建筑材料供应合同

上传人:公**** 文档编号:543648534 上传时间:2023-02-11 格式:DOCX 页数:26 大小:218.08KB
返回 下载 相关 举报
建筑材料供应合同_第1页
第1页 / 共26页
建筑材料供应合同_第2页
第2页 / 共26页
建筑材料供应合同_第3页
第3页 / 共26页
建筑材料供应合同_第4页
第4页 / 共26页
建筑材料供应合同_第5页
第5页 / 共26页
点击查看更多>>
资源描述

《建筑材料供应合同》由会员分享,可在线阅读,更多相关《建筑材料供应合同(26页珍藏版)》请在金锄头文库上搜索。

1、建筑材料供应合同仲英文)CONTRACT OF PURCHASE BUILDING MATERIAL买方Buyer (以下简称“买方” herei nafter, the“ Buyer ”)地址Address:电话Tel :传真Fax :卖方Seller:地址Address:电话Tel :传真Fax :本合同经买、卖双方友好协商后在年 月 日签订。根据本合同签订的条款,买方同意向卖方购买、卖方同意向买方提供下列轻钢结构系统建筑材料一套 (以下简称“钢结构”):This Con tract is made by and betwee n the Buyer and Seller on,1997

2、after frien dly n egotiati ons. The Buyer hereby agrees to purchase from the SeUpr, and the Seller hereby agrees to sell to the Buyer, the following set of metal building system (hereinafter, the“ Metal Building System ” ) onottndittormi sehd cforth in this Con tract:第一条 项目名称 Article 1. Name of Proj

3、ect1.1 本项目名称为:The name of this project is:1.2本项目位于(以下简称“工地现场”)。This project is located at(here in after,“ the Site ” ).第二条 卖方供货范围 Article 2. Scope of Supply from Seller2.1在提供钢结构时,卖方应负责:In suppl ying the Metal Build ing System, the Seller shall be resp on sible for:2.1.1设计并制造供应本项目地面以上的全部钢结构(详见附件一);及t

4、he desig n and manu facture of this project -gronncbsibucVere (seeAttachme nt 1 for details); and2.1.2所提供钢结构部件及材料的必要包装 运输运输的保险。the n ecessary pack ingP shipp ing shipp ing in sura nc of and for the parts and materials of the Metal Buildi ng System being supplied.第三条 合同价格 Article 3. Con tract Price3.

5、1本合同总价为人民币整(以下简称合同总价)。”).The price of this Con tract is Rmb (herei nafter, the“ Con tract Price3.2合同总价不包含有关之关税增值税。The Con tract Price excludes the related customs dutyS value added taxesO.第四条付款条件及方式 Article 4. Payment Terms4.1本合同签订后五个工作日内,买方应付予卖方合同总价之20 %作为定金,即人民币:元。Within 5 worki ng days of the sig

6、 ning of this Con tract, the Buyer shall pay to the Seller a deposit equal to 20% of the Con tract Price, i.e. Rmb.4.2买方收到卖方的钢结构设计图并确认后三个工作日内,应付予卖方合同总 价之20 %作为预付款,即人民币元。With in 3 work ing days of its receipt and approval of the desig n draw ings for the Metal Building System, the Buyer shall pay to

7、the Seller a prepayment amount equal to 20% of the Con tract Price, i.e. Rmb.4.3钢结构制造完成后,并经买方验收后五个工作日内,买方应付予卖方合同 总价之60%,即人民币元。Within 5 worki ng days after the manu facture of the Metal Buildi ng System has been completed and the Buyer has accepted the Metal Building System, the Buyer shall pay to th

8、e Seller 60% of the Con tract Price, i.e. Rmb.4.4买方支付卖方的所有款项均以银行汇票或电汇方式汇至卖方指定在中信实 业银行南京西路分理处虹桥分理处所开之帐号,号码086861-1022402056Q所有付款日期均以卖方收款之银行收款凭证日期为准。如买方逾期五天付 款!须从第六天起按日支付该笔逾期款项0.1%的滞纳金。若买方之逾期付款超过应付款日三十天后,卖方有权单方面取消整个合同,并没收买方已支付之定金、预付款和其他款项作为赔偿。若该笔款项不足弥补卖方之损失,则买方还需就不足部分支付赔偿金。All payme nts to be made by

9、the Buyer to the Seller here un der shall be made bybank draft or wire tran sfer to the Sellers designated account at the Hongqiaosub-office of West NaflURoad office of Citic In dustrial Ba nk ShanghaitsBranch, accou nt no. 086861-10224020560. The date of payme nt for all amounshall be the official

10、date of receipt by the sellers receivingban k. If the Buyerpayment is late for five days,it shall pay a penalty on the late sum from the sixthday at a rate of 0.1% peiday. If the Buyers payment is late for more than 30days, the Seller has a right to un laterally termi nate this Con tract and forfeit

11、 thedeposit, prepayme nt and any other sums as compe nsati on .If such sums are notsufficient to compensate the Seller osses, the sBuyer shall pay the Seller theamount of such deficie ncy.第五条设计、制造进度及期限Article5. Progress and Time Limit on Design and Manufacture5.1卖方收到定金后四周内,应向买方提供设计所需的反力图及地脚螺栓布置图。买方应

12、尽快将以上资料提交负责设计地基和基础的设计院。有关设计院的所有费用(包括图签费用)均由买方承担With in four weeks after it received the deposit, the Seller shall provide to theBuyer the reacti on draw ings and the draw ings for the placeme nt of the an chorbolts required for the desig n of the Metal Build ing System. The Buyer shall givethis info

13、rmation to the design institute responsible for the design of thefoun dati on as soon as possible. All costs related to the desig n in stitute (in cludingthe cost of sig ning the draw in gs) shall be borne by the Buyer.5.2收到预付款后周,卖方应完成钢结构制造并通知买方派员到卖方工厂进行交货发运前检验Withinweeks after it received the prepa

14、yment, the Seller shall complete themanufacture of the Metal Building System and notify the Buyer to send itsreprese ntative to the Sellers plant to inspect the goods before theirdelivery andshipme nt.5.3买方验收后已付卖方第4.3条货款后一周内,卖方应将产品运至工地现场With in one week after the Buyer has in spected and accepted th

15、e goods andpaid Seller the amount set forth in article 4.3 hereof, the Seller shall have thegoods shipped to the Site.5.4买方若要求变更钢结构规格或设计,应以书面方式通知卖方,卖方在可能的情况下尽量满足买方要求,但卖方可视增加之工时和材料调整本合同价格及期限,经买卖双方同意后才生效。所有钢结构规格或设计之变更,若因买方未能于两天内签置卖方所提供的有关确认文件,均视为买方取消变更要求,回复原本规格或设计。如因此而造成钢结构设计或制造之延误,则买方须承担一切责任。Should the Buyer request any changes to the specifications or design of theMetal Building System, it shall notify the seller in writing. The Seller shall try tosatisfy the Buyers request as

展开阅读全文
相关资源
相关搜索

当前位置:首页 > 学术论文 > 其它学术论文

电脑版 |金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号