世界银行招标文件英文版.doc

上传人:F****n 文档编号:95748184 上传时间:2019-08-22 格式:DOC 页数:242 大小:1.61MB
返回 下载 相关 举报
世界银行招标文件英文版.doc_第1页
第1页 / 共242页
世界银行招标文件英文版.doc_第2页
第2页 / 共242页
世界银行招标文件英文版.doc_第3页
第3页 / 共242页
世界银行招标文件英文版.doc_第4页
第4页 / 共242页
世界银行招标文件英文版.doc_第5页
第5页 / 共242页
点击查看更多>>
资源描述

《世界银行招标文件英文版.doc》由会员分享,可在线阅读,更多相关《世界银行招标文件英文版.doc(242页珍藏版)》请在金锄头文库上搜索。

1、3STANDARD BIDDING DOCUMENTSProcurement of WorksThe World BankWashington, D.C.Revised March 2002 and March 2003Principal Amendments to SBD Procurement of Works, January 1995 EditionFollowing publication of the SBD Procurement of Works, January 1995, a number of amendments were made through four corri

2、gendaJune 23, 1995; June 7, 1996; September 10, 1996; and October 20, 1999. In addition, several editorial corrections and further amendments relating to the introduction of the Euro, briefing of unsuccessful bidders, corrections of bid and performance securities, and updating of the Postqualificati

3、on and Disputes Settlement sections have been made. All of these amendments have been incorporated in this new May 2000 edition. The following list accounts for the principal amendments: Clauses dealing with corrupt and fraudulent practices are added (ITB 3.1 d, 20.4, 39.2; COPA 26.2, 63.5, Form of

4、Bid) The submission of an alternative Letter of Intent to execute a Joint Venture Agreement has been introduced (ITB 5.2 f) The eligibility for applying a 7 percent margin of preference in bid evaluation is restricted to domestic individual firms and joint ventures of domestic firms (ITB 5.4, 32) Th

5、e “one bid per bidder” revised clause clarifies the participation of a subcontractor in any bid (ITB 6) Clauses dealing with currencies of bid and payments allow for the use of the euro (ITB 15.2, 30; COPA 72.2) The bid validity period starts from the deadline for bid submission instead of from bid

6、opening (ITB 16.1) The requirements for bid security are modified to include bid bonds (ITB 17.2; Form of Bid Bond) The Employer notifies the name of the successful bidder to other bidders (ITB 35.3) A clause for debriefing by the Employer has been included (ITB 35.4) The disputes settlement clauses

7、, including the disputes review methods have been simplified (ITB 38; COPA 67) The certificates and payment clause is revised to allow the Contractor a timely suspension of the Works and provides shorter times for outstanding payment certificates, in the event of suspension of Bank-financing (COPA 6

8、0.8, 69.4, 69.6) A new arbitration sub-clause is provided, including rules of procedure from among well-recognized institutions for foreign bidders (COPA 67.3.2) The form for the Performance Bank Guarantee (Conditional) is corrected to ensure consistency with COPA 10.2 (annex A, Form: Alternative 2)

9、 A footnote to the Performance Bond form clarifies the use of bonds and allows for the use of other forms of bonds (annex A, Form: Alternative 3) Section XII, Postqualification, is substantially revised in light of the Standard Prequalification Document: Procurement of Works, September 1999 (revised

10、 March 2000) Section XIII, Disputes Settlement Procedures, has been revised and excludes the procedure for settling disputes through an “independent” Engineer编制的指导思想是以工程的“质量、进度、安全”为核心,在组织机构、施工措施、安全生产上进行了组织落实,本技术文件将作为今后指导施工生产的依据。该工程将列为我公司昆山地区的重点工程,实行以合同工期为目标的项目法施工,全面履行工程合同,保竣工、保质量、保后期服务。ContentsIntro

11、duction1Section I. Invitation for Bids (IFB)3Notes on the Form of Invitation for Bids3Section II. Instructions to Bidders7Notes on the Instructions to Bidders7Table of Clauses8A. General10B. Bidding Documents14C. Preparation of Bids15D. Submission of Bids21E. Bid Opening and Evaluation23F. Award of

12、Contract29Section III. Bidding Data33Notes on the Bidding Data33Section IV. Part I. General Conditions of Contract39Notes on the Conditions of Contract39PART I - GENERAL CONDITIONS51Section V. Part II: Conditions of Particular Application (COPA)103Notes on the Conditions of Particular Application103

13、Section VI. Technical Specifications149Notes for Preparing Technical Specifications149Section VII. Form of Bid, Appendix to Bid, and Bid Security153Form of Bid154Appendix to Bid156Form of Bid Security (Bank Guarantee)164Form of Bid Security (Bid Bond)166Section VIII. Bill of Quantities169Notes for P

14、reparing a Bill of Quantities169Section IX. Form of Agreement, Forms of Performance Security, and Bank Guarantee for Advance Payment189Form of Agreement190Forms of Performance Security and Bank Guarantee for Advance Payment192Section X. Drawings201Notes for Preparing the Drawings201Section XI. Expla

15、natory Notes203Notes and Additional Clauses to Section IV203Section XII. Postqualification215Invitation for Bids216Section XIII. Disputes Settlement Procedure223Disputes Review Boards Rules and Procedures223Rules and Procedures for the Functions of the Disputes Review Expert (DRE)230Section XIV. Eligibility for the Provision of Goods, Works, and Services in Bank-Financed Procurement237IntroductionThese Standard Bidding Documents for Works (SBDW) have been prepared by the World Bank for use by

展开阅读全文
相关资源
相关搜索

当前位置:首页 > 办公文档 > 事务文书

电脑版 |金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号