船舶制造英语日常用语一百句

上传人:工**** 文档编号:492340265 上传时间:2023-06-09 格式:DOCX 页数:31 大小:34.11KB
返回 下载 相关 举报
船舶制造英语日常用语一百句_第1页
第1页 / 共31页
船舶制造英语日常用语一百句_第2页
第2页 / 共31页
船舶制造英语日常用语一百句_第3页
第3页 / 共31页
船舶制造英语日常用语一百句_第4页
第4页 / 共31页
船舶制造英语日常用语一百句_第5页
第5页 / 共31页
点击查看更多>>
资源描述

《船舶制造英语日常用语一百句》由会员分享,可在线阅读,更多相关《船舶制造英语日常用语一百句(31页珍藏版)》请在金锄头文库上搜索。

1、船舶制造英语日常用语一船体1You must weld and grind this area before painting.在油漆之前你必须把这个地方电焊修补、打磨好。2This weldingline should be gouged and welded again before tightnessinspection.这条焊缝在密性检查前要碳刨、再焊。3The structure of the starboard side is different from the port side.右舷的结构跟左舷的不一样。4We should reinforce the downside of

2、 the windlass.我们应该在锚机的反面加强。5The navigation deck is not plain,we will fair the deck by hot working.驾驶甲板不平,我们要火工校正。6There are two pieces of stiffeners and brackets must be replaced.有两块加强筋和肘板要换新。7Two more footrests and handgrips should be installed at the entrance of the small hatchcover.在小舱口盖的进口处再安装两只

3、踏步和拉手。8Checking the joint accuracy and structure integrity between No.8 and No.9 block after closed.No.8 与 No9 分段合拢后大接头装配精确性和结构完整性检查。9Checking structure integrity of superstructure(deckhouse)after welding.上层建筑焊后结构完整性检查。10Inspecting fitting accuracy of hatch coaming on board.货舱口围板船上安装精度检查。11Inspectio

4、nairpressure test(withwater head) forNo1.waterballasttank(No15 block).No1 压载水舱( No.15 分段)气压试验(压头试验)检查。12Inspection hosing test for upper deck.上甲板冲水试验检查。13 Measuring hull s main dimensions: length overall(LOA.),length perpendiculars(LPP.),breath molded(B.),depth molded(D.) andbetween deflectionbefore

5、 launching.下水前测量船体主尺度:总长、两柱间长、型宽、型深、基线挠度。14Inspection distance between draught marks and keel plate after markingout.划线后检查吃水标尺至平板龙骨之间的距离。15Inspecting fitting accuracy of draught mark(loading line mark).吃水标志(载重线标志)安装精确性检查。16Inspection welding seam and dimension of cargo hatch cover.货舱舱口盖焊缝和尺度检查。二轮机1I

6、nspectionmachiningdimensionofpropellershaft(intermediateshaft orcounter shaft).螺旋桨轴(中间轴)机加工尺寸检查。2Check for surface contact area(metallic contact) between stern shaft andpropeller hub tapers. 检查螺旋桨轴与螺旋桨锥度接触面。3Inspection machining dimension of rudder stock.舵杆机加工尺寸检查。4Inspection rudder carrier after as

7、sembly.上舵承组装后检查。5Inspection machining dimension of rudder pintle.舵销机加工尺寸检查。6Inspection alignment of stock, rudder blade and pintle.舵杆、舵叶、舵销连接后中心线检查。7Lowering test and tension test of anchor.锚投掷试验和拉力试验。8Measuring dimension of shaft coupling bolts and reamer hole.轴系连接螺栓和钻孔尺寸测量。9Inspection installation

8、 correctness of ship s name plate(funnel mark).船名牌(烟囱标志)安装正确性检查。10 Flexibility and hosing test for small water tight hatch cover(water tight door and window).水密小舱口盖(水密门、窗)启闭灵活性、冲水检查。11Tightness test(opening and closing test,emergency opening and closingtest)for cargo hatch cover.货舱舱口盖密性试验(启闭试验、应急启闭试

9、验)。12Inspecting anchor throwing away appliance.弃锚装置检查。13Inspecting centerline positioning for shaft system and rudder system beforeboring.轴、舵系镗孔前中心线定位检查。14Optical aligned check for shaft system after boring.轴系镗孔后光学校中检查。15Hydraulic test for L.O. pipe for stern tube.艉轴管滑油液压试验。16Measuring diameter of f

10、ore and aft stern tube bearing and bushes.艉轴管前、后轴承与衬套直径测量。17Inspection push-up load for fore and aft stern tube bushes.艉轴管前、后衬套压入检查。18Measuring clearance between propeller shaft & bearing.螺旋桨轴与轴承间隙测量。19Flushing L.O.system of stern tube.艉轴管滑油系统的投油清洗。20Inspecting zero(datum) position of rudder blade.舵

11、叶 0 位检查。21Measuring clearance of rudder jumping stopper.舵止跳块的间隙测量。22Inspecting integrity of steering gear.操舵装置完整性检查。23Measuring installation clearance of rudder bearing.舵轴承安装间隙测量。24Flushing of piping system for steering gear.舵机管路系统的投油清洗。25Mooring test of steering gear.舵机系泊试验。26Manoeuving test of ste

12、ering gear during sea trial.舵机航行中操舵试验。27Emergency manoeuving test of steering gear.舵机应急操舵试验。28Installation and alignment inspection of windlass.锚机安装与校中检查。29Anchoring and weighing test of windlass on sea trial.锚机航行中抛起锚试验。30 Adjusting safety device for hydraulic system of steering gear(windlass、 moori

13、ng winch).舵机(锚机、绞缆机)液压系统安全装置调整。31Running test and loading test for 4t provision crane.4 吨食物吊运转试验和吊重试验。32Lowering and hoisting test for life boat.救生艇收放试验。33Loading test of accommodation ladder(pilot ladder).舷梯(引水员梯)压重试验。34Checking liner of main engine(M.E.).主机垫片检查。35Tightening inspection for through bolts of main engine(M.E.).主机贯穿螺栓紧固度检查。36Aligning main engine s crank shaft and intermediate shaft after launching.下水后主机曲轴和中间轴连接后校中。37Aligning intermediate shaft and propeller shaft after launching.下水后中间轴和螺旋桨连接后校中。38Measuring deflection of crank shaft of M.E. before s

展开阅读全文
相关资源
相关搜索

当前位置:首页 > 外语文库 > 英语学习

电脑版 |金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号