1、Site Inspection for People Hospital in Xiaolan TownPrepared byHoward HeA00688012Submitted toNicholas Petryszak, Co-op CoordinatorMech 6090Course date: Ten monthsCompany Name: Xiaolan Fire Protection Engineering Co., Ltd.Company address: 57 Jitou Road, Xiaolan Town,Zhongshan City, Guangdong Province,
2、 China P.R.C.Date of Report: 27th August 2012SummaryI was employed at Xiaolan Fire Protection Engineering Co., Limited,(Xiaolan) located in Zhongshan City, Guangdong Province, China P.R.C. from October, 2009 to June, 2010 and June 1st 2012 to 27th August 2012 as a student mechanical engineer. Zhijia
3、n Zhang was my supervisor in the company and he was an expert in plumbing and HVAC. Xiaolan is the towns leading plumbing supplier and assembler. The company was founded at August 1994, and it undertook some big projects in local area in Zhongshan city.My primary task while employed was to read and
4、interpret blueprints, drawings and specifications; Locate and mark position of pipe connections, holes and fixtures; determine piping system requirements and pipe sizing. In the first two weeks, I studied the building code in order to understand the standard in China. After that, I modified the draw
5、ing by using AutoCAD software based on supervisor requirement. After a month later, I start inspection in worksite with supervisor. I needed to locate and mark any position of the pipe connections, holes, and fixture for any changes. After the inspection, I have to write a log or report to inform an
6、y modifications to my supervisor. Table of ContentsSite Inspection for People Hospital in Xiaolan TowniSummaryiiTable of ContentsiiiTable of FiguresivIntroductionvStudy the Chinese standard building codeixRead and interpret blueprints drawings and specifications;xiLocate and mark position of pipe co
7、nnections, holes and fixtures;xiiiDetermine piping system requirements and pipe sizing.xivWrite progress log and report and meeting memoxvPersonal ObservationxviAppendixxixFigure 1: Work SitexxFigure 2: Front Door of the HospitalxxiFigure 3: Assemble Field 1xxiiFigure 4 : Assemble Field 2xxiiiFigure
8、 5: Field InspectionxxivTable of FiguresFigure 1:Work SitexxFigure 2:Front Door of the HospitalxxiFigure 3: Assemble Field 1xxiiFigure 4 : Assemble Field 2xxiiiFigure 5: Field InspectionxxivIntroductionDuring this work term I was employed at the Fire Protection Engineering Co., Limited, (Xiaolan) lo
9、cated in Zhongshan City, Guangdong Province, China P.R.C. Xiaolan is the towns leading plumbing supplier and assembler. The company was founded at August 1994, and it undertook independently some big projects in local area in Zhongshan city. Additionally the company was undertaking 5 big projects re
10、cently during my work term. Therefore, I was so lucky to follow these projects with my supervisor. It is a great opportunities for me to gain useful skill and experience. I was assigned to follow two hospitals project. The plumbing system is more complicated in hospital than in hotel. Thus, the proj
11、ects were so challenge. Lucky, Zhijian Zhang was my supervisor in the company and he was an expert in plumbing and HVAC. He was a professional engineer, and he had been worked on this area more than 20 years. Therefore, I learned a lot of knowledge and gained useful skill under his training. He neve
12、r gets tired my questions and he teach me patiently. Being a responsible man is first thing he always emphasis. He always asks me to have positive attitude on what I was doing. During the work term, he showed his knowledge, skills and even life style to me; I was so impressed his attitude to job, to
13、 life, to everyone. He was not only my supervisor but also the life teacher.As a mechanical engineering student, my main task was to My primary task while employed was to read and interpret blueprints, drawings and specifications; Locate and mark position of pipe connections, holes and fixtures; det
14、ermine piping system requirements and pipe sizing. In the first two weeks, I studied the building code in order to understand the standard in China. After that, I modified the drawing by using AutoCAD software based on supervisor requirement. After a month later, I start inspection in worksite with
15、supervisor. I needed to locate and mark any position of the pipe connections, holes, and fixture for any changes. After the inspection, I have to write a log or report to inform any modifications to my supervisor. The EmployerXiaolan, a fire protection engineering company, was established in August
16、1994. The company is part of urban construction and development of subordinate enterprises of the Corporation, which specializes in fire protection and plumbing construction company, which currently holds the Guangdong Province Public Security Fire issued a Class A fire engineering construction qualification certificate issued by the Ministry of Construction