OWNER CONTROLLED INSURANCE PROGRAM.docx

上传人:s9****2 文档编号:511322604 上传时间:2023-08-10 格式:DOCX 页数:40 大小:218.88KB
返回 下载 相关 举报
OWNER CONTROLLED INSURANCE PROGRAM.docx_第1页
第1页 / 共40页
OWNER CONTROLLED INSURANCE PROGRAM.docx_第2页
第2页 / 共40页
OWNER CONTROLLED INSURANCE PROGRAM.docx_第3页
第3页 / 共40页
OWNER CONTROLLED INSURANCE PROGRAM.docx_第4页
第4页 / 共40页
OWNER CONTROLLED INSURANCE PROGRAM.docx_第5页
第5页 / 共40页
点击查看更多>>
资源描述

《OWNER CONTROLLED INSURANCE PROGRAM.docx》由会员分享,可在线阅读,更多相关《OWNER CONTROLLED INSURANCE PROGRAM.docx(40页珍藏版)》请在金锄头文库上搜索。

1、Attachment EOCIP Insurance ManualNew San Andreas CourthouseSuperior Court of California, County of Calaveras795696222.docOwner ControlledInsurance Program(OOP)Project Site (ProjectActivities)A consolidated master insurance and claim management program, under which Commercial General Liability, Worke

2、rs1 Compensation, Employers Liability, Excess Liability, Excess Products and Completed Operations Liability, Builders Risk, and Contractors Pollution Liability insurance (and other specified coverage) are provided for all Enrolled Contractors, while performing operations at the Project Site.The site

3、 located at San Andreas, which has been designated by the AOC in the construction agreements between the AOC and the Construction Manager, and has been scheduled with the OCIP insurance companies, including operations necessary or incidental to the Project being constructed in the state of Californi

4、a. The Project Site nor the Project Activities do not include the Enrolled Contractors regularly established workplace, plant, factory, office, shop, warehouse, permanent yards or other off-site locations of Contractors, even if such locations are for fabrication of materials to be used at the Proje

5、ct Site unless such off site location or activity has been specifically added to the definition of Project Site and has been accepted by the OCIP insurance companies as such.SECTION 4OCIP INSURANCE COVERAGE4.1 This Section provides a brief description of the insurance provided to Enrolled Contractor

6、s under the OCIP. Each Enrolled Contractor shall refer to the actual policies for details concerning coverage, exclusions, and limitations. While the OCIP is intended to provide uniform coverages and reasonable limits, the OCIP is not intended to meet all the insurance needs of the Enrolled Contract

7、ors. Each Enrolled Contractor and Excluded Contractor should discuss the OCIP with its insurance agent, broker, or consultant to assure that it maintains proper insurance coverage and limits of liability as required by the terms and conditions of the various contracts under which either an Enrolled

8、Contractor or an Excluded Contractor will provide work at or for the Project Site. Each Enrolled Contractor must notify its insurance agent or broker that the work performed on the Project Site will be insured under the OCIP. This is necessary as the Enrolled Contractors insurance agent or broker mu

9、st inform the Enrolled Contractors practice program insurers that the insurance coverages provided under the OCIP are primary on the Project Site.4.2 Workers Compensation and Emplovers Liabilitv:(Off-site operations of a Contractor are excluded from OCIP insurance unless specifically added to the OC

10、IP by endorsement)Part One 一 Workers* CompensationStatutory LimitPart Two 一 Employers5 LiabilityBodily Injury by Accident, each accident$1,000,000Bodily Injury by Disease, each employee$1,000,000Bodily Injury by Disease, policy limit$1,000,000The insurance will include statutory coverage as required

11、 by jurisdiction, and each Enrolled Contractor will be issued a separate Workers* Compensation policy. The insurance will include coverage for US Longshoremens & Harbors Workers Liability Act, will include a waiver of recovery or subrogation in favor of the Enrolled Contractor, and will include a sp

12、ecific endorsement designating that the insurance is applicable to the Project Site.The payroll reported on the Payroll Reporting Form and loss experience incurred on the Project Site will be reported to the California Workers Compensation Insurance Rating Bureau (WCIRB) in the normal manner for use

13、 in calculating the Enrolled Contractors future experience modifier. Consequently, the loss experience incurred for Enrolled Contractor operations conducted at the Project Site may potentially impact the Contractors future insurance costs and further underscores the importance of compliance with the

14、 Project safety program and the OCIP safety guidelines.4.3 Commercial General Liability:Commercial General Liability Insurance, which shall include coverage for liabilities arising out of premises, operations, independent contractors, products and completed operations, personal and advertising injur

15、y, liability assumed under an insured contract, for the Enrolled Contractors operations performed at the Project Site (Off-site operations of a Contractor are excluded from the OCIP unless specifically added by endorsement) with limits not less than:Limits of Liability (Shared bv all Enrolled Contra

16、ctors insured by OCIP on the Project)Each Occurrence Limit$2,000,000Personal Liability and Advertising Liability Limit$2,000,000General Aggregate$4,000,000Products/Completed Operations Aggregate$4,000,000Damages to Premises Rented to You Limit$500,000Medical Expense Limit$10,000The Products & Completed Operations insurance shall extend for 10 years after substantial completion of the Enrolled Contractors wo