1、本科毕业设计(论文)中英文对照翻译院(系部) 专业名称 年级班级 学生姓名 指导老师 英文文献Second substation equipment over-voltage protection on electronic information system for the protection of core equipment for the construction of a protected both pressure and other potential system, and through all levels of over-voltage surge protecto
2、rs of the current step by step into the land , Substation secondary safety equipment and reliable operation.1 second over-voltage substation protection In recent years, the substation communications, communications systems, protection systems, background management module frequent over-voltage damag
3、e, the main reason for this is weak and its related systems products over-voltage protection level is weak, or no guard against over-voltage Technical measures, the consequences for the safe operation of power grids bring about a greater negative impact. With integrated automation systems and automa
4、tion systems such as communication systems in the substation weak secondary by the wider use of such electronic systems (equipment) components of the integrated more and more, the growing volume of information storage, speed and accuracy of the Increased and operates only a few volts, current inform
5、ation only microamp level, thus extremely sensitive to outside interference, especially the lightning and electromagnetic pulse, such as over-voltage tolerance is low. When thunder and lightning, such as over-voltage and accompanied by the electromagnetic fields reach a certain threshold, ranging fr
6、om system failure caused, resulted in heavy equipment or permanent damage to its components. Despite the thunder and lightning viewpoint of electronic systems (equipment) is unlikely, but lightning strike near the land, buildings, communication and air supply line directly Leiyun discharge form, or
7、because of electrostatic induction and the impact of electromagnetic induction formation of over-voltage, There might be connected to the power lines, signal lines or grounding system, through various interfaces to transfer, coupling, radiation and other forms of invasive electronic system (equipmen
8、t) and lead to serious disturbances or incidents. Therefore, strengthening and improving the electronic system (equipment) protection, to minimize the impact of interference by lightning and other damage caused direct losses and indirect losses, has become the urgent need to solve the problem.2 over
9、-voltage protection design IEC (International Electrotechnical Commission) TC/81 mine technical committee will be divided into internal and external mine mine in two parts, the external mine is lightning rod (or with lightning, lightning network), Yin Xiaxian and grounding system, Objects to be prot
10、ected from direct lightning strikes, mine is to prevent internal lightning and other internal over-voltage damage caused by invasive equipment. A comprehensive mine and over-voltage protection systems must be integrated use of discharge (segregation), both pressure (and other potential), shielding (
11、isolation), grounded, limit pressure (clamp) protection, and other technology, in accordance with the external mine And the principle of internal mine, in accordance with the targets of protective features, flexible application to take concrete measures, constitute a complete protection system. Over
12、-voltage substation in the form are: Lightning over-voltage, the resonant frequency over-voltage and over-voltage, over-voltage operation, these over-voltage transmission or electromagnetic induction to the way the lines and equipment on a dangerous over-voltage, in particular, Lightning over-voltag
13、e, lightning substation, in the low-voltage power supply system and weak system to produce a strong over-voltage sensor, while the substation to potential rise (for example: the substation grounding resistance to 1 Q, lightning current 10 kA, while the potential for 10 kV), due to the increased pote
14、ntial of the counter lines and equipment damaged lines and equipment and the events have occurred, therefore, despite the substation outside the mine system (lightning rod. Yin Xiaxian And grounding devices) in line with national standards and the requirements of Buban, and the integrated automation
15、 and communications automation systems, such as weak secondary have been taken, such as shielding, grounding, isolation, filtering, and other measures, but it can not completely avoid over-voltage powerful lightning And voltage of the system counter the disruption caused damage and, therefore, the s
16、econd weak system substation and a mine-voltage must also take the appropriate protective measures, in accordance with the IEC within the mine area EMP, the devices power cord, signal Lines, data lines, and the installation of lightning protection and internal over-voltage devices to prevent lightning sensors, channeling people along the lightning current, voltage counterattac