资源描述

《南昌某项目可行性研究报告52页(2008年4月)》由会员分享,可在线阅读,更多相关《南昌某项目可行性研究报告52页(2008年4月)(54页珍藏版)》请在金锄头文库上搜索。

1、videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the five water treatment 357 timetables for three years to resolve outstanding issues, obviously worked, victory of the year. The Countys departments at all levels must firmly establish the guanghui is gold

2、and silver green development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well five water treatment of winning the war, ever-higher levels of comprehensive well-off society was built. (A)

3、 lay the sewage uphill battle. This year we will river water quality improved at the county level, up to five this basic objective grasp of pollution control that focus, with the focus on three things: a good job, clear rivers reaching the County created. Organization look back special inspection, t

4、he County garbage River, black and odorous River is Dragnet investigation, timely rectification of problems found in place firmly to prevent river pollution rebound. In accordance with the one-stop strategy, improving the inferior five water quality monitoring stations work this year to ensure the E

5、limination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of clear rivers standards. Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water

6、source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve effluent from sewage treatment rate, running accuracy, compliance requirement, speed up the towns support network construction, is focusing on nanotubes home last meters question. Do

7、mestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to ensure the realization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural dom

8、estic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play, avoid the Sun problem. Third, pay special attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to dig up mud

9、, as the deepening water of this years plays. Next, to jump-start an investigation line touches work, implementation plan according to the priorities and the programme of work, in accordance with the one river one policy requires detailed cleaning, dredging plan, planning ahead of time cleaning out

10、mud way out, according to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primarily the source of backward production capacity, increase the intens

11、ity of 可行性研究报告建设路项目可行性研究报告目录一、报告摘要31.1、项目市场条件31.2、行业竞争状况31.3、经济分析结论31.4、风险及建议5二、项目概况62.1、项目位置62.2、项目用地经济指标6三、项目投资环境73.1、宏观经济分析73.1.1、经济持续快速增长73.1.2、与周边中部城市比较,位居中部城市前列73.2、南昌经济发展分析小结8四、城市规划发展分析94.1、城市化进程加快,城市发展四面扩展94.2、城市规划发展结论10五、房地产政策分析115.1、房地产政策分析115.2、政策分析小结13六、市场需求分析156.1、房地产快速发展,房价一路盘升156.2、住宅

12、市场供需两旺,差额逐渐加大156.3、从价格到产品,南昌升级换代需求旺盛166.3.1 户型的需求分析166.3.2 物态的需求分析176.4、小结17七、市场供应分析187.1、房地产发展趋势187.2、小结18八、土地出让情况分析19九、行业竞争形势分析总结21十、行业竞争形势分析总结2210.1、隆鑫广场2210.2、景河星宫2610.3、中大紫都2810.4、江信国际嘉园3110.5、玉河经典3510.6、各竞争楼盘比较分析3710.7、本项目价格分析结论39十一、项目发展定位4011.1、项目SWOT分析4011.2、项目形象定位(略)4011.3、项目产品定位4011.4、有关工程

13、计划说明41十二、项目总投资估算、资金筹措计划、投资计划4312.1、项目总投资估算4312.2、土地费用4312.3、前期工程费用4312.4、基础设施建设费用4412.5、建筑安装工程费4412.6、公共配套设施费用4412.7、开发期内各种税费支出4412.8、不可预见费用4412.9、开发成本4412.10、管理费用4412.11、销售费用4512.12、财务费用4512.13、开发费用4512.14、项目总投资4512.15、资金筹措计划45十三、项目经济效益、财务分析4613.1、项目经济效益估算4613.2、项目静态经济指标4613.3、项目土地价格测算4613.4、项目不确定性

14、分析4713.4.1、销售价格变化的不确定性分析4713.4.2、容积率变动的不确定性分析47十四、结论、风险和建议5114.1、项目市场条件5114.2、行业竞争分析5114.3、经济分析结论5114.4、风险及建议52treatment of heavily polluting industries. According to municipal, and municipal government deployment of seven big heavy pollution industry regulation three years action plans, requirement

15、s to December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped eliminated in place; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standard of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in place, late not Park of are discontinued. In the process of renovation, will