实习报告英语版3

上传人:m**** 文档编号:496814477 上传时间:2022-08-19 格式:DOC 页数:7 大小:35KB
返回 下载 相关 举报
实习报告英语版3_第1页
第1页 / 共7页
实习报告英语版3_第2页
第2页 / 共7页
实习报告英语版3_第3页
第3页 / 共7页
实习报告英语版3_第4页
第4页 / 共7页
实习报告英语版3_第5页
第5页 / 共7页
点击查看更多>>
资源描述

《实习报告英语版3》由会员分享,可在线阅读,更多相关《实习报告英语版3(7页珍藏版)》请在金锄头文库上搜索。

1、实习报告英语版(3)_实习报告 实习是我们脱离大学之前的一次珍贵演习,正确地认识自己。以下是为大家整理的实习报告范文英语版。范文一Graduation reportGraduation practice is to plete the final phase of the university s course to be the most important section of the Practice. Practice is every qualified students must havean experience that allows us to enhance profess

2、ionalism in the practice of awarenessand practice of awareness. We practice during the process of training units in theschool and support, more guidance of experts, through training we learned a lot in class, not simply the knowledge of school for our future design and lay a solid foundation. At the

3、 same time allow themselves to contact the school for the purpose ofinternship training of our ability, the five-week internship to increase their ability to havea lot of knowledge, greatly improved.Graduation purposeInternship is designed to improve the ability of students and social contacts and t

4、o understand and master, verify and consolidate learned basic course content. Enable students to understand the modern high-rise building design and the actual construction of electrical easy to ignore the problem, students integrate theory with practice, love the professional, enthusiastic, mitted

5、to thinking of China s modernization drive.Graduation contentTo achieve the above objective practice, practice the main content should include:1. Understand the internship process and production organization of productionmanagement.2. Understand the performance of some electrical products and featur

6、es.3. Control low-voltage distribution system design, weak part of the design, lighting,part of the design, dynamic part of the design, lightning protection and grounding part of the design.4. Institute of electrical equipment used in operating methods and the basic working principle.Although this p

7、ractice is only 3 weeks time, but during that time, the theory for somemon things, with perceptual awareness, feel benefit.Here are some of my summary of the internship period, and their feelings and experiences. To carry out their work in the future, and the future work of great help tome.Visit the

8、 West Campus, Dongsheng Building and City Hall and linear low-voltagepower distribution room, and the laying of the roof there are weaknesses in the design of some of mine. Now I will explain in detail the building of the lightning protection and grounding1. Basic principles:Lightning protection des

9、ign of technical measures should be the existing national standard lightning protection design of buildings for Lightning Protection, refer to Building Lightning Protection Design Standard corresponding requirements, the use of ball lightning rod protection method, the use of other potential join th

10、e most important safety measures.2. Anti-cloud-to-measure, should meet the following requirements:(1) air terminals using the lightning rod, lightning protection zone (network), or a bination of both, it should be used as a metal roof building air terminals, but should be consistent with regulatory

11、requirements. Containing radioactive material should not be used air terminals. The elimination of other forms of lightning, it should only be used with high pole tower roof was added to our building on. Protrusions on the roof, such as satellite and receiver antenna, holiday lights, aviation obstru

12、ction lights and air-cooled unit, the roof should be in the range of lightning protection devices, if not calculated by ball within the scope of protection should be separate lightning rod, with protection, lightning protection device connected with the roof.(2) deflectors should give priority to th

13、e use of reinforced concrete building columns or shear walls in the main bar, but also should use the building on fire ladders, steel columns, metal chimneys, etc., as deflectors.When the use of steel in reinforced concrete columns, steel columns as a natural drop, and also used as a grounding devic

14、e based steel with no disconnect card, but it should be located in a number of suitable locations outside the bar connected with the column connecting plate, for the measurement, an external artificial grounding and equipotential bonding for use.Brick buildings surrounded by a separate deflectors in

15、 the external walls and the installation of 1.8 meters from the ground disconnected card. The 1.7 meters to 0.3 meters underground for some protective measures should be taken.(3) The use of grounding devices should give priority to the building of reinforced concrete base. A reinforced concrete ground beam, should in the beam reinforced with a ring grounding device; not reinforced concrete ground beam, it can not in the building surrounding strip of reinforced concrete base closed, galvanized flat steel with a direct lay-40x4 pit in the outer groove to form a circular grounding.When the t

展开阅读全文
相关资源
相关搜索

当前位置:首页 > 办公文档 > 工作计划

电脑版 |金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号