1、精选优质文档-倾情为你奉上7. Quality Control Measures7.1 The people who are engaged in doing test must have enterprise, consciousness of responsibility and relevant work certificates, and perform their position duties with due diligence. It is necessary for them to study and digest drawings and relevant document

2、s as soon as possible. If any problem is found, it is necessary to raise it in time. Further, being explicit with the work scope and test items is indispensable. 7.2 Testing personnel must comply with all valid regulations, specifications, provisions, standards, and methods issued by nation and acce

3、pted by industry. 7.3 Testing personnel must be familiar with the operation and performance of testing equipment, instrument and apparatus. And guarantee they are in good working conditions. 7.4 Testing personnel must make original records with discreetness and secure the authenticity and reliabilit

4、y of test data without leave-out and mistake, so that the data can serve as proof for investigation. The electronic version of test reports must be preserved properly to protect them from being damage and tampered. 7.5 When the quality is in conflict with the project period, insist on the quality fi

5、rst thought.The unqualified products are reported to the factory or replaced.7.6 Any accident due to poor quality, regardless of its seriousness, occurring or not cannot be hidden, indulged, and compromised.8. Safety, civilized construction and environmental management.8.1 General provisions8.1.1 Al

6、l workers who are engaged in construction must pass safety examination and health examination, understand safe operation regulations of different types of work. Before work can start, technicians must give safety instructions and safety instructions to workers and specify working method, procedure,

7、precautions and personal duties to workers. After this, the workers are required to sign off the instruction records for confirmation and registration before they are allowed to start working. Any worker who does not undergo instructions is not allowed to work on the site. 8.1.2 It is not allowed to

8、 drink alcohol during the work time. No one is allowed to enter the site intoxicated. It is forbidden to work when a worker is ill. 8.1.3 People who enter the site must wear PPE correctly. It is forbidden to wear slippers, high heels or shoes with nails; all special type of workers such as person wh

9、o is engaged in high voltage test must have certificates and be familiar with their own work. 8.1.4 Test equipment must be stacked in order tidily based on the regulations set up and comply with transportation and firefighting requirements.8.1.5 Set up sufficient illumination for night shift. 8.1.6

10、Workers who need to work at height must wear harness and hook it to the safety rope to avoid falling down from the height. 8.2 Test in a safe manner 8.2.1 Only electrician is allowed to dismantle and assemble construction power consumption facilities. 8.2.2 Electric equipment must be operated based

11、on tag instructions. It is forbidden to use one switch for several power connections. 8.2.3 It is not allowed to hook the wire directly to the switch blade or directly plug wire into power socket. The switch of test devices should adopt double-pole switch with obvious break point and reliable overlo

12、ad protection device. 8.2.4 When works in the site, based on the voltage class of the electrified body the testing personnel must keep a safe distance away from electrified body, which should not be less than the distance regulated in the safety regulations .8.2.5 The metal shell of the test tools m

13、ust have proper grounding. Wiring between test instruction and equipment must be firm and reliable. After insulation resistance measuring and DC test is finished, it is necessary discharge the tested objects thoroughly. 8.2.6 The test should be conducted under the circumstance when the weather is go

14、od. If strong wind and thunderstorm take place, it is necessary to stop the test.8.2.7 After the test is complete, testing personnel must dismantle temporary grounding wire and inspect the tested equipment and clean the testing spot.8.3 Housekeeping Measures8.3.1 After the test is completed, the pri

15、ncipal finish the work, clean the site and take away the material should be abided by. 8.3.2 The wall and barricading established on the site must be stable, tidy and nice. 8.3.3 Testing personnel must establish awareness to protect finished products. It is forbidden to dismantle, take away and pain

16、t the finished products arbitrarily without permission. 8.3.4 It is not allowed to work after drinking. 8.3.5 No smoking is allowed within the testing spot. No open fire is allowed for keeping warm within testing spot. 8.3.6 When leave the working area, it is necessary to shut down the power supply and lock the window to protect the working area from theft. 8.4 Environment Protection Measures 8.4.1 The tags and labels on the