1、implemented, the operating environment which does not comply with the safety requirements, workers have the right to refuse to work. Five, the lifting work safety license management 1. the lifting work safety license by the competent departments responsible for the management of the company. 2. this

2、 by lifting the Unit received, and conscientiously implement the hoisting and lifting head, operations people, and according to the requirements for approval. 3. the safety operating permits are not allowed to transfer, alter, no off-site use, or expand the scope of uses. 4. the persons listed in th

3、e safety operation card should be consistent with the field, when personnel changes should go through the signing procedures and related matters of the transition. 5. the certificate of safe operation of lifting operation does not complete within the allotted time, shall renew the certificate of saf

4、e operation of lifting. 6. in the event of relevant meetings, breaks, night work and other special reasons, that corresponds to the job ticket must be issued after approval, the personnel and, other officers will be to replace 7. two promissory notes, exchange equipment Management Department, head o

5、f the stock exchange operation. 8. work permits management should establish the ticket file (inventory), the ticket is kept for 3 years. Temporary power supply operation management system, to ensure that the companys safety, strengthen management of temporary electrical safety, avoid personal electr

6、ical shock, fire, explosion and electrical hazards, safe, regulate electricity system is formulated. II, scope of application apply to temporary power of company-wide operations and foreign construction electric work. Third, the contents and requirements (a) temporary electrical safety requirements

7、1. Temporary electrical work must apply for temporary power operating license, no temporary power operating license are not allowed to work. 2. distribution boxes, metal boxes, metal switch box installation and electrical normal uncharged metal base, shell must do to protect, such as zero, zero and

8、the zero line should use a separate Terminal Board connections. 3. temporary electricity switchboard, distribution boxes with numbers and measures rain, lighting, must be able to secure close switchboard door, at all levels of distribution boxes shall not be stacked within a 2 m radius of debris and

9、 rain protection measures. 4. each electrical device must have a machine, a gate, a leak and a box System. Switch box and the horizontal distance control of fixed electrical equipment should not be more than 3 meters, the protector should match the capacity under the control of the device. 5. when a

10、 temporary electric lines overhead, cannot use bare wires, aerial height shall not be less than 2.5 m in the device, outside of not less than 3.5 metres, crossing roads shall not be less than 5 m; reliable protection measures are required when crossing a road, is strictly prohibited in the trees or

11、on scaffolding erected temporary power lines. 6. underground lines must be installed to the flag and safety signs. Cables shall be not less than 0.7 meters deep, through roads likely to be lots of mechanical injuries should take protective sleeve, cover plate, and so on. 7. portable lighting, places

12、 such as basements, metal containers, wet, when you must use a safe voltage up to 36V. Transformer 36V prohibited the use of . 3. the temporary electrical permit 30KW or more issued by the engineering equipment management, 30KW electric Management Department opened in four copies, a Security Ministr

13、y archives, one for electric charge, a copy to the electricity sector, an electrician.We will continue to improve the companys internal control system, and steady improvement in ability to manage and control, optimize business processes, to ensure smooth processes, responsibilities in place; to furt

14、her strengthen internal controls, play a control post independent oversight role of evaluation complying with third-party responsibility; to actively make use of internal audit tools detect potential management, streamline, standardize related transactions, strengthening operations in accordance wit

15、h law. Deepening the information management to ensure full communication zero resistance. To constantly perfect ERP, and BFS+, and PI, and MIS, and SCM, information system based construction, full integration information system, achieved information resources shared; to expand Portal system applicat

16、ion of breadth and depth, play information system on enterprise of Assistant role; to perfect daily run maintenance operation of records, promote problem reasons analysis and system handover; to strengthening BFS+, and ERP, and SCM, technology application of training, improve employees application information system of capacity and level. Humanistic care to ensure zero. To strengthening Humanities care, continues to foster company wind clear, and gas are, and heart Shun of