国家大剧院施工组织设计

上传人:ni****g 文档编号:431196581 上传时间:2022-09-12 格式:DOC 页数:363 大小:4.66MB
返回 下载 相关 举报
国家大剧院施工组织设计_第1页
第1页 / 共363页
国家大剧院施工组织设计_第2页
第2页 / 共363页
国家大剧院施工组织设计_第3页
第3页 / 共363页
国家大剧院施工组织设计_第4页
第4页 / 共363页
国家大剧院施工组织设计_第5页
第5页 / 共363页
点击查看更多>>
资源描述

《国家大剧院施工组织设计》由会员分享,可在线阅读,更多相关《国家大剧院施工组织设计(363页珍藏版)》请在金锄头文库上搜索。

1、videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the five water treatment 357 timetables for three years to resolve outstanding issues, obviously worked, victory of the year. The Countys departments at all levels must firmly establish the guanghui is gold

2、and silver green development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well five water treatment of winning the war, ever-higher levels of comprehensive well-off society was built. (A)

3、 lay the sewage uphill battle. This year we will river water quality improved at the county level, up to five this basic objective grasp of pollution control that focus, with the focus on three things: a good job, clear rivers reaching the County created. Organization look back special inspection, t

4、he County garbage River, black and odorous River is Dragnet investigation, timely rectification of problems found in place firmly to prevent river pollution rebound. In accordance with the one-stop strategy, improving the inferior five water quality monitoring stations work this year to ensure the E

5、limination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of clear rivers standards. Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water

6、source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve effluent from sewage treatment rate, running accuracy, compliance requirement, speed up the towns support network construction, is focusing on nanotubes home last meters question. Do

7、mestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to ensure the realization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural dom

8、estic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play, avoid the Sun problem. Third, pay special attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to dig up mud

9、, as the deepening water of this years plays. Next, to jump-start an investigation line touches work, implementation plan according to the priorities and the programme of work, in accordance with the one river one policy requires detailed cleaning, dredging plan, planning ahead of time cleaning out

10、mud way out, according to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primarily the source of backward production capacity, increase the intens

11、ity of第一章 施工总体进度计划及保障措施第一节 第一节 工程概况 国家大剧院工程位于北京市西城区石碑胡同4号,总建筑面积约为155,000m2,由中心建筑(202区)、北侧建筑(201区)和南侧建筑(203区)三部分组成。其中,中心建筑为长轴216.57m, 短轴145.57m的椭球体建筑, 内设公众大厅、歌剧院、音乐厅、戏剧院和小剧场, 球体四周水池环绕;北侧建筑为地下两层, 楼面标高分别为-7.00m和-11.50m,包括主票务大厅、停车场、入口通道等; 南侧建筑为地下三层, 楼面标高分别为-7.00m、-11.50m和-18.00m,包括南侧票务大厅、消防车辆入口、装卸货物区和其它

12、配套用房等。 设计标高0.00初定为绝对标高46.00m,椭球壳体顶部标高为+46.28m。建筑物最深处为歌剧院台仓,其室内地坪标高为-41.00m,中心建筑物室内地坪最底标高分别为-28.60m和-22.00m。 该工程结构分为两个单元体系,建筑外立面为椭球钢结构壳体,径向为弧形、变截面、无翼缘、6cm厚钢板焊接形成的钢结构主构架;环向横构件采用直径194mm、厚度5mm的钢管,通过特殊球节点与径向钢结构主构架连接。钢结构总重量约5,000吨,每榀钢构架平均重达40吨左右。椭球表面采用钛合金板装饰,南北侧中部安装玻璃幕墙。椭球内部主体结构采用钢筋混凝土框架剪力墙结构体系,分别在0.00m和-

13、7.00m设结构缝,从-7.00m以下是一个结构单元,-7.00m以上是三个结构单元。部分主要梁柱采用钢-混凝土组合结构体系, 椭球壳体底座环梁、舞台口及局部大跨度构件采用预应力钢筋混凝土结构,南北建筑结构、水池结构与中心建筑主体结构是分开的,沿着主体结构的外皮设一道沉降缝。第二节 工程施工重点 国家大剧院工程量巨大,工期紧迫。根据招标文件的要求,该工程计划2000年4月1日开工,2002年8月31日外立面亮相,室外水池蓄水,全部绿化工程完工,室内外主要通道畅通,音乐厅基本具备使用条件,此阶段目标工期为29个月;2003年2月28日全部招标工程基本竣工并交付使用,总的目标工期为35个月。在上述

14、时间内必须完成以下庞大的工程量:土方工程:约127万m3;护坡工程:约3.2万m2;降水工程:范围40,000m2左右;深度达-43m;钢结构工程:约5,000吨;椭球钛合金装饰板及玻璃幕墙工程,约35,000 m2;钢筋混凝土工程:约22万m3;总建筑面积约155,000m2的室内装饰工程; 从工程实施的角度分析,该工程的技术难度之大,工期之紧为国内外工程所罕见。其施工重点包括以下几个方面:一、降水工程 该工程场区位于永定河洪冲积扇中部,地层土质以粘性土、粉土与砂、卵石交互层为主,并存在多个洪积物沉积旋回,历史上曾有2条湮废的古河道贯穿场区。从地面往下约10m的范围为滞水层,1018m为潜水

15、层,20m以下分布着含水层岩性为砂卵石的两层承压水,其渗透性强,连通性好。两层承压水之间分布有一层57m的粉质粘土、粘质粉土和粘土层, 分布在-41-47的深度范围内,承压水头为26.7m。根据北京勘察设计院招标答疑介绍,地下水的渗透系数为200300m/day。由于基坑深达40多米,在北京城市建设史上还从未有过,地下含水量大且存在广大的水量补给源,再加上土层渗透性强、连通性好,并存在较大的承压水头,降水工程的重要性十分突出。降水工程的重点内容为:1、 1、 整个降水工程要确保人民大会堂、天安门广场和南北地铁以及周边建筑物不能受降水的影响而产生沉降和发生建筑物安全隐患;2、 2、 降水工程必须

16、与土方工程和护坡工程一体化考虑和安排,大面积和大体量的地下水必须在短期内降至工程施工作业面以下,因此要保证降水工程的科学可行性和可靠性;3、 3、 整个降水过程必须保证大剧院工程施工期间结构的安全以及浮托力对结构的顶托;4、 4、 降水工程要保证结构工程和防水工程施工的顺利进行,做到万无一失。5、 5、 降水工程要确保台仓底部在施工过程中决不能被第二层承压水顶穿。6、 6、 降水工程要完全符合北京市环保要求及地下水资源的要求。7、 7、 降水工程要充分考虑必要的经济合理性等。二、护坡工程由于基坑深,面积大,基坑标高变化多,地层分布中包括房渣土、粘质粉土、粉质粘土,砂卵石层,卵石直径在20mm以上的占卵石层的比例在5095%,再

展开阅读全文
相关资源
相关搜索

当前位置:首页 > 高等教育 > 其它相关文档

电脑版 |金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号