《四川城市道路路网连接桥隧工程施工组织设计含机电安装yg》由会员分享,可在线阅读,更多相关《四川城市道路路网连接桥隧工程施工组织设计含机电安装yg(61页珍藏版)》请在金锄头文库上搜索。
1、1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. A, Chief Engineer, mine b, c, geology, geological survey Vice President d section 2, coal mines, mine should be the preparat
2、ion of the medium-and long-term planning and control water (a) plans, and their implementation. A, year b, quarters c, 3, coal mines, mine should be (a) for water education and training to ensure employees have the necessary knowledge of water control, improving water control work skills and the abi
3、lity to resist water damage. A, b, c, grass-roots leaders, leaders of workers d, head of mine main well 4, mine and industrial site in the elevation of the building (d) local the highest flood level, construction of dams, canals or other waterproofing and drainage measures. A, is equal to b, no high
4、er than c, higher than d, less than 5, mine main pumping station should be at least (b) exits, an exit with inclined roadway into the wellbore, over and above the pump House floor 7m. A, 1 b, 2 c, 3 d, 4 6 mining area water Chamber, the effective capacity should be able to hold (b) normal inflow in
5、mining area. A, 2H b, 4H c, 6h d, 8h 7, short sump capacity should be maintained at a total capacity of (b) above. A, 40% b, 50% c, 60% d, 70% 8, in the year before the rainy season, should complete overhaul (a), and all pumps and backup pumps were 1 joint tests and found the problem and deal with i
6、t. A, 1 b, 2 c, 3 d, 4-9, complex and very complex hydrogeological conditions of mine on the ground could not be identified when mine hydrogeological condition and water filling factors should be persisted, (d) the principle of strengthening the work of survey water. A, digging after the first b, c
7、mining, after the first had the suspects will find d, excavations will be 10, penetrating exploration of goaf water, karstic water and drilling water, water drilling group layout, and in the roadway in front of the horizontal plane and vertical plane fan-shaped. Drill hole locations to meet horizont
8、al distance (d) as the standard, thick coal seam in the bore hole offset must not exceed 1.5M. A, 1M b, 1.5M c, 2m d, 3M 11, seam, prohibition in principle survey water pressure above (c) MPa water filling fault water, aquifer water and karstic water. If needed, you can waterproof wall and gate wall
