TS169492002版英文检查表(1)

上传人:cn****1 文档编号:487360246 上传时间:2023-07-27 格式:DOCX 页数:64 大小:74.66KB
返回 下载 相关 举报
TS169492002版英文检查表(1)_第1页
第1页 / 共64页
TS169492002版英文检查表(1)_第2页
第2页 / 共64页
TS169492002版英文检查表(1)_第3页
第3页 / 共64页
TS169492002版英文检查表(1)_第4页
第4页 / 共64页
TS169492002版英文检查表(1)_第5页
第5页 / 共64页
点击查看更多>>
资源描述

《TS169492002版英文检查表(1)》由会员分享,可在线阅读,更多相关《TS169492002版英文检查表(1)(64页珍藏版)》请在金锄头文库上搜索。

1、编号:时间:2021年x月x日书山有路勤为径,学海无涯苦作舟页码:第1页 共1页Quality System Assessment Check-ListChecklist to ISO/TS 16949:2002Last revision 09/10/ 2001Second Edition, Issued October, 2001Copyright 2001 DaimlerChrysler, Ford Motor Company, General Motors Corp., ANFIA, CCFA/FIEV, VDA, SMMT FOREWORD The Quality System Ass

2、essment Check-List to ISO/TS 16949 Second Edition is based on the content of ISO/TS 16949 and it is effective for the life of ISO/TS 16949, Second Edition.The Quality System Assessment Check-List is to be used as a guide in auditing the requirements of ISO/TS 16949, Second Edition. The requirements

3、column references the clauses in ISO/TS 16949. All italics are ISO 9001: 2000. The What to look for column is not mandatory but it is a good guide. It is expected that auditors will supplement this column with their educated and experienced enhancements.Acknowledgements for this effort are due to th

4、e IATF membership.ELEMENT 4 Quality management systemRequirementsWhat to look forAssessor notes / Objective evidence4.1 General Requirements4.1.1Has the organization established and documented a quality management system in accordance with the requirements of ISO/TS 16949:2002(E)?(4.1) Quality manua

5、l according to TS 16949 or one with a conversion matrix.4.1.2Has the organization implemented and maintained its established quality management system in accordance with the requirements of ISO/TS 16949:2002(E)?(4.1) Key personnel interview. Examples of effective implementation.4.1.3Is the organizat

6、ion continually improving the effectiveness of its quality management system in accordance with the requirements of ISO/TS 16949:2002(E)? (4.1.1.1) Examples and status of quality management system continuous improvement projects , not corrective actions. Management review results.4.1.4Does the organ

7、izations quality management system :a) identify the processes needed for the quality management system and their application throughout the organization?b) determine the sequence and interaction of these processes?c) determine criteria and methods needed to ensure that both the operation and control

8、 of these processes are effective?(4.1.a, b, c) Quality manual according to TS 16949 or one with a conversion matrix.4.1.7Does the organizations quality management system :a) ensure the availability of resources and information necessary to support the operation and monitoring of the processes neede

9、d for its quality management system?b) monitor, measure and analyze the processes needed for its quality management system?c) implement actions necessary to achieve planned results and continual improvement of the processes needed for its quality management system?(4.1.d, e, f) Review of all the ele

10、ments of the quality management system to insure its continuing suitability and effectiveness. Review of quality cost indicators Management review meeting minutes, attendance and adequate frequency. Action plans and follow-up.4.1.10Does the organization manage the processes needed for its quality ma

11、nagement system in accordance with the requirement of ISO/TS 16949:2002(E)?(4.1)4.1.11Does the organization ensure control over outsourced processes that affects product conformity with requirements?(4.1)4.1.12Is the control of the organizations outsourced processes that affects product conformity w

12、ith requirements identified within the quality management system?(4.1) Quality manual according to TS 16949 or one with a conversion matrix.ELEMENT 4.2 Documentation requirements4.2.1 General4.2.1Does the quality management system documentation include the following:a) documented statements of a qua

13、lity policy and quality objectives? b) a quality manual?c) documented procedures required by ISO/TS 16949:2002(E)?d) documents needed by the organization to ensure the effective planning, operation and control of its processes?e) records required by ISO/TS 16949:2002(E) (see element 4.2.4)?(4.2.1) Q

14、uality manual according to TS 16949 or one with a conversion matrix. Adequacy of the procedures to the complexity of the organization. Quality management system procedures. Quality records.4.2.2 Quality Manual4.2.2Has the organization established and maintained a quality manual that includes :a) the

15、 scope of the quality management system, including details of and justification for any exclusions (see section 1.2 of ISO/TS 16949:2002(E)?b) the documented procedures established for the quality management system, or reference to them?c) a description of the interaction between the processes of the quality management system? (4.2.2) Quality manual according to TS 16949 or one with a conversion matrix.4.2.3 Cont

展开阅读全文
相关资源
相关搜索

当前位置:首页 > 办公文档 > PPT模板库 > 总结/计划/报告

电脑版 |金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号