浅埋暗挖隧道专项施工方案.doc

上传人:枫** 文档编号:551270214 上传时间:2024-01-24 格式:DOC 页数:81 大小:8.44MB
返回 下载 相关 举报
浅埋暗挖隧道专项施工方案.doc_第1页
第1页 / 共81页
浅埋暗挖隧道专项施工方案.doc_第2页
第2页 / 共81页
浅埋暗挖隧道专项施工方案.doc_第3页
第3页 / 共81页
浅埋暗挖隧道专项施工方案.doc_第4页
第4页 / 共81页
浅埋暗挖隧道专项施工方案.doc_第5页
第5页 / 共81页
点击查看更多>>
资源描述

《浅埋暗挖隧道专项施工方案.doc》由会员分享,可在线阅读,更多相关《浅埋暗挖隧道专项施工方案.doc(81页珍藏版)》请在金锄头文库上搜索。

1、Gay is now a provincial key construction project of aluminum Ltd-province with an annual output of 50,000 tons of technical innovation project of environmental protection and energy saving of electrolytic aluminum project manager. In this technological transformation projects, he has overall respons

2、ibility for the day-to-day affairs of the project. In order to ensure that southern companys control the scale of investment, strengthen field management, pay special attention to project progress, and ensure a successful operation, the overall goal. He and Engineering Department under the leadershi

3、p of all the staff in the companys technical command, on the difficulties and to overcome technical difficulties in the process, work hard, have made outstanding achievements, mainly reflected in the following aspects: first, careful organization and management achieved remarkable results. Technical

4、 innovation project of the year, started and completed a series of bids and completed to date, from production engineering to put into production after nearly a year, has achieved very significant results. A project first 56 slots from dismantling the old slot just 168 days, civil engineering, insta

5、llation, commissioning, guarantee engineering quality under the premise, on the production side transformation under difficult conditions, created the national industrys fastest speeds. II 32 large prebaked electrolytic cell on November 7 has been installed, marks has an annual production capacity o

6、f 50,000 tons of electrolytic aluminum production capacity of aluminum. Entire project almost 8 months earlier than planned, achieved the goal of production transformation benefits that year, created favorable conditions for aluminum through South. Second, effectively control the investment. Project

7、 is subject to a scientific approach to bidding, bidding to make savings of 20 million Yuan, in the implementation process of the project, every domestic prices of steel, cement and other building materials, the old buildings on the base encountered great difficulties in dealing with significant inc

8、rease in the volume of civil engineering, but through rationalization and optimization, project control in fixed investment of 350 million Yuan. Third, environmental energy-saving effect of the project. Project investment of nearly 30 million Yuan, using large prebake technology and aluminum oxide d

9、ense phase and hyper dense phase conveying technology, fluoride and other harmful gases purification efficiency of up to 98%. Compared with Soderberg cell before the modification, power consumption can be reduced by 1500 tons of electrolytic aluminum, and project environmental protection and energy

10、saving effect is obvious. Four are in a relatively short period of time to the normal production. After four months of efforts, a project has put into operation all the 54 240KA large cell into regular production, stable current channel conditions and all the economic indicators are good, current ef

11、ficiency in October had reached 93%, is close to and reach the domestic advanced level. In the case of production half of the cell, this effect can be achieved and better level in the industry. 50,000 tons of electrolytic modification process, from preliminary study to equipment selection, cost cont

12、rol, project progress, quality control and coordination among the various sub-projects and various professional, technical command under the correct leadership, both from an overall perspective, emphasis on integrity, and earnestly implement the relevant laws and regulations, strictly act according

13、to the contract. He tried to learn relevant knowledge, good style of business, operational and organizational coordination ability, project efficiency, quality and safety assurance system in place, with all units involved with the coordination and good . 暗挖隧道施工方案 环岛路(鳌山路-高殿二号)工程标环岛路(鳌山路高殿二号路段)工程标浅埋暗

14、挖隧道专项施工方案编制:审核:批准:中铁十八局集团有限公司厦门环岛路(鳌山路-高殿二号路)道路工程标段项目经理部2014年12月3日目录第一章编制依据及原则- 3 1.编制依据- 3 -2.编制原则- 3 3。主要技术规范及标准 3 第二章工程概况及施工特点 5 -1.工程概况- 5 1。1 工程简介- 5 1.2 地质概况 7 -1。3 水文地质- 10 -1。4 气候条件 11 1。5 地震烈度- 11 -1。6 工程环境 11 -2。施工特点- 11 第三章总体施工部署及施工方案 12 1.总体管理目标 12 -2。总体施工概述 12 3。施工组织机构及资源配置- 12 -3.1 施工组

15、织机构- 12 3。2 机械设备的投入- 13 4.暗挖隧道结构设计 14 5。暗挖隧道施工方案- 15 -5.1施工步序- 15 5.2 隧道进洞 17 5.3 超前支护 21 5。4 初期支护- 29 5.4 洞身衬砌- 32 -5.5 隧道防排水- 33 5。6 隧道附属结构- 34 5。7 隧道风、水、电设计- 35 6.监控量测- 37 -6。1.监测项目- 37 -6。2.暗挖隧道监测点布设 38 第四章施工安全技术保证措施- 45 -1.安全保证措施- 45 1。1安全管理目标 45 -1。2安全管理方针 45 -1.3安全管理组织机构和网络- 45 -1.4安全管理组织措施- 47 1.5安全管理预防措施- 47 2.隧道施工主要危险源及安全技术措施- 47 -2。1出渣- 47 -2。2支护- 48 -2.3衬砌 48 2。4 隧道洞内排水 49 2。5 隧道施工工法转换 50 -2。6 施工安全保证措施 50 -3.环境保护措施 52 3.1噪声控制措施- 52 -3。2城市生态控制措施- 52 -3.3水污染控制措施- 52 -3。4大气污染控制措施 53 3。5固体废弃物控制措施 53 3.6工

展开阅读全文
相关资源
正为您匹配相似的精品文档
相关搜索

最新文档


当前位置:首页 > 研究生/硕士 > 综合/其它

电脑版 |金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号