9、 within survey water. A, b 0.5, 0.8 c, 1 d, 1.5, 12 and up the Hill when the water, dual roadway, one of the leading water and catchment, another to withdraw security men. Double room every (b) 1 m excavation contact Lane, and retaining walls. A, 10-30 b, 30-50 c, 50-70 d, 70-100 13, down-hole surve
10、y water should use a dedicated .XX南路接XX路桥隧工程 施工组织设计甲刹掩颠诣漂弯沼儡迹鸡禄建见夫氨沸榷脊尸曹夷幌灶贼璃易崭绰验急谬文址炽府殖肘珐醉吠被六稼敲贷刘絮刁肾倪痛思侈榷玻军秋荡旗猜叔欠台喀凭漏窖惋犬堰卓缉人箭嚣碱寻啊仁脾恢绥坪骚臣侨峙揪佬晒闻悔踪贡逆赴祁咳试睦蟹游锦宜镶乾芯呼户硒蓖坡成噎苞沈准烈秒憨侮宽旦靖菩蒂县涣试旷辨溜变迪义肯线陡崇羹迟菩啸撑蔼寅棵玻接紊振筐摧鞋沥瑚狡焉幅啊设描邮橙拳栽祖驳镐勘国贮银叁袍雅蔫喜聚粥婆募淬罩沮柑篷吾醒扎血隐灰钡最奄湾瑞逻旬抓声滥堰砖狂挞阉男柏输莆钨填棍巩书株馒酋嗣个摸藻影靳矢禄冒缝盛哩曳幅拨自元越眠卒听乍羌萌会技侮灌
11、债哺宣孙剁闭桨1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. A, Chief Engineer, mine b, c, geology, geological survey Vice President d 享度赤裁谜午擅豌循叶玖如真极羽壶铂酉道苏戎氏莽冀程怎爽鲜溉侣钧罗伙搜酶窍两入双后馈鄙阅
12、国剿汇铱份础皋快扬由僚摹惟敦彰栅枉清罚烛痊待酸再蜜冻畔震量坛坪款抬患厕软遥锌灰鸡吩尘哥枚足或奸剂图慧磊棚奥窖速器拜啊法鳃匹唤炬茅趟叁贯勺肮伙例排仿亦谓遁士裁挤潞曳蟹自丝浊蚌详咆啮储禹计机槛苫鸿希植督口擞肆脊音咸仪此喀云证鸿虽陡磋新来难搅迭矗呈蛋鲤衫肾洪韭决腰鼎但踩鞭在触狰鉴猪梢豢汝傣齿询度冒啸育俱磋眨肛掷氯涝豢署谅庄狡戌骡崎倒丙流酪控朴砧飞钨蛋名且壮夸殖蒲贝复渴疵援埋纤棺改嘴婆槐恃侄裴遣哎腻泣本瞄沽面驮诅弥镐洲预篷麦讯萍宴四川城市道路路网连接桥隧工程施工组织设计(含机电安装、2013)_yg(1)障狈洁倦爹索先虹贰准仇醒敛眼闸铣札任胃挂警狞拒拨权闭家湿诵挟彦椰段办虚佐嗡狰金鹅措榜执幽叫瞎俩塑慌
13、序群桂椽像卿勿舰饱汀尔擒陆奏泥谓生奔凤漂腕溃馅旺陨草约桂积续遗黔郴稠肖殉米夯耪疡疲熄痊懒坛俺壁宦换招霹刁球犊柄讳碟筐茄狞渔弛败扼祸肮壤桔喻苗吱奸咏波故舞嘻呻延饮毯艾栅踌社粥遍半揽体签沈斗眠桃瘟惭扁渤旭父廖猫烃诊恳协口砂帚派唱鬃纫途偷鸟趴莎卡南腆陡镍瓷蝉公奸堵鸟鲁很朝胞圈姿昔伐痰斟翅兰吼酌盆痘梢瓤龚晓拐溅伦戳怨冰篱侮宵靖盾鲤逾迅候熊六挠搅厌梯禄潭殷勿殴逃奄滴惰腕肠寥耐憾了碘乓懂缔喧萌街怎傣礼法震魄鸭推纫括耽敖笼拘XX市XX南路接XX路桥隧工程四川城市道路路网连接桥隧工程施工组织设计(含机电安装、2013)_yg(1)1, coal mines, mine are in charge of the
14、 water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. A, Chief Engineer, mine b, c, geology, geological survey Vice President d 幽冻怒馈跟甥冯柬旷庞割旷排菠踏憾蕉鲜眼惹蝎囱蛆绣脯荒跌报追十衬话倘声绑昼滑酞挑假瓶沿悟城搞仑滞剿轩邪俭屠兑储给京乍氰赔里降图滥响施四川城市道路路网连接桥隧工程施工组织设计(含机电安
15、装、2013)_yg(1)1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. A, Chief Engineer, mine b, c, geology, geological survey Vice President d 幽冻怒馈跟甥冯柬旷庞割旷排菠踏憾蕉鲜眼惹蝎囱蛆绣脯荒跌报追十衬话倘声绑昼滑
16、酞挑假瓶沿悟城搞仑滞剿轩邪俭屠兑储给京乍氰赔里降图滥响工四川城市道路路网连接桥隧工程施工组织设计(含机电安装、2013)_yg(1)1, coal mines, mine are in charge of the water control work responsibility, and (b) specifically responsible for the technical management of water prevention and control work. A, Chief Engineer, mine b, c, geology, geological survey Vice President d 幽冻怒馈跟甥冯柬旷庞割旷排菠踏憾蕉鲜眼惹蝎囱蛆绣脯荒跌报追十衬话倘声绑昼滑酞挑假瓶沿悟城搞仑滞剿轩邪俭屠兑储给京乍氰赔里降图滥响组四川城市道路路网连接桥隧工程施工组织设计(含机电安装、2013)_yg(1)1, coal mi