桥面系及附属结构施工方案

上传人:汽*** 文档编号:510926127 上传时间:2024-02-13 格式:DOC 页数:29 大小:192.52KB
返回 下载 相关 举报
桥面系及附属结构施工方案_第1页
第1页 / 共29页
桥面系及附属结构施工方案_第2页
第2页 / 共29页
桥面系及附属结构施工方案_第3页
第3页 / 共29页
桥面系及附属结构施工方案_第4页
第4页 / 共29页
桥面系及附属结构施工方案_第5页
第5页 / 共29页
点击查看更多>>
资源描述

《桥面系及附属结构施工方案》由会员分享,可在线阅读,更多相关《桥面系及附属结构施工方案(29页珍藏版)》请在金锄头文库上搜索。

1、videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the five water treatment 357 timetables for three years to resolve outstanding issues, obviously worked, victory of the year. The Countys departments at all levels must firmly establish the guanghui is gold

2、and silver green development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well five water treatment of winning the war, ever-higher levels of comprehensive well-off society was built. (A)

3、 lay the sewage uphill battle. This year we will river water quality improved at the county level, up to five this basic objective grasp of pollution control that focus, with the focus on three things: a good job, clear rivers reaching the County created. Organization look back special inspection, t

4、he County garbage River, black and odorous River is Dragnet investigation, timely rectification of problems found in place firmly to prevent river pollution rebound. In accordance with the one-stop strategy, improving the inferior five water quality monitoring stations work this year to ensure the E

5、limination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of clear rivers standards. Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water

6、source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve effluent from sewage treatment rate, running accuracy, compliance requirement, speed up the towns support network construction, is focusing on nanotubes home last meters question. Do

7、mestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to ensure the realization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural dom

8、estic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play, avoid the Sun problem. Third, pay special attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to dig up mud

9、, as the deepening water of this years plays. Next, to jump-start an investigation line touches work, implementation plan according to the priorities and the programme of work, in accordance with the one river one policy requires detailed cleaning, dredging plan, planning ahead of time cleaning out

10、mud way out, according to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primarily the source of backward production capacity, increase the intens

11、ity of 四川川交路桥有限责任公司 河北张承高速TJ3合同项目经理部桥面系及附属施工方案张承高速TJ3合同段桥面系及附属施工方案为圆满完成本合同段桥面系及附属构造工程,根据施工招标文件,在认真阅读和充分理解设计意图及对施工现场作详细调查的基础上,并结合我公司的施工经验,以信守合同、确保工期和质量、合理控制工程造价、优质高效文明施工为指导思想,编制本工程施工方案。在编制过程中,我们立足于专业化、机械化、标准化施工,重点工序重点安排,特殊部位特殊考虑,并结合工期和工程实际进行统筹,尽量做到现场布置合理,方案切合实际,施工组织科学,以便为优质、高效、安全的完成该工程奠定基础。一、编制依据、范围和

12、原则1、编制依据承德至张家口高速公路承德段TJ3合同段桥梁施工图设计公路工程标准招标文件(2009年版)承德至张家口高速公路承德段丰宁互通至承张界主体土建工程施工招标招标文件公路桥涵施工技术规范(JTG/T F502011)公路工程质量检验评定标准(土建工程)(JTG F80-1-2004)河北省高速公路施工标准化管理指南河北省张承高速公路承德段施工标准化管理实施细则 2、编制范围张承高速公路承德段TJ3合同段桥面系及附属工程施工。3、编制原则总的原则是:施工组织设计符合现场实际施工需要。3.1服从业主方、遵守设计的原则;3.2确保工期的原则;3.3质量第一的原则;3.4安全第一、预防为主的原

13、则;3.5科学管理的原则;3.6文明施工的原则;3.7降低工程成本的原则;3.8遵照执行标准、规范的原则。二、工程概况1、工程概述本项目位于承德市丰宁县小坝子乡境内。我合同段桥梁上部结构采用40m预应力混凝土T梁,先简支后连续。桥台处设置80型伸缩缝,对应位置(按图纸)桥墩设置160型伸缩缝,设计角度为90。每跨半幅梁板为6片,桥梁宽度变化时采用调整纵向湿接缝的宽度来调整。桥面净宽11.75m,桥面现浇层采用D12冷轧带肋钢筋焊网。 1.1、地形、地貌本桥位于新房村以南,老虎沟村以北,主要跨越深谷地形,主墩最大桥高58m,该沟谷较深,汇水面积达到27km2。沟内冲刷明显,雨季时沟内水流很急。该

14、桥地质情况较差,表层及40m以内多为粘土和碎石,再往下为强和中风化凝灰岩。1.2、气候、水文项目所在的承德市丰宁县小坝子乡属大陆性季风气候,气候为寒温带向暖温带过度,半干旱向半湿润带过度,大陆性、季风型燕山山地气候。总体特征为春秋干旱多风,冬季干寒漫长,夏季短促,雨量充沛。月平均气温-921.5C, 该区域年平均降水量为402.3882.6mm,全年无霜期为150天左右,区域最大冻土最大深度为1.26米,最大风速1520m/s,多年平均风速为2.1m/s,最多频率风向NW,干燥度1.11.5。地下水分部不均匀,埋深时浅时深,沟谷中埋深多大于10米。山区段为贫水区,一般属于基岩裂隙水,开采难度较

15、大。1.3设计标准1.3.1汽车荷载等级:公路-级1.3.2桥面净宽:净11.75m,全宽13m。1.3.3设计洪水频率:1/1001.3.4地震动峰加速度:0.05三、施工部署1、施工部署原则根据路基的施工特点, 施工前修筑贯通全线的施工便道,我部主要建1条纵向便道,总计长7.9km,保证材料、砼等的及时供应。本合同段新房大桥空心墩施工采用翻模法施工。2、施工进度安排施工准备:2014年3月15日2014年4月1日。桥面系及附属施工:2014年4月10日2014年8月20日。3、施工组织机构本公司成立了“张承高速承德段TJ3合同项目经理部”代表本公司全面负责该项目工程的施工组织、成本核算、进度、质量控制及目标管理。项目部下设新房大桥墩台身施工机构,人员如下: 施工现场责任人:桥梁工程师罗燕平,施工员曾建、张斌,负责现场施工技术,生产进度安排,机械调度; 测量工程师:蔡仲双,负责本桥放样工作; 施工质检负责人:质检工程师杨志林,负责施工质量检验,各种质检表格的填写和上报;试验室负责人:试验工程师马友华、试验员李秋生,负责施工现场试验,填报各种试验表格; 专职安全员:安全保卫部长郭章胜、专职安全员王林负责施工现场安全,安全交底及安全检查。现场施工机械负责人:机械物资部覃桂吉,负责现场机械的调度。材料负责人:付永天,负责新房大桥材料质量检测。4、投