资源描述

《施工进度保证措施范文.doc》由会员分享,可在线阅读,更多相关《施工进度保证措施范文.doc(8页珍藏版)》请在金锄头文库上搜索。

1、xxxx省天然气管网一期工程线路光缆施工第5标段(xxx段)施工组织设计施工进度保证措施xxxx省天然气管网xx期工程线路光缆施工 第x标段(xx段)编制:审核:审批: 施工单位:xxxx建设有限公司 日 期: 年 月 日作为一名测量人员,xx认真履行岗位职责,紧密配合施工,制定切实可行的的测量放线方案。保罗回忆自己年少时癿经历,丌断怃耂生命、医疗、道德不哲学乊间癿兰系,丌仅为从医考提供了新规觇,使他们对自己癿职业呾使命有更为深入癿怃耂,耄丏为读考引路,觑人们更勇敢、沉着地看待生命、死亜不未来。situation, causing the livelihood of 100 tailings

2、project management project and South Mining Technology in two engineering work lag. Corrective measures: (LED Leadership: Luo Mingjun, rectification time: before September 25th, insist for a long time) 1, strictly abide by the partys political discipline. Strictly abide by the constitution, the prin

3、ciple of Party organization and party political life standards, do not spread against the partys theory and policy advice, not contrary to published The central and provincial Party committee decided to talk, not to divulge the secrets of the party and the state, do not make no illegal organization

4、and participate in various activities, political, spread rumors and false information, not to publish lossy unity of speech, do not damage the unity of things, and never allow individuals above the organization. 2, adhere to the scientific and democratic decision-making the decision to make decision

5、s. Correctly handle to ensure that government decrees and based on the actual creative work, giving full play to subjective initiative, put an end to implement the conference meeting, to document the implementation of documents and so on. To improve the scientific and democratic decision-making mech

6、anism, improve and implement the decision to solicit opinions, experts, public hearings and other health system. All major decisions before the risk assessment mechanism and legitimacy review mechanism. Adhere to the interests of the masses and the intention reflected in the policy making process an

7、d carry out the work, not acting on their behalf, across the board and coercion. (two) the existence of negative communication or unwilling to communication problems due to maintenance party team unity. The team members of the division of responsibilities, temperament, interestsDifferences in demand

8、, often leads to different views, different opinions. Individual members of organization and coordination ability, team spirit is not good, work style is not real, simple working methods, lack of knowledge of the wisdom of the people, forgiveness and art for the people, can not deal with different o

9、pinions, there are self sweep the snow in front of the door, all kinds of responsibility fields. Some members of the team division of work coordination, lack of coordination, as extreme liberalization, did not form a work force. In addition, individual cadres lack of leadership training, love comman

10、d communication, negative communication, talk in the work did not take the initiative to talk not correct The science team differences, resolve conflicts. Corrective measures: (LED Leadership: Luo Mingjun, rectification time: before September 25th, insist for a long time) 1, to further strengthen th

11、e education and guidance on the implementation of the central eight provisions, the provincial nine provisions of the county committee of the ten provisions extensive publicity, eliminate the ideological1目录一、编制依据1二、编制原则1三、工程概况2四、进度方针与目标2五、工程进度保证措施3六、工程进度网络图5七、冬、雨季施工进度保证措施6一、编制依据根据xxxx省天然气管网一期工程线路光缆施

12、工第5标段(xxxx段)工程 招标文件要求和我公司对施工现场的踏勘调查,及我公司可以投入的施工资源,特编制本施工质量保证措施。合理划分施工作业段,减少搬迁次数;合理安排施工顺序,注重各工序之间的衔接;充分考虑地形、地貌、季节、水文的影响,难易结合均衡控制施工进度;提高机械设备的利用率,减少机械、设备闲置时间。各施工组人员、设备、机具的配备,综合考虑,能分、能合、合理划分、组合,实现难点突出.本着先易后难,综合考虑季节对不同地段、地貌和水文的影响,将施工工序合理安排在受季节影响最小的时间内。二、编制原则2。1、安全第一的原则在施工组织设计的编制中始终按照技术可靠、措施得力、确保安全的原则确定施工

13、方案,在确保万无一失的前提下组织施工.2。2、优质高效的原则加强领导,强化管理,优质高效。根据我们在施工组织设计中明确的质量目标,贯彻执行ISO9001质量体系标准,积极推广、使用“四新”技术,确保质量目标的实现。施工中强化标准化管理,控制成本,控制工程造价。2。3、方案优化的原则科学组织,合理安排,优化方案是工程施工管理的行动指南,在施工组织设计编制中,对本工程施工进行多种施工方案的综合比选,针对不同地质条件和施工条件,择优选用最佳方案。2.4、科学配置的原则根据本工程的工程量及各项管理目标的要求,在施工组织上实行科学配置,选派有施工经验的管理人员和专业化施工队伍上场,投入高效、先进适用的施

14、工设备,确保流动资金的周转使用,建设资金做到专款专用。选用优质材料,确保人、财、物、设备的科学合理配置.2。5、合理布局的原则根据本工程的任务量和管理目标的要求以及地形地貌的特征,在临时工程施工准备上,特别是对水、道路等临时设施的设置,本着避免干扰、就近布置、方便使用、优化设置的原则,合理布置,满足施工需要.2。6本着“机构健全,职责明确,过程控制有力”的原则,建立起完善、健全、有效的各分项工程的质量保证体系,对工程的全过程实施全面的动态质量管理,以此来确保预定质量、进度目标的实现。2.7严格遵守招标文件所规定的施工工期,通过合理安排和组织,合理划分施工作业段,减少搬迁次数;合理安排施工顺序,

15、注重各工序之间的衔接;充分考虑地形、地貌、季节、水文的影响,难易结合均衡控制施工进度;提高机械设备的利用率,减少机械、设备闲置时间。各施工组人员、设备、机具的配备,综合考虑,能分、能合、合理划分、组合,实现难点突出。本着先易后难,综合考虑季节对不同地段、地貌和水文的影响,将施工工序合理安排在受季节影响最小的时间内。三、工程概况工程名称:本工程为xxxx省天然气管网xx期工程线路光缆施工第xxx标段(xxxx段)工程 。建设规模:xxxx省天然气管网一期工程xxxxx-xxx全长约xxx公里,起点为xxx,终点为xxx站,自然条件及工作环境:途经区域基本为丘陵、丘冈、山前宽缓谷地、平原地貌。沿线

16、穿跨越有:xx处定向钻,铁路高速十几处,施工及技术要求:工程采用同沟布放硅芯管吹光缆的方法,采用16芯光缆选用ITU-T G。652型标准单模光纤,光缆选用型号为 GYTA16B1,硅芯管为40/33高密度聚乙烯(HDPE)硅芯管,其标准盘长为2KM。,硅芯管的位置在输气管道前进方向的右上侧,顶部与输气管道的管顶持平,距离输气管道侧壁0。300m,与管沟侧边净距不小于100mm,埋深符合设计要求。四、进度方针与目标4.1质量方针:本工程规模大,工期紧,为保证总目标的实现,要以质量、安全为第一,以进度为核心。首先,以总进度网络为依据,按进展阶段的不同,分解为多个层次,再按各层次分解为不同的进度分目标。4.2进度目标:在质量全面符合设计、制造和施工方面的国家、行业内的有关标准、

展开阅读全文