资源描述

《dw随州市炎帝神农故里风景区烈山湖水库初步设计阶段工程地质勘察报告》由会员分享,可在线阅读,更多相关《dw随州市炎帝神农故里风景区烈山湖水库初步设计阶段工程地质勘察报告(26页珍藏版)》请在金锄头文库上搜索。

1、Gay is now a provincial key construction project of aluminum Ltd-province with an annual output of 50,000 tons of technical innovation project of environmental protection and energy saving of electrolytic aluminum project manager. In this technological transformation projects, he has overall respons

2、ibility for the day-to-day affairs of the project. In order to ensure that southern companys control the scale of investment, strengthen field management, pay special attention to project progress, and ensure a successful operation, the overall goal. He and Engineering Department under the leadershi

3、p of all the staff in the companys technical command, on the difficulties and to overcome technical difficulties in the process, work hard, have made outstanding achievements, mainly reflected in the following aspects: first, careful organization and management achieved remarkable results. Technical

4、 innovation project of the year, started and completed a series of bids and completed to date, from production engineering to put into production after nearly a year, has achieved very significant results. A project first 56 slots from dismantling the old slot just 168 days, civil engineering, insta

5、llation, commissioning, guarantee engineering quality under the premise, on the production side transformation under difficult conditions, created the national industrys fastest speeds. II 32 large prebaked electrolytic cell on November 7 has been installed, marks has an annual production capacity o

6、f 50,000 tons of electrolytic aluminum production capacity of aluminum. Entire project almost 8 months earlier than planned, achieved the goal of production transformation benefits that year, created favorable conditions for aluminum through South. Second, effectively control the investment. Project

7、 is subject to a scientific approach to bidding, bidding to make savings of 20 million Yuan, in the implementation process of the project, every domestic prices of steel, cement and other building materials, the old buildings on the base encountered great difficulties in dealing with significant inc

8、rease in the volume of civil engineering, but through rationalization and optimization, project control in fixed investment of 350 million Yuan. Third, environmental energy-saving effect of the project. Project investment of nearly 30 million Yuan, using large prebake technology and aluminum oxide d

9、ense phase and hyper dense phase conveying technology, fluoride and other harmful gases purification efficiency of up to 98%. Compared with Soderberg cell before the modification, power consumption can be reduced by 1500 tons of electrolytic aluminum, and project environmental protection and energy

10、saving effect is obvious. Four are in a relatively short period of time to the normal production. After four months of efforts, a project has put into operation all the 54 240KA large cell into regular production, stable current channel conditions and all the economic indicators are good, current ef

11、ficiency in October had reached 93%, is close to and reach the domestic advanced level. In the case of production half of the cell, this effect can be achieved and better level in the industry. 50,000 tons of electrolytic modification process, from preliminary study to equipment selection, cost cont

12、rol, project progress, quality control and coordination among the various sub-projects and various professional, technical command under the correct leadership, both from an overall perspective, emphasis on integrity, and earnestly implement the relevant laws and regulations, strictly act according

13、to the contract. He tried to learn relevant knowledge, good style of business, operational and organizational coordination ability, project efficiency, quality and safety assurance system in place, with all units involved with the coordination and good .随州市炎帝神农故里风景区烈山湖水库初步设计阶段工程地质勘察报告随州市炎帝神农故里风景区烈山湖

14、水库初步设计阶段工程地质勘察报告1.前言1.1工程概况拟建烈山湖水库位于湖北省随州市曾都区炎帝神农故里风景区方家湾村,水库拦截府河上游氵厥 水三道河支流,距厉山镇约1.5km,距随州市约20km(见图1.1.1:烈山湖水库交通位置及流域水系图)。拟建烈山湖水库为一座小(二)型水库,水库由大坝、输水涵洞等组成,根据国家防洪标准(GB50201-94)和水利水电工程等级划分及洪水标准(SL252-2000),烈山湖水库工程等别为等工程,主要建筑物为级。水库承雨面积1.3Km2,多年平均降水量973mm,多年平均径流量44.85万m3。总库容50.0万m3,调洪库容6.22万m3,兴利库容11.83

15、万m3,死库容31.95万m3。水库正常蓄水位94.60m(黄海高程系统),设计洪水位94.65m,校核洪水位95.14m,死水位93.50m。水库设计防洪标准为20年一遇洪水设计,200年一遇洪水校核。水库大坝拟采用粘土心墙坝,坝顶长度222m,宽度6.0m,最大坝高13.1m,坝顶高程96.5m。输水涵洞位于大坝右侧,全长55m,为1.6m1.6m钢筋砼方涵,进口底部高程87.0m,出口高程86.45m,纵坡比1:100。在已选定水库坝址的情况下,襄樊地质工程勘察院(以下简称我院)受随州市炎帝神农故里风景区管理委员会的委托,对拟建烈山湖交通位置及流域水系图 图1.1.1水库的库区、坝址区进

16、行初步设计阶段的工程地质勘察工作。根据水电枢纽工程等级划分及设计安全标准(DL5180-2003),此工程安全等级为四级。1.2勘察目的与任务我院针对工程的重要性和勘察工作的特殊性,及时组织成立了勘察工作项目组,并依据设计文件和我院现行质量管理体系文件(ISO9001)及相关标准、规程、规范,编制了详细可行的勘察方案,对勘察工作提出了具体的任务和技术要求。依据随州市水利水电建筑设计院提供的水库勘探点平面布置图,我院在收集、整理前人工作成果的基础上,通过现场调查、勘察、测绘,取得了详细的试验数据资料,经室内分析、综合整理,提交此次工程地质勘察报告。本次勘察目的是查明拟建水库区、坝址区的工程地质条件,为选定的坝址坝线、枢纽布置及地基处理方案进行地质论证,为建(构)筑物设计提供地质资料。其主要任务是:1.2.1开展工程地质测绘,对区域地质构造作出必要