1、 本科毕业论文(翻译)英文标题Continuous circulation drillingsystem学生姓名学号教学院系专业年级指导教师职称单位辅导教师职 称单位完成日期 2013年04月 Continuous Circulation Drill String SubAbstract There is an increasing need to drill difficult reservoirs in a cost effective way. Over the past few years Managed Pressure Drilling (MPD) has made it poss

2、ible to drill reservoirs which have a narrow window between pore and fracture pressure gradients. Before the introduction of MPD techniques, safely drilling and completing these formations was very costly and not always successful. Cycling the mud pumps off and on for connections affects the pressur

3、e and is a major problem for MPD.Techniques and equipment have been developed to make a connection while continuing to circulate the drilling mud to maintain constant pressure. Since 2005, the Continuous Circulation System (CCS) has allowed continuous circulation during connections with traditional

4、jointed drill pipe, by using a chamber around the connection. Several companies have developed continuous circulation subs which are threaded between tool joints to achieve continuous circulation without a pressure chamber. These have had varying degrees of success from both an operational and safet

5、y standpoint. This paper describes the current MPD market and describes the philosophy adopted for a new side-entry sub.IntroductionHistory was made in July of 2003, when the first continuous circulation chamber was tested in prototype form on a land rig. Jointed drill pipe was separated inside a se

6、aled chamber, which was filled with drilling fluids provided by the mud pumps. The drill string was separated, another joint added, and drilling continued without ever shutting down the mud pumps. After its introduction in 2005, many operators have begun using the continuous circulation chamber as a

7、 way to drill un-drillable wells, specifically those having “tight” pore pressure and fracture pressure windows. This means that the bottom-hole pressure must be very closely controlled at all times (even during connections) to avoid either fracturing the formation, or allowing an influx. The system

8、 has worked reliably for the last six years.However, many operators cannot easily accommodate the dedicated crew required to operate the continuous circulation chamber.As operators weighed the benefits against the increase in drill crew, the obvious solution was to provide the same continuous circul

9、ation functionality, with a streamlined package that reduced the footprint on the rig operations. There have been many attempts to create a continuous circulation sub which allows the mud flow into pipe sitting in-slips without flowing through the top drive. Many of these attempts have been successf

10、ul, but have introduced a major safety concern. When looking at continuous circulation chambers, the barrier to prevent fluid from erupting out of the separated connection is typically a gate valve, with replaceable rubber seals. This barrier is replaceable and inspectable before exposing the crew t

11、o a potential leak. The recently introduced continuous circulation subs have all introduced a non-replaceable, non-inspected barrier. The rig crew is also responsible for attaching high pressure connections to the sub during operation.With all these points in mind, existing continuous circulation su

12、bs have presented major safety concerns and reliability weaknesses.The new continuous circulation sub is focused on safety, reliability, and becoming part of the drilling process. The design does not place rig personnel near the high-pressure drilling ponent between the high-pressure drilling mud an

13、d atmosphere is easily removed and inspected between every connection. Each connection is checked for seal integrity before separation. This ensures reliability of the barrier, regardless of how long the sub has been in operation. The entire system is designed with the idea that the driller and exis

14、ting crew will operate the equipment just as easily as existing floor equipment (ie, iron roughnecks, pipe rackers, etc). The solution aims to become a standard part of the drilling process; some key contributing features will be described. With the initial testing phase completed, the results will

15、also be presented and discussed.The Concept The new continuous circulation sub has been designed with the same attention to detail as the original continuous circulation chamber. It has hands-free connection of the mud bypass, a replaceable barrier, automated connection integrity checks, and integra

16、tion into the drilling process with the rig crew. Hands free connection When using the continuous circulation chamber, the drill pipe was fed through several ram type Blow Out Preventer (BOP) style seals. This provided a sealed chamber around the connection. These seals were positioned at well center and were always in position, simply re