x填砂路基试验段施工方案

上传人:壹****1 文档编号:487937630 上传时间:2024-01-29 格式:DOC 页数:14 大小:127.02KB
返回 下载 相关 举报
x填砂路基试验段施工方案_第1页
第1页 / 共14页
x填砂路基试验段施工方案_第2页
第2页 / 共14页
x填砂路基试验段施工方案_第3页
第3页 / 共14页
x填砂路基试验段施工方案_第4页
第4页 / 共14页
x填砂路基试验段施工方案_第5页
第5页 / 共14页
点击查看更多>>
资源描述

《x填砂路基试验段施工方案》由会员分享,可在线阅读,更多相关《x填砂路基试验段施工方案(14页珍藏版)》请在金锄头文库上搜索。

1、In order to ensure normal teaching order, protecting students healthy growth, ensuring that national (property) is not lost, to prevent or minimize the occurrence of safety accidents, follow the prevent, rescue each other, ensure safety and reduce losses principle, according to the local conditions,

2、 make the management system. 1, the principal is the responsibility of school safety, school security under the leadership of President security work leading group. The head teacher to the leadership team is responsible for, implementation of the accountability system. 2, school monthly student know

3、ledge about safety education, education should be diversified in the form every safety education for students of classes per week should be targeted. To carry on emergency issues dealing with education in General, self-help and mutual rescue knowledge. Emergency calls (such as 110, 119, 122, 120, an

4、d so on) use common sense in education. 3, the establishment of major accident reporting system. School students report major accident within an hour of education; student run and disappearances to report; report of the accident to a written report in triplicate, a correctional centre, a police stat

5、ion, a township peoples Government shall not conceal the accident. 4 week, teachers are on duty system, establish and improve the leadership values; strengthen the education, management of teaching activities in schools to ensure normal teaching order; responsible for school safety leadership always

6、 maintained close contact and district police stations, canvassing support from the police station on school safety and help. 5, strengthening teachers moral education, establish a dedicated love, improving education quality, observe the students psychological changes at any time and take preventive

7、 measures, no corporal punishment and covert corporal punishment on students, student out of the classroom, schools may not be. 6, units or departments use student Street propaganda or participate in the celebrations, as well as participating in other social work, without approval of the Correctiona

8、l Centre, school principals consent, without organization. Without the approval of relevant departments, may organize students to participate in fire fighting, disaster relief and so on. 7, schools should educate students to obey the school rules and regulations, on time, on time home to prevent acc

9、idents. 8, school to school inspections on a regular basis, found hidden in time, and in severe cases, it is hard to eliminate immediately closed, and reported to the local peoples Government, education, and rule of law section. 9, the school should always check the internal walls, retaining walls,

10、ponds, railings, handrails, doors, Windows, staircases and a variety of sports, extracurricular activities, facilities such as fire safety, infrastructure security, unsafe facility to immediately repair and demolition to ensure that teachers and students work, learn, live venues and facilities are s

11、afe and reliable. Song Lin Xiang Liu Jia ping elementary school March 2016 song Lin Xiang Liu Jia ping primary school fire safety systems to enhance fire safety, protection of public property and the life and property safety of teachers and students, school fire safety into day-to-day management, is

12、 developing the following fire safety system. 1, strengthen fire safety education of the whole school. According to the requirements of the Fire Services Act, so that everyone has of keeping fire control safety, protecting fire control facilities, fire prevention, reports of fire一、开展填砂路基试验段施工的目的1.1

13、填砂路基试验段的概况二工区拟开展进行试验段施工段落为:位于桩号K3+840-K4+040段,长200米,作为填砂路基的试验段(全断面填砂,编织袋装砂码边坡)。1.2 进行填砂路基试验段的目的1、通过路基试验段施工,摸索并总结出一套低洼农种区路基填砂施工合理的施工组织方案和机械设备配置方式。2、通过试验,摸索并总结低洼农种区路基床的排水、清表及填前碾压、回填及碾压、填料、填筑松铺厚度、碾压设备的碾压遍数等理想的工艺方法和设备配置。3、摸索并总结如何依据填砂路基技术规范、路基质量标准进行规范的程序管理方法和质量控制手段。4、通过本实验段施工,收集相关数据,指导全面的填砂路基施工并达到技术质量标准。

14、1.3 填砂路基试验段主要工程数量主要工程数量表序号主要工程项目单位数量1挖临时排水沟M4002清除表土M360003清表后回填砂M360004路基填筑砂M3280005编织袋人工装土码坡M31440说明:以上数量为估计数量,实际以监理工程师的确认为准。二、施工组织机构及总体安排2.1 试验段的管理和施工人员配备土方施工一队机料员胡留得质检员张玮安全员黎功文施工员徐结文工区经理:卢新平技术负责人:袁雪峰劳动力进场计划表工 种试验段K3+840-K4+040管理人员2技术员4机操手15普工15司机102.2 机械设备配置1、机械设备的配置详见下表。主要施工机械表机械名称规格型号厂牌及出厂时间数量

15、(台)新旧程度预计进场时间小计其中一工区二工区履带式推土机160,移山285轮胎式装载机ZL40:徐州185挖掘机220:现代180双驱振动压路机20T:三一180自卸汽车10平地机185污水泵15062.3 实验段施工计划时间本工程计划2012年4月20日开工,计划2012年5月10日完工,工期20天。2.4施工准备1、技术准备:A、实验室标准实验成果汇总表(包括填料的重型击实,CBR,塑、液限,含水量,颗粒分析等);B、测量全套资料另附表(采用导线点测量记录、导线点、水准点加密横断复测资料)。2、现场准备:A、实验段相应人员组织安排均已到位,实验段协调工作已做好;B、实验段施工机械配备已到位;C、已打通通往实验段的3#施工联络道,人员和机械设备可直接进场作业。三、施工方案3.1施工测量1、 测量所使用的测量仪器必须经过验定部门检定,有检定合格证。2、 测量人员施测前必须熟悉施工图纸。了解掌握业主提供的施工坐标标高、水准点、相对标高及绝对标高之间的关系。3、 采用全站仪和NA20型水准仪进行测量,确保施工误差符合规范要求。4、 测量人员