1、n更多企业学院: 中小企业管理全能版183套讲座+89700份资料总经理、高层管理49套讲座+16388份资料中层管理学院46套讲座+6020份资料国学智慧、易经46套讲座人力资源学院56套讲座+27123份资料各阶段员工培训学院77套讲座+ 324份资料员工管理企业学院67套讲座+ 8720份资料工厂生产管理学院52套讲座+ 13920份资料财务管理学院53套讲座+ 17945份资料销售经理学院56套讲座+ 14350份资料销售人员培训学院72套讲座+ 4879份资料My comments are as follows :-1. The DLP period for this contrac

2、t is stated as 10 years while the warranty period is stated as 3 years. Please change the DLP period to 2 years (our standard for this project if its not 2 years) and 10 years warranty for the fire door. See attached for page where the DLP period is stated as 10 years.2. 回标疑问