there is no test needing to be evaluated.For the model whose wattage less than adaptorthe new models and previous model have similar construction and electrical parameters.This is 1000h test report, with switching cycles test, premature failure rate at 1000h ,without lamp survival factor at 60

3、00h, lumen maintenance at 6000h, no obvious defective point was found by visual, test is continued, in case of 6000h endurance test non-compliances could be located.Amendment 1:The original test report ref. No. EFSH16110395-IE-01-L01 dated on 2017-02-17 was modified on 2017-06-13 to include the foll

4、owing changes and/or additions:1. Change IP protection level of models from “IP20” to “IP44”.After evaluation, the follow tests were considered necessary.Clause 1.5(3): MarkingClause 1.13(9): Resistance to dust, solid objects and moistureClause 1.14(10): Insulation resistance and electric strengthThis report should be used in conjunction with the original report No. EFSH16110395-IE-01-L01.

展开阅读全文
相关资源
正为您匹配相似的精品文档
相关搜索

最新文档


当前位置:首页 > 幼儿/小学教育 > 小学课件

电脑版 |金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号