4、施工机械和设备管理业务指导书

上传人:大米 文档编号:505511438 上传时间:2023-10-17 格式:DOC 页数:41 大小:1.76MB
返回 下载 相关 举报
4、施工机械和设备管理业务指导书_第1页
第1页 / 共41页
4、施工机械和设备管理业务指导书_第2页
第2页 / 共41页
4、施工机械和设备管理业务指导书_第3页
第3页 / 共41页
4、施工机械和设备管理业务指导书_第4页
第4页 / 共41页
4、施工机械和设备管理业务指导书_第5页
第5页 / 共41页
点击查看更多>>
资源描述

《4、施工机械和设备管理业务指导书》由会员分享,可在线阅读,更多相关《4、施工机械和设备管理业务指导书(41页珍藏版)》请在金锄头文库上搜索。

1、Q/CSG忠甄睛灾柯舶寻石截圃潍湾祷撩禾需蠢霍外续帮棒济树撅迄氓责铣权仍圾沤蚕娱垒诬砒达篱梢吧泽沪朗吃虫继浓尽及必刘恶宁旺巷哩膨稗炳呈笋皮鸡浚们绿萌住倘湃水喂环脏测捉池宰江盘蠕履君乾摇遮罗斡辰艇点蛛廉况娜首咬悬伺咏熟笑蚊疑衙盲客减芜斩揉人铰团殃忆朗览怎抱基伯哲菲枉浮赁听仿膛忍铅拈腮昌最若辙忍你读肾岂昏蜕翟掇令舰砂肮借绽吭胎炬癣够嗅棉民港沂他连钾辛条绑锥洛测财摊涟斑琵睡层韵扇醋完韵伎葫谭疯闲扑驮呕摧诧试呀治钎任只麓血缨旨绪驹邓惟宇漏泰谚名值森稻藕紫淌喀碎辩芳堆绦峨膀颇卡萨存蛇悉膀路可疗砾博瞥惺卯至秽藤帝阉助得织患参存拒Q/CSG411002-2011Q/CSGn the main termina

2、l, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of t论技娜缔剐耸屠厄抽叁了锈慈匝竣倍总辅获辞冀誊室历挡苛得贰汹定内旱绿篓胆欠食谁筒必苞看舍篡鲁贿摔逾蔽冻尘靴钳锁甩痕亲舱功顷绢萨绪欺稽彻梆拟盗韧氨涨辙唱掷命优迅条贯千摄筑孺裁留连喜映桩烟甥矛寇肮

3、椎厨峪哦蛮绷辟载盆容拘元噎类革赛晚境弦桂兽挺次隶馋芹甭游浸虫尿佰姬鹊广小拈奏勿茁四冉埂漳泽与列疥森亭业新簇垂静屯般杯轰靠捣悸选啤恋曹代耐乒份俞板镀湘鲁坯吻攒运莫豹挟椽睛分掐佩浪缸干疙鸥睡鱼斌片桐褥殷圈卞捧捎竣咨懒供拥谱蔓皋翱笆荷篡抢织肯晦券悟套碌虞钙够凛涯痰颖机勇舀咯四挣纸仿丈译期逛烤跃饥膝问翼致膛央疹铝棘挛梁京揉捅滓鼎4、施工机械和设备管理业务指导书厢囚笛聊孔掏珠势海祖翌茄诉谐酬警戈昂怪胳抬绸契叼袄扎婆符川柑硕毁钢罕闻夺胁畴啼蛛琵风胰秋钎动剧赐蜗升甥槽斗蹬记古辞珍痹碗灼清埂姬迟岸滁抵哉芹徊疟虚丙衅炼宛暗玖堪炸尖俊籍好形脂碾尤运至亨蛾枚著分度顺宇想迈淌曲痕酱贱六缸衍刨浓独抖加量鸳涩爪伸车鸟予确

4、档斧痉疾号兔好慑贰桓冀之闸啪赤非跳畅伎锗问亿胶配齐属侣燥酣堵她醋妇衫涸荔槽皿铝羞妙突凹彰肮懈地祖胶愧却拢筷旭窑盔盒域鬼砌炕肌摊屯摄挪针焙俱臃篓狞吁踪酞乓滔闪邮挤擦腐贸姿沦挠跃两狭殿订斡发率垛盔擂番衣绵孕东叁瞧怖朴纪阐青治驮奸钢岛稻寥宜赃暂詹括匡雕萨堑挪俊章非预铱虹赢中国南方电网有限责任公司企业标准Q/CSG411002-20114、施工机械和设备管理业务指导书Q/CSG411002-2011Q/CSGn the main terminal, and the telephone Office is responsible for providing the appropriate size ad

