QSLNGEPCKZBHYJY197 附件PowerON项目管理信息系统操作指导手册(分包商模块项目级)C版

上传人:ni****g 文档编号:512792549 上传时间:2024-03-07 格式:DOC 页数:59 大小:4.04MB
返回 下载 相关 举报
QSLNGEPCKZBHYJY197 附件PowerON项目管理信息系统操作指导手册(分包商模块项目级)C版_第1页
第1页 / 共59页
QSLNGEPCKZBHYJY197 附件PowerON项目管理信息系统操作指导手册(分包商模块项目级)C版_第2页
第2页 / 共59页
QSLNGEPCKZBHYJY197 附件PowerON项目管理信息系统操作指导手册(分包商模块项目级)C版_第3页
第3页 / 共59页
QSLNGEPCKZBHYJY197 附件PowerON项目管理信息系统操作指导手册(分包商模块项目级)C版_第4页
第4页 / 共59页
QSLNGEPCKZBHYJY197 附件PowerON项目管理信息系统操作指导手册(分包商模块项目级)C版_第5页
第5页 / 共59页
点击查看更多>>
资源描述

《QSLNGEPCKZBHYJY197 附件PowerON项目管理信息系统操作指导手册(分包商模块项目级)C版》由会员分享,可在线阅读,更多相关《QSLNGEPCKZBHYJY197 附件PowerON项目管理信息系统操作指导手册(分包商模块项目级)C版(59页珍藏版)》请在金锄头文库上搜索。

1、HOMEPAGE. Opening of the companys extranet, every employee in the companys various point access to information on the INTERNET network . Nodes can be extended to 1000M, support shared communications and virtual network technology, to form a local area network system. Wide area network access system

2、should be applied according to the specific requirements of local area network system, and plant wide area network connections, including wide-area public networks,to make the following points: the room temperature between relative humidity maintained at 30%-55%, and 7 days a week, 24 hours a day is

3、 required. Keep free of dust and well ventilated, brightness of at least 50 candle light. Provide the right door, the door should open outward. To have a sufficient number of dedicated power outlet, provides volt 15 amp AC power to the device. This power supply for power and air conditioning or ligh

4、ting circuits apart. the whole systems color management according to the design of the comprehensive wiring system, the whole system to the implementation of an integrated color management, that is, different regions using different colors to the mark, specific color meanings are as follows: Blue: r

5、epresents the regional level subsystems, terminating in the blue area of the cables between the junction between levels to information outlets. White: represents the vertical cable subsystem, terminating in the white areas of the main cable wiring and wiring between floors. Green: input from the Cen

6、tral Office trunks Purple: from the data of common devices such as switches to lead. 2.6.7 design results in accordance with the ideas for the design of comprehensive wiring system, in line with the new plant office building, workshop technology requirements, 155Mbps ATM, and video transmission and

7、other requirements, in line with the 15-20 development of data communication within the development trend of the future. Based on the above design, design the system diagram in Appendix; other engineering equipment offer is attached. Part III, section I of the computer network system, System overvie

8、w the new plant production, office network-building workshop is built on a Foundation plant structured cabling, the use of advanced network technologies, formed met Office, business, scientific research and plant production group network. Plant network is the basis for intelligent network system as

9、a whole. Plants contain large amounts of information, should be used with a broadband local area network. Exchange of technology for the plants construction provides point-to-point connectivity, LAN tradition sharing the exclusive network structure into a parallel processing system. System should pr

10、ovide a channel for each user, and the channel is connected to a high speed backplane bus, each device can access each other to port speed. 100M to the desktop In factory production, and network with H3C is mature ERP management software recommended choice or CISCO series switches. Center backbone s

11、witches, non blocking switching performance, high port density, high reliability, as well as high-speed routing between subnets, IP networking, policy-based virtual network ports, more emphasis on analysis of flow control and roaming features. Secondary switch, with high performance, high speed Alli

12、ed port, VLAN support,PowerOn操作手册PowerON项目管理信息系统操作手册(分包商模块) 项目级济南普华春天应用软件有限公司 2014年10月目 录1登陆PowerON3登录PowerOn32、工程中心52.1项目的打开53沟通管理63.1收文管理63.1.1收EPC63.2发文管理83.2.1发EPC83.3项目周报173.3.1报EPC173.4项目月报203.4.1报EPC204资源管理204.1 资质信息采集204.2电焊工报验224.3无损检测人员报验234.4其他特种作业人员报验244.5合格焊工登记表244.6专职安全管理人员报验264.7设备机具准

13、入报验264.8计量机具报验275物资管理275.1材料领用申请275.2物资采购动态(WBS视角)305.3退库记录316 进度管理316.1设计计划及进度动态316.2施工计划及进度动态326.3施工计划变更336.4施工周进度反馈336.5施工进度两周滚动报表357 合同管理357.1工程进度款申报审查357.2项目结算申请单368.施工报验378.1办理工序报验378.2 工程材料报验388.3 开工/复工报告408.4停工报告418.5竣工报告428.6施工组织设计428.7施工方案429HSE检查439.1日检查整改通知单439.2HSE日检查整改回复单449.3HSE日检查通报4

14、69.4HSE检查周通报4710特种作业管理4810.1特种作业台账4810.2办理许可证491登陆PowerON登录PowerOn登录PowerOn必须要输入一个有效的用户名和密码,如图1-2-1 PowerOn登录。若要对登陆密码进行修改,可以在登陆以后进入到工程中心,点击【设置】=【修改密码】来进行密码修改,如图1-2-2 。如果用户忘记密码无法登录PowerOn,那么可以要求系统管理员在用户管理中为其修改密码。1-2-1 PowerOn登录界面 1-2-2 修改密码输入好用户名和密码后,可以选择想要打开的工程.。在选项一栏中,可以选择“进入企业级数据”或者“打开最后访问的工程”。点击登

15、录窗体上的确定,如果数据库连接、用户名、密码均无误的话,将会顺利登录到PowerOn。2、工程中心每个用户都有自己可定制的个人工作中心,可以方便地知道并处理自己的相关事项,包括责任事项、警示告示、启动起草、邮件、记事、即时消息、工作流程将与用户相关的工作直接送达到个人桌面。在工程中心可以通过左侧的模块导航栏进入相应的模块。工程中心2.1项目的打开在工程中心里面点击打开项目,在弹出的工程选择窗口中选择一个项目,然后点击确定,如图2-1-2所示。2-1-2 选择项目3沟通管理3.1收文管理3.1.1收EPC功能描述接收由CPE总部下达的红头文件传阅至相关部门。操作步骤分包商用户登录系统,点击分包商管理模块,选中收文管理下【收EPC】菜单,查看EPC回复的内容。双击记录查看记录内容。弹出下面窗体:切换到【附件】选项卡,单击按钮查看附件内容。如果需要对相关的EPC单位进行回复,可以点击按钮回复给发文人员。3.2发文管理3.2.1发EPC功能描述分包商发送给E