电气项目划分表工程编号工程名称性质控制点施工检验质量检验标准编号单位工程分部工程分项工程见W停H旁S班组专业公司施工单位监理单位建设单位1发电机电气与引出线安装√√√√DL/T5161.1-表4.0.31发电机电气与出线设备安装√√√√DL/T5161.1-表4.0.21发电机本体检查主要√√√√√√DL/T5161.7-表1.0.12发电机附件安装主要√√√√√DL/T5161.7-表1.0.23励磁设备检查安装√√√√DL/T5161.7-表2.1.2DL/T5161.3-表1.0.14互感器检查安装√√DL/T5161.3-表3.0.15箱、柜(盘)安装√√DL/T5161.8-表1.0.2DL/T5161.8-表4.0.2DL/T5161.8-表6.0.27交(直)流励磁母线安装主要√√√√√DL/T5161.4-表3.0.22发电机引出线安装√√√√DL/T5161.1-表4.0.22封闭母线安装主要√√√√√DL/T5161.4-表5.0.23电压互感器、避雷器安装√√√√DL/T5161.3-表3.0.1DL/T5161.2-表6.0.210发电机启动试运主要√√√√√DL/T5161.7-表3.0.72主变压器系统设备安装√√√√DL/T5161.1-表4.0.31主变压器安装√√√√DL/T5161.1-表4.0.21主变压器本体安装√√√√√DL/T5161.3-表1.0.3-12主变压器检查主要√√√√√√DL/T5161.3-表1.0.3-23主变压器附件安装√√√√√DL/T5161.3-表1.0.3-34主变压器注油及密封试验主要√√√√√DL/T5161.3-表1.0.3-45主变压器整体检查主要√√√√DL/T5161.3-表1.0.3-52主变压器系统附属设备安装√√√√DL/T5161.1-表4.0.21中性点隔离开关安装√√√√DL/T5161.2-表5.0.12避雷器安装√√√√DL/T5161.2-表6.0.23控制柜及端子箱安装√√DL/T5161.8-表4.0.24软母线安装√√√√DL/T5161.4-表7.0.210主变压器带电试运主要√√√√√DL/T5161.3-表4.0.95控制及直流系统设备安装√√√√DL/T5161.1-表4.0.31控制室设备安装√√√√DL/T5161.1-表4.0.21单控室控制及保护屏台安装√√DL/T5161.8-表1.0.2DL/T5161.8-表5.0.22单控室二次回路检查及接线√√DL/T5161.8-表7.0.22直流系统设备安装√√√√DL/T5161.1-表4.0.21直流屏及充电设备安装√√DL/T5161.8-表1.0.2DL/T5161.13-表2.0.22二次回路检查及接线√√DL/T5161.8-表7.0.23蓄电池安装√√√√DL/T5161.9-表1.0.2DL/T5161.9-表2.0.24充放电及容量测定主要√√√√√DL/T5161.9-表3.0.3DL/T5161.9-表3.0.46厂用高压变压器安装√√√√DL/T5161.1-表4.0.31厂用高压工作变压器安装√√√√DL/T5161.1-表4.0.21变压器本体安装√√DL/T5161.3-表1.0.3-12变压器检查主要√√√√√√DL/T5161.3-表1.0.3-23变压器附件安装√√√DL/T5161.3-表1.0.3-34变压器注油及密封试验主要√√√√√DL/T5161.3-表1.0.3-45控制及端子箱安装√√DL/T5161.8-表1.0.2DL/T5161.8-表4.0.26低压侧共箱封闭母线安装主要√√√√√DL/T5161.4-表1.0.2DL/T5161.4-表4.0.27变压器整体检查主要√√√√DL/T5161.3-表1.0.3-510.1厂用高压工作变压器带电试运主要√√√√√DL/T5161.3-表4.0.91.1厂用高压共用变压器安装√√√√DL/T5161.1-表4.0.21变压器本体安装√√DL/T5161.3-表1.0.3-12变压器检查主要√√√√√√DL/T5161.3-表1.0.3-23变压器附件安装√√√DL/T5161.3-表1.0.3-34变压器注油及密封试验主要√√√√√DL/T5161.3-表1.0.3-45控制及端子箱安装√√DL/T5161.8-表1.0.2DL/T5161.8-表4.0.26低压侧共箱封闭母线安装主要√√√√√DL/T5161.4-表1.0.2DL/T5161.4-表4.0.27变压器整体检查主要√√√√DL/T5161.3-表1.0.3-510.2厂用高压共用变压器带电试运主要√√√√√DL/T5161.3-表4.0.92厂用高压备用变压器安装√√√√DL/T5161.1-表4.0.21变压器本体安装√√DL/T5161.3-表1.0.3-12变压器检查主要√√√√√√DL/T5161.3-表1.0.3-23变压器附件安装√√√DL/T5161.3-表1.0.3-34变压器注油及密封试验主要√√√√√DL/T5161.3-表1.0.3-45控制及端子箱安装√√DL/T5161.8-表1.0.2DL/T5161.8-表4.0.26低压侧共箱封闭母线安装主要√√√√√DL/T5161.4-表1.0.2DL/T5161.4-表4.0.27软母线安装主要√√√√√DL/T5161.4-表7.0.28变压器整体检查主要√√√√DL/T5161.3-表1.0.3-510.2厂用高压备用变压器带电试运主要√√√√√DL/T5161.3-表4.0.97主厂房厂用电系统设备安装√√√√DL/T5161.1-表4.0.31厂用高压配电装置安装√√√√DL/T5161.1-表4.0.21盘柜基础安装√√DL/T5161.8-表1.0.22配电盘柜安装√√DL/T5161.8-表2.0.13母线安装主要√√√√√DL/T5161.4-表3.0.24断路器检查主要√√√√√DL/T5161.2-表3.0.25二次回路检查及接线√√DL/T5161.8-表7.0.22厂用低压配电装置安装√√√√DL/T5161.1-表4.0.21变压器安装主要√√√√√DL/T5161.3-表1.0.1DL/T5161.3-表1.0.22PC(动力中心)盘安装主要√√√√DL/T5161.8-表1.0.2DL/T5161.8-表3.0.2DL/T5161.12-表1.0.23母线安装主要√√√√√DL/T5161.4-表3.0.24二次回路检查及接线√√DL/T5161.8-表7.0.23汽机间电气设备安装√√√√DL/T5161.1-表4.0.21MCC(。