1、高温受压锅炉外部检验工作锅炉在运行过程中,受压元件在高温高压水汽介质作用下,在外部高温火焰辐射或烟气冲刷下,可能发生腐蚀、变形、磨损、结垢、过烧、泄漏等缺陷,还会出现堵灰、结渣等现象,更严重的发生爆管甚至爆炸事故,如果不及时发现并加以消除,最终将会导致设备破坏。锅炉检验工作就是将锅炉的危险降低到最低限度的一项重要的工作。Boiler in operation process, the pressure parts under high temperature and high pressure steam medium role, under the outside high temperat

2、ure flame radiation or flue gas erosion, corrosion, deformation, wear may occur, scaling, burnt, defects such as leakage, there will be blocking the phenomenon such as ash, slagging, the more serious the happening of the tube explosion accident, even if not discovered in time and try to eliminate, w

3、ill eventually lead to equipment damage. Boiler inspection is to lower risk of an important work to a minimum. 二、锅炉检验的内容The content of the two, boiler inspection 1.外部检验可以在锅炉运行过程中进行。其检验内容包括:(1)人孔、手孔、检查孔是否漏水、漏汽;(2)汽、水阀门和管道的状况;辅助设备运行情况;炉墙、钢架及炉膛燃烧情况;(3)安全附件是否齐全、灵敏;(4)锅炉的操作规程、岗位责任制、交接班等规章制度的执行情况;(5)水处理设备

4、运行情况。1. External inspection can be conducted in the process of boiler operation. The inspection items include: (1) manhole, hand hole, check hole leakage, leakage; (2) the steam, the condition of water valve and pipeline; Auxiliary equipment running status; Furnace wall, steel frame and combustion c

5、hamber of a stove or furnace; (3) whether safety accessories are complete, sensitive; (4) boiler operation procedures, post responsibility system, rules and regulations implementation such as succession; (5) water treatment equipment operation. 2.内外部检验,又叫定期停炉检验,它需要在锅炉停炉后进行。内外部检验的重点如下:(1)上次检验有缺陷的部位;(

6、2)锅炉受压元件的内、外表面,特别是开孔、焊缝、扳边等处有无裂纹、裂口和腐蚀;(3)管壁无有磨损和腐蚀;(4)锅炉的拉撑以及与被拉元件的结合处有无裂纹、断裂和腐蚀;(5)胀口是否严密, 酿酒设备管端的受胀部分有无环形裂纹,铆缝是否严密,有无苛性脆化;(6)受压元件有无凹陷、弯曲、鼓包和过热;(7)锅筒和砖衬接触处有无腐蚀,受压元件或锅炉构架有无因砖墙或隔火墙损坏而发生过热;(8)受压元件水侧有无水垢、水渣,进水管和排污管与锅筒的接口处有无腐蚀、裂纹,排污阀和排污管连接部分是否牢靠;(9)安全附件是否灵敏、可靠,水位表、水表柱、安全阀、压力表等与锅炉本体连接的通道有无堵塞;(10)自动控制、讯号

7、系统及议表是否灵敏可靠。2. Internal and external inspection, also called the furnace inspection regularly, it needs to stop at boiler furnace. The focus of the internal and external inspection as follows: (1) the last inspection defective parts; (2) boiler pressure parts of interior and exterior, especially the

8、 hole, the place such as weld, pull side crack, crack and corrosion; (3) the vessel is no more wear and corrosion; (4) boiler braced and the dragged element attaches crack, fracture and corrosion; (5) the expansion mouth tight, the bulge part of the tube end presence of circumferential crack, rivet

9、joint is tight, presence of caustic embrittlement; (6) pressure parts sag, to bend, bulge and overheating; (7) shell and brick lining contact with or without corrosion, the pressure parts or boiler frame without bricks or firewall damage and prevent excessive; (8) compression element water side have

10、 scale, slag, water inlet pipe and drainage pipe and drum interface with or without corrosion, crack, drain valve and drain connection part is strong; (9) security attachment is sensitive, reliable, water table, water meter column, such as safety valve, pressure gauge connected to the boiler body ch

11、annels have blocked; (10) automatic control, signal system and the discussion table is sensitive and reliable. 3.水压试验应按蒸汽锅炉安全技术监察规程的有关规定进行。3. The water pressure test should be according to the steam boiler safety technology supervision regulation of relevant provisions. 三、锅炉检验前的准备工作The preparing wor

12、k before three, boiler inspection 1.锅炉内部检验:(1)准备好有关的技术资料,包括锅炉制造和安装的技术资料、锅炉使用登记资料、锅炉运行记录、水质化验记录、修理和改造记录、事故记录及历次检验报告;(2)提前停炉,放净锅炉内的水,打开锅炉上的人孔、头孔、检查孔和灰门等一切门孔装置,使锅炉内部得到充分冷却,通风换气;(3) 泰安锅炉采取可靠的措施隔断受检锅炉与热力系统相连的蒸汽、给水、排污等管道并切断电源,对于燃油、燃气的锅炉还须可靠的隔断油、气来源并进行通风置换; (4)清理锅炉内的垢渣、炉渣、烟灰等污物;(5)拆除妨碍检查的汽水挡板、分离装置、给水、排污装置等

13、锅筒内件,并准备好用于照明的安全电源;(6)对于需要登高检验的(离地面3m以上)部分,应搭手脚架。1. Boiler internal inspection: (1) prepare the relevant technical data, including boiler manufacturing and installation of technical data, use the registration data, record, water quality testing of the boiler operation, repair and modification record

14、s, accident records and all previous test report; Net (2) boiler stop ahead of time, put the water in the boiler, to open the boiler on the manhole and head hole, inspection hole, and gray door all door opening device, such as the boiler internal fully cooling, ventilation; (3) reliable measures par

15、tition client connected to the thermal system of steam boiler, water supply, drainage pipe and cut off power supply, such as the fuel, gas-fired boiler must also the partition of reliable source of oil, gas and ventilation replacement; (4) clean up the scale within the boiler slag, slag, dirt such a

16、s soot; (5) demolition of interfere with the inspection of soda baffle, separation device, water supply, sewage discharge device, such as drum internals, and ready for safe power supply for lighting; (6) for high (more than 3 m above the floor) part of the test, should take a plane. 2.锅炉外部检验:(1)锅炉外部的清理工作;(2)准备好锅炉的技术档案资料;(3)准备好司炉人员、水质化验人员、管理人员的资格证件;(4)检验时,锅炉使用单位的管理人员和司炉班长应到场配合,协助检验工作,并提供检验员需要的其它资料。2. The external exter