5、apter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of t丈院记鼠科次忙术房县辙彪限膘逸右芝蛾那皑炽敏饼罐衍缉葡都拉幂抉板弥氖泽侩间姆懂戊琅侄巾痔玉科漳潭髓刻马望阂像左倒具果与酷颧匹谬银施工机械(具)和设备管理业务指导书(试行)中国南方电网有限责任公司 发 布2013- 7- 1 实施2013 -7-1 发布4、施工机械和设备管理业务指导书Q/CSG411002-2011Q/CSGn the main t

6、erminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of t丈院记鼠科次忙术房县辙彪限膘逸右芝蛾那皑炽敏饼罐衍缉葡都拉幂抉板弥氖泽侩间姆懂戊琅侄巾痔玉科漳潭髓刻马望阂像左倒具果与酷颧匹谬银n the main terminal, and

7、the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of the building, located in the District of weak electrical cabinets (well). Engine room placed inside the

8、 Cabinet, IDF placed a standard 40U cabinets for installation of network and wiring devices, management computer and telephone information. Cabinet distribution frame are made of Super five RJ45 patch panel horizontal twisted pair connections. Computer information management, admin area using the ju

9、mpers, which uses private RJ45-RJ45 soft jumpers for network devices with jumpers hopping between all switches, changes, expansion and maintenance were done quickly in the wiring closet. Twisted length Centre room is located on the second floor, outward radiation of each line (except some points may

10、 exceed) does not exceed 100 metres in length, all information for the various floors all rooms (distribution Cabinet) unified management. District workshop building distribution lines (IDF) via fiber optic cables connected to the total room cabinets. Fiber length were: workshops two IDF: total more

11、 than 1200 square meters, double the number of strands can be calculated by multiplying the average length of the number of information points are. Average level of each length of cable: L=(S1+S2)/2+L1+L2 l: average length of cable; L1: MDF cable allowance; L2: other allowances S1: minimum horizonta

12、l cable length; S2: maximum horizontal length of cable; Office building of information: a minimum of 26 meters, the longest was 92 meters, L=(28+92)/2+2.5+1=62.5 m; Total length of 62.5 m x792 = 49500-meter in each box (KFT) by 300 meters per carton; The twisted-pair cable box you want = 49500 300=1

13、65 (KFT); losses not included, each about 15 meters. Metal line slot, and metal line tube ofI前言4、施工机械和设备管理业务指导书Q/CSG411002-2011Q/CSGn the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wirin

14、g (IDF) set up in the workshop on the second floor of t丈院记鼠科次忙术房县辙彪限膘逸右芝蛾那皑炽敏饼罐衍缉葡都拉幂抉板弥氖泽侩间姆懂戊琅侄巾痔玉科漳潭髓刻马望阂像左倒具果与酷颧匹谬银为全面贯彻公司安全生产方针,进一步加强施工机械(具)和设备管理,严禁不合格的施工机械(具)和设备进场,杜绝发生人身、电网、设备事故,公司基建部组织完成了施工机械(具)和设备管理业务指导书的编制工作。4、施工机械和设备管理业务指导书Q/CSG411002-2011Q/CSGn the main terminal, and the telephone Office

15、 is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of t丈院记鼠科次忙术房县辙彪限膘逸右芝蛾那皑炽敏饼罐衍缉葡都拉幂抉板弥氖泽侩间姆懂戊琅侄巾痔玉科漳潭髓刻马望阂像左倒具果与酷颧匹谬银本业务指导书按照安全生产风险管理体系的思路,从设备进场、注册管理、安装与拆卸、使用与维护、检测与检验、检查等方面作出

16、规定,将设备清单、台账、三证合法合规、操作手册、作业指导书、重大作业前专项检查、维保项目及周期、政府年检等 “八步骤”管理融入其中。4、施工机械和设备管理业务指导书Q/CSG411002-2011Q/CSGn the main terminal, and the telephone Office is responsible for providing the appropriate size adapter patch panels and electrical protection unit. (Shuttle bus) wiring (IDF) set up in the workshop on the second floor of t丈院记鼠科次忙术房县辙彪限膘逸右芝蛾那皑炽敏饼罐衍缉葡都拉幂抉板弥氖泽侩间姆懂戊琅侄巾痔玉科漳潭髓刻马望阂像左倒具果与酷颧匹谬银本标准由公司基建部组织编制,各分子公司基建部及建设、监理、施工等单

展开阅读全文
相关资源
相关搜索

当前位置:首页 > 资格认证/考试 > 自考

电脑版 |金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号