谈后浇带的设计与施工

上传人:M****1 文档编号:553632228 上传时间:2023-06-14 格式:DOC 页数:30 大小:68KB
返回 下载 相关 举报
谈后浇带的设计与施工_第1页
第1页 / 共30页
谈后浇带的设计与施工_第2页
第2页 / 共30页
谈后浇带的设计与施工_第3页
第3页 / 共30页
谈后浇带的设计与施工_第4页
第4页 / 共30页
谈后浇带的设计与施工_第5页
第5页 / 共30页
点击查看更多>>
资源描述

《谈后浇带的设计与施工》由会员分享,可在线阅读,更多相关《谈后浇带的设计与施工(30页珍藏版)》请在金锄头文库上搜索。

1、谈后浇带的设计与施工Abstract: the new release of code for design of concrete structures (GB 50010-, hereinafter referred to as the concrete specification), the reinforced concrete structure of the largest joint spacing requirements than the strict norms, norms used by the word may should be changed to . This

2、requires in the structural design, the designer must be taken seriously due to long to structure the negative influence, when the distance increases or structural joints is no expansion joint, must take practical measures to prevent the cracks of the structure.Key words: post pouring belt; design; c

3、onstructionThe new release of code for design of concrete structures (GB 50010-, hereinafter referred to as the concrete specification), the reinforced concrete structure of the largest joint spacing requirements than the strict norms, norms used by the word may should be changed to . This requires

4、in the structural design, the designer must be taken seriously due to long to structure the negative influence, when the distance increases or structural joints is no expansion joint, must take practical measures to prevent the cracks of the structure. In increasing the spacing of the largest joint

5、measures, take prevention measures in construction stage is an effective method for the general concrete shrinkage reducing the adverse effects of our common approach is to set the construction of the pouring belt. In addition, when the building there is a big difference, but the structure design ac

6、cording to the specific circumstances can not set up permanent deformation joints, such as high-level and multi-storey main building (or lower) between the podium, construction is often used after pouring to resolve the differences in the construction phase of the settlement. These two kinds of cons

7、truction after pouring belt, the former can be called shrinkage after pouring belt, the latter can be called post settlement belt. In this paper, after the construction of the design and construction of pouring belt, combined with engineering practice, talk about the authors view.First, the design o

8、f the back pouring beltWhen the plane size of the building structure exceeds the maximum spacing of the expansion joint specified in the concrete specification (concrete specification 9.1.1), the method of post construction pouring belt shall be taken into consideration to appropriately increase the

9、 spacing of the expansion joint. But the general structure due to temperature changes greatly, so the largest joint spacing should not be more than the concrete specification limits too much at the same time, we should pay attention to strengthen the roof insulation, the external walls of the use of

10、 reliable and efficient heat preservation, and increasing the longitudinal reinforcement ratio of vertical wall, gable roof and other important parts of the. When the local structure is equipped with shock proof joints due to seismic design, the width of the expansion joint shall meet the requiremen

11、ts of the shock resistant seam width. The structure of super long basement is frequent, in addition to the basement roof and in the basement of the outdoor above ground wall affected by temperature change is relatively large, the basement and foundation of internal structure in the use stage affecte

12、d by the change of temperature inside and outside the room, the main problems to solve is the concrete shrinkage stress influence on structure. Except in the construction stage of post pouring belt, should strengthen the reinforcement of the basement roof and exterior wall of basement, recommended m

13、inimum longitudinal reinforcement ratio of not less than 0.5% bar as far as possible to choose a smaller diameter, generally 10 to 16 can be, try to choose the close spacing, should not be greater than 150mm, fine and dense the distribution of reinforcement is favorable for structural crack.It must

14、be pointed out that.,The back pouring band can only solve the autogenous shrinkage of concrete during construction, and it can not solve the stress concentration caused by the change of temperature, and can not replace the expansion joint. It is wrong for some structural designers to equate the back

15、 pouring strip with the expansion joint, since the effect is not the same.When the basement structure is too long and the back pouring belt is not enough to solve the concrete shrinkage and temperature variation, the shrinkage compensating concrete can be taken into consideration, and the expansion

16、reinforcing belt is arranged in an appropriate place. The method can not only increase the maximum spacing of the expansion joint, but also can replace the part of the construction after casting belt with the expansion strengthening belt, thus realizing the continuous pouring of the concrete, namely the seamless construction. It should be noted that the use of expansion reinforcing strip to replace part of the construction of the pouring belt, expa

展开阅读全文
相关资源
相关搜索

当前位置:首页 > 办公文档 > 解决方案

电脑版 |金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号