大学英语CET6阅读练习题压轴预测

上传人:亦*** 文档编号:239089731 上传时间:2022-01-13 格式:DOC 页数:3 大小:17KB
返回 下载 相关 举报
大学英语CET6阅读练习题压轴预测_第1页
第1页 / 共3页
大学英语CET6阅读练习题压轴预测_第2页
第2页 / 共3页
大学英语CET6阅读练习题压轴预测_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

《大学英语CET6阅读练习题压轴预测》由会员分享,可在线阅读,更多相关《大学英语CET6阅读练习题压轴预测(3页珍藏版)》请在金锄头文库上搜索。

1、大学英语CET6阅读练习题压轴预测 Where there is life, there is hope.以下是为大家搜索的大学英语CET6阅读练习题压轴预测,希望能给大家带来帮助!更多精彩内容请及时关注我们! In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System bu

2、ilding can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixe

3、d length, usually ten centimeters. This is called a modular (标准件的) system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be pleted in four months. There are several new

4、 methods of system building. One is the panel method. In this case, the construction pany sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the pa

5、nels when they are being made. The moulds for making these castings are situated all around the building. After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together

6、 at their joints and the floor covering is laid. After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, f

7、ollow behind to plete the work. In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them int

8、o position. In the future, this method may bee more widespread. 1. The main difference between panel method and the method discussed in the last paragraph is. A. the latter uses ready-made internal features B. panels are cast in a level position C. the former is used to build walls and floors while

9、the latter to construct bathrooms or bedrooms D. the former is more expensive than the latter 2. Which of these statements is TRUE of system building? A. It employs more men. B. It is difficult and dangerous. C. It can save both time and money. D. It means less mechanization. 3. Aording to the passa

10、ge, the principle of system building is that. A. construction methods are safer B. buildings are made from a set of standardized units C. similar buildings can be produced D. all units are produced on the site 4. The usual fixed length in the modular system is. A. twenty centimeters B. ten millimeters C. fifty centimeters D. ten centimeters 5. What lifts the concrete panels onto the building? A. Cranes. B. Man-power. C. Pulleys. D. Hydraulic jacks.

展开阅读全文
相关资源
正为您匹配相似的精品文档
相关搜索

最新文档


当前位置:首页 > 中学教育 > 其它中学文档

电脑版 |金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号