1、Cost Optimization,Who we are: We represent North America Cost Optimization Department. Gary Marvicsin. MBA Powertrain Supervisor with Manufacturing Engineering experience. Sharon Li-Calso. MBA Supervisor with Interior Trim experience,N.A. Cost Optimization,Cost Optimization(CO) is part of the Produc

2、t Development/Manufacturing Finance Office. CO Consists of 1 LL4 Manager and approximately 25 LL6 Supervisors and 140 Cost Analysts.,N.A. Cost Opts Organization,Seven Commodity Sections: Chassis/Brakes, Electrical/Electronics, Safety/Glass/Sealing, Engine Transmission Stamping/HVAC/Interior Trim Ext

3、erior Trim/Instrument Panel/Consoles These sections support piece cost and tooling estimate requests submitted by both NA car and NA truck PMTs. The last two sections also are our North American Truck Vehicle center and North American Car Vehicle Center. These two centers supervisors are responsible

4、 for managing all N.A. vehicle program for Cost Opt.,Cost Opts Organization (cont.),Prototype Tooling Section:provide estimates for prototype tooling and piece cost for all new programs. Process Analysis and Control: This group is responsible for updating, maintaining, and providing training on uniq

5、ue Cost Opt. Systems and processes.,How our estimates are used,Provide Engineer with estimated value of alternative designs Provide Buyer with understanding of process used to make parts Provide Finance Analyst with projected cost for future programs(target setting), where designs, quotes and or oth

6、er cost info are not available.,Our Estimates are:,Based on a set of assumptions (better detailed assumptions = better estimate) Electronically calculated by Computer Aided Part Estimating system (or Qwest, Quick Web Estimating System) Detailed in process, material, and labor Supported by GRIMM Glob

7、al Rate Information for Machines and Materials (database) A Measure of Manufacturing Value,Components of an Estimate,Material Labor Direct Indirect Machine Repair, and Other Machine Burden(Overhead) Depreciation/Installation/Interest Floor space Utilities Mark Ups Sales and General Administration En

8、gineering Purchasing Front office Scrap (end item) Profit,Example of an estimate,Processes were here to learn about,Castings Electronics Forgings Small Assembly Powdered Metal,What we are here to do,Learn what cost information is available from Chinese Suppliers Encourage common format for quoting,

9、using this information Learn about the process differences between the Chinese approach to Casting, Forging, Electronics, and Small Assembly processes Establish ongoing pipeline of information exchange on the Chinese infrastructure and leverage for negotiations with US suppliers. Develop new tools to use when asked to estimate a part and/or process in China,

展开阅读全文
相关资源
相关搜索

当前位置:首页 > 办公文档 > PPT模板库 > PPT素材/模板

电脑版 |金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号