1、 India Amarkantak Power Plant Project Construction Engineering Rev:0PROJECTLANCO AMARKANTAK THERMAL POWER STATION 2300 MW UNIT # 1PATHADI VILLAGE, KORBA - 495667. CHHATTISGARH - INDIAOWNERLANCO AMARKANTAK POWER PRIVATE LIMITEDHYDERABAD - INDIAPRINCIPAL CONTRACTORZELAN PROJECTS PRIVATE LIMITEDDocumen

2、t No. : Rev : 0 Document Title : India Amarkantak Power Plant Project Construction EngineeringDateRevisionPrepared by Reviewed by Released by Contents1. Basis of Preparation and Explanation31.1Basis of preparation31.2 Explanation of the preparation42. Description of the project42.1 the scale of the

3、project42.2 project information42.3 the main equipments52.4 Required construction time limit113Organization mechanism and its duty123.1 Organization mechanisms123.2 Management duty124Management of the project schedule154.1 Management process of progress plan155.Technical management in construction18

4、5.1 organization of technical management in construction185.2 construction management185.3 technology management215.4 management of technical documents256. Management of Quality in Project286.1 Quality Target286.2 Quality checking units296.3 Quality management measures296.4 Quality Checking Project

5、and Procedures326.4.1 Quality checking works326.4.2 Quality checking procedures326.5 Plan of Supervision and Inspection for Quality of Turbine Project347. Steam turbine engineering safety management417.1 Safety management method417.2 Safety facilities417.3 Safety measures427.3.1 Site transportation4

6、37.3.2 Hoist and transportation437.3.3 Special seasons measures437.4 Civil construction447.5 Environment protection458. Manpower resource and machinery and tools allocation plan468.1 Manpower resource plan468.2 Training469. Finished product protection479.1 Equipment, material storage and stack479.2

7、The protection in installation4710. Main construction scheme and technical measures of the steam turbine4810.1 Check and repair of equipment before erection4810.2 Erection of the steam turbine body5110.3 Construction scheme and measures of generator5810.4 The main machine oil circulation scheme and

8、measures6710.5 High pressure installation technology measures6910.6 Turbine auxiliary equipment and machinery installation measures7011Appendix: Main Construction Scheme and Work Instruction List7311.1 Construction Scheme7311.2 Work Instruction741. Basis of Preparation and Explanation Thermal power

9、plant project of india 1200MW LANCO AMARKANTAK takes Zeland Project PVT LTD as general contractor and DONGFANF ELECTRIC CORPORATION the sub-contractors of the equipments. For construction, civil work and installation is taken charge of by construction sub-contractor, DEC take charge of supervision a

10、nd necessary technical instruction on construction. It aims at assuring quality of the project and completing the construction tasks provided in the contract of the project safely and orderly on time with high-efficiency to prepare construction engineering, which can be provided to DEC for reference

11、 of organizing construction. According to the contract of the LANCO AMARKANTAK THERMAL POWER STATION 2300 MW UNIT # 1 thermal power plant and the construction technology and many-year supervision experience of our company, we prepare this construction engineering as one of the documents of installat

12、ion, supervision and technology instruction of erection plant project. 1.1 Basis of preparation1.1.1 The contract of the India LANCO AMARKANTAK thermal power plant 1.1.2 “Technical Specification of Construction & Acceptance of Electric Power Construction” (For turbine, boler,electric ,I&C, pipe, wel

13、ding and chemistry of power plant) of electric power industry standard of P. R.C. 1.1.3 “Quality Inspection & Appraisal Standard of Thermal Power Construction” (For For turbine, boler,electric ,I&C, pipe, welding and chemistry of power plant chemistry of power plant ) of electric power industry stan

14、dard of P. R.C.1.1.4 “Safety Work Rule of Electric Power Construction” of electric power industry standard of P. R.C.1.1.5 Design drawings and technical instruction by Huadong Electric Power Design Institute of P. R. C. 1.1.6 Design drawings and technical instructions by all manufacturers of P. R. C

15、.1.2 Explanation of the preparationIt aims at assuring quality of the project and completing the construction tasks provided in the contract of the project safely and orderly on time with high-efficiency to prepare construction engineering.This construction engineering is prepared based on the existing documents and will be perfected further according to the revised deign drawin