总部工作控制号: 审图工作控制号: 检验单位工作控制号:HQ Job No: Plan Approval No: Branch Job No: Form:RWPNB701-A中 国 船 级 社CHINA CLASSIFICATION SOCIETY建 造 入 级 船 舶 审 图 / 检 验 申 请APPLICATION FOR NEWBUILDING SHIP'S SERVICES兹申请中国船级社对下述船舶进行We hereby apply China Classification Society to carry out the following services for the vessel mentioned below: 船级图纸审批Plan Approval for Classification建造中入级检验Classification Survey during Construction法定图纸审批Plan Approval for Statutory Requirements建造中法定检验Statutory Survey during Construction建造厂/Builder联系人//Contact/Tel No/Fax No设计单位/Designer联系人//Contact/Tel No/Fax No预期船东/船舶营运人Prospective Owner/Operator船旗Flag船籍港Port of Register船型Type of Ship船长Length(Overall)船(两柱间)长Length(B.P.).型宽Breadth(Mld.)设计吃水Draft designed型深Depth(Mld.)1969总吨位(预估)/1969 Gross tonnage(Approx.)载重吨Deadweight载运集装箱量(TEU)/Capacity of carrying containers (TEU)载客量/Capacity of carrying passengers船舶航区/专用航线Service Area/Special Route冰区加强Ice Class申请授予的船级符号和附加标志Class Characters and Class Notations:★ CSA ★ CSM船舶或系列船舶A(单一建造合同、没有选择权船舶)Ship or series ships(a single contract without optional ship)船名/船舶编号Ship Name/Hull No.合同中其余船舶的船舶编号Hull No. of the other ships in the same contract建造合同签署日期Date of contractfor construction船舶或系列船舶B(具有选择权船舶的单一建造合同)Ship or series ships(a single contract with optional ships)船名/船舶编号Ship Name/Hull No. 合同签署生效的其他船舶编号Hull No. of the other ships in the same contract建造合同签署日期Date of contractfor construction “选择权”船舶C(单一建造合同的选择权船舶)Optional ships(optional ships signed in a single contract)船名/船舶编号Ship Name/Hull No.合同中其余“选择权”船舶的船舶编号Hull No. of the other optional ships in the same contract选择权生效日期Date on which the option is exercised 建造计划/Construction Schedule:图纸送审Dwg. submitting开工Steel cutting安放龙骨Keel Laying下水Launching交船/DeliveryCCS 项目标识号/CCS Project ID No船舶登记号/Class No(1) 建造合同日期定义Definition of date of “Contract for Construction “ as per IACS PR 29 (Rev.2):The date of “Contract for Construction “of a vessel is the date on which the contract to build the vessel is signed between prospective owner and the shipbuilder. This date and construction numbers (i e Hull Numbers) of all vessels include the contract are to be declared to the classification by the party applying assignment of class for a new building. 建造合同日期是由预期的船东和船厂之间签署一艘船舶的建造合同日期。
其合同(涉及所有船舶)日期和船舶建造工程号(如船厂编号)应由申请建造入级的申请方向入级船级社提出书面声明2)系列姐妹船(a series of sister vessels):“a series of sister vessels” is a series of vessels built to the same approved plans for classification purpose, under a single contract for construction.系列姐妹船是在一个单一合同中标明的按照相同批准图纸建造的船舶3)选择权船舶(Optional ships):Optional ships will be considered part of same series of sister vessels if the option is exercised not later than 1 year after the contract to build the series was signed.选择权船舶将被认为属于系列姐妹船的一部分,条件是其选择权在系列船舶合同签署之后1年之内生效。
4)填写说明(Instruction for filling):a. 如果签署一个建造合同包括实际船舶艘数,没有选择权船舶,填写A项 A single contract for construction is signed without any optional vessels, write in item A.b. 如果签署一个建造合同包括实际船舶艘数和选择权船舶,如5+5,则填写B项(前5艘船舶) A single contract for construction is signed with optional vessels, i.e. 5+5 vessels, first 5 vessels to be writed in item B.c. 上述合同中说明的选择权船舶且在1年中生效,如+5船舶则填写B+C项 Optional vessels exercised within 1 year after the single contract for construction a series of sister vessels i.e. +5 vessels, write in item B+C.d. 申请方填写建造入级申请并签署、盖章,认为属于(1)的书面声明。
Application for New Building Ship’s Service with signature and seal by applicant is regard as declaration from applicant as mentioned in (1) e. 对图纸审批,本申请适用于系列姐妹船;对建造检验,本申请适用于1艘建造入级船舶 For plan approval, this application applies to a series of sister vessels; for survey during construction, this application applies to only 1 vessel.本船舶设计应满足下述现行有效的规范、规则和公约:(下表内容可自行增加)The vessel(s) is(are) designed in compliance with the current Rules, Regulations and Conventions applicable to the vessel(s) as follows:(Additional items to be added if necessary)1CCS 2001钢质海船入级与建造规范The rules and regulations for the construction and classification of sea-going steel ships 2001, CCS及其and its1.12002修改通报2002 Amendments1.22003修改通报2003 Amendments1.32004修改通报2004 Amendments1.42005修改通报2005 Amendments1.5钢质海船入级规范(2006)The rules and regulations for classification of sea-going steel ships 20062CCS 1998材料与焊接规范The rules and regulations for materials and welding 1998,CCS 及其and its2.12001修改通报2001 Amendments2.22003修改通报2003 Amendments2.32004修改通报2004 Amendments2.4材料与焊接规范(2006)The rules and regulations for materials and welding 20063CCS 2001船舶与海上设施起重设备规范The rules for liftin。