造价员继续教育考试答案CostClerkcontinuingeducationexaminationanswer

上传人:m**** 文档编号:472692047 上传时间:2023-06-01 格式:DOC 页数:25 大小:64KB
返回 下载 相关 举报
造价员继续教育考试答案CostClerkcontinuingeducationexaminationanswer_第1页
第1页 / 共25页
造价员继续教育考试答案CostClerkcontinuingeducationexaminationanswer_第2页
第2页 / 共25页
造价员继续教育考试答案CostClerkcontinuingeducationexaminationanswer_第3页
第3页 / 共25页
造价员继续教育考试答案CostClerkcontinuingeducationexaminationanswer_第4页
第4页 / 共25页
造价员继续教育考试答案CostClerkcontinuingeducationexaminationanswer_第5页
第5页 / 共25页
点击查看更多>>
资源描述

《造价员继续教育考试答案CostClerkcontinuingeducationexaminationanswer》由会员分享,可在线阅读,更多相关《造价员继续教育考试答案CostClerkcontinuingeducationexaminationanswer(25页珍藏版)》请在金锄头文库上搜索。

1、造价员继续教育考试4+答案(Cost Clerk continuing education examination 4+ answer)Examination questions on network continuing education examination for cost employees in 2011 (Tu Jian)Tip: length of examination (50 minutes) remaining time (0 hours, 48 minutes, 10 seconds): please do not close the window and refre

2、sh the page during the exam! (the system automatically saves the answer every 10 minutes)Radio question (40), 1 points for each question, 40 points(1) on the block surface layer wall engineering calculation, the following statement is not true ().A: according to the figure size, with the calculation

3、 of solid area, B: does not deduct the area within the hole of 0.1m2C: does not deduct the area of the hole within 0.3m2, and the D: pile and the wall column are merged into the wall calculation(2) according to the calculation of steel window ().A: window and window frame peripheral area B: areaC: p

4、eripheral area of D: frame window(3) in the ration, the thickness of the binding layer of marble on the ground dry mortar is ().A:1cm B:2cmC:3cm D:4cm(4) plane balcony railing plastering, () calculation.A: distinguish between internal and external walls, incorporate the corresponding wall engineerin

5、g volume calculation. B: according to internal and external wall wall plastering corresponding quota project, artificial multiplied coefficient 1.2, other unchanged.C: the vertical projection area multiplied by factor 2.2 is calculated in square meters. D: executed by wall piecemeal projects.(5) pre

6、ss plastic window to press () computation.A: frame perimeter area B: aperture areaC: D: Tang fan peripheral area(6) the excavation bottom area (Earthworks)A:S M2 B:S, 20m2 = 20C:S 30 M2 D:S 0.6D: = 0.6, C: 0.6(13) the precast concrete component is stipulated in the construction project valuation rat

7、ion.A: according to the quota project calculation, B: may participate in the photography, the project computationC: can be calculated according to the contract price or market price, and D: shall prepare a one-time quota(14) as regards vertical transportation, the following statement is incorrect.A:

8、 eaves height 3.6m within the building without the calculation of vertical transportation machinery. B: when highlighting the roof of the building room construction area is larger than the standard floor area of 50% (including water and building room connected rooms, elevator), can calculate the hei

9、ght of.C: cast-in-place reinforced concrete structure is suitable for vertical transportation projects except short pier shear wall structure and all cast-in-place reinforced concrete structure project. D: reinforced concrete silo with concrete.(15) external wall of extruded plate, benzene plate doe

10、s not accord with the engineering quantity calculation rules (is).According to the design of A: icon size to square meters according to the design calculation of B: icon size to calculate cubic metersC: should be deducted from the door and window opening area D: window side wall is calculated separa

11、tely(16) construction budget quota by a backhoe to dig soil at the bottom of the slope engineering calculation coefficient ().A:0.15 B:0.29C:0.3mm D:0.5mm(17) calculation of engineering quantity should be increased (brick).A: three bricks above the waist top line B:C: sets of doors and windows D: window to turn head(18) concrete slab column (high).A: must B: layered calculation engineeri

展开阅读全文