1、Solar street light installation instruetionsSolar street light installation instruetionsFirst,knowleage solar street lightsolar street light components and working principle Solar street light was composed mainly by solar module, intelligent controller, maintenance-free batteries, light source, such

2、 as light poles and structural components. The working principle of solar street light are solar cell components of solar radiation during the day will be converted into elec trical energy, mai nt enance-free batt eries to charge the batt ery to the evening by the ligh t source to provide elec trici

3、 ty load, the ligh t source automati cally when in the dark. Int ellige nt cont roller for sto rage battery over-charge and over-discharge, had put the protection, and the open time and switch time of the light source for control.Two, foundation pouring1) .To determine the location of floor lamp; re

4、connaissance geological conditions, if one meter of surface are soft soil, it should deepen the depth of excavation; At the same time, the location of the following excavation to confirm there are no other facilities (such as cables, pipes, etc.).There is no long time shading objects at the top of s

5、treet lamps, or want to replace the location appropriately.2) . In the legislature reserved the location of the lamp (excavation) in line with the standard one cubic meter pit ; for pouring position to the embedded parts. Embeddedparts placed in the pitto the middle, PVC pipe threading on the end pi

6、eces are embedded between the other end on the storage battery (as shown). Embedded parts to keep the foundation and the original ground surface at the same level (or screw the top and at the same level as theoriginal ground surface, according to the venuemay be necessary), there is the side paralle

7、l with the road; so the poles were erected in order to ensure that after the correct without deviation. Then fixed in C20 concrete pouring, pouring out the process of vibration or shock stick to ensure that the overall compactness, solidity.3) . Construction completed and timely clean-up position on

8、 the board of residual mud residue and impurities in waste oil cleaning bolt on.4) .Concrete solidification process, it is necessary to conserve water from time to time; to be completely concrete solidification (typically more than 72 hours), in order to install the chandelier.Third, the installatio

9、n of solar panel1) .battery positive and negative output components connected to the solar regulator at the former have to take measures to avoid short-access;2) .solarcellcomponentswithsupporttoconnecttoasolidandreliable;3) .components of the output line should avoid exposure, and firmly tie bar;4)

10、 . the battery components to be heading towards the south in order to compass point to prevail.Fourth, the battery is installed1) .When the battery box under the control of light using light have to take to prevent the damaged control box;.2) . Between the battery cable bolt pressure must be at the

11、terminal on the battery and the use of copper pad to enhance the conductivity.3) . Output line connected to the battery under any circumstances after the ban on short then, to avoid damage to the battery.4) .The output line of batteries and the controller poles must be linked through the PVC pipe th

12、reading.5) . The above is completed, check the controller side of the wiring to prevent short circuit. Well after the normal clearance of the door control box.Fifth, lamp installation1) . For each part of the fixed components: solar panels at solar panels fixed on bracket, lamp holder fixed to the p

13、ick arm, and then pick stent arm and fixed to the main bar, and cable into control box to wear (battery box).2) Lifting the poles before to check whether the strong parts of fasteners, lamp installation is correct, whether it is normal for light work. And in the simple normal debugging system; relea

14、se controller cable on solar panels, light work; cable connected to solar panels, lights out; controllers simultaneously on careful observation of changes in the indicator; all belong to the normal before lifting installation.3) . Lifting the main poles, the attention to safety precautions; screws f

15、astening the absolute good,components angle towards the sun such as the wrong point of view, end up required to adjust its direction towards south.4) The battery into the battery boxes will be in accordance with the technical requirements of connecting lines connected to the controller; to access th

16、e battery, making the load, and then take the solar panels; cable operator must pay attention to when the connection with the controller on each of the terminals marked Then should not mistake, positive and negative poles of the collision should not, should not take anti-; otherwise, the controller will be damaged.5) Normal debugging system; release controller cable on solar panels, lights; cable connected to solar panels, lights out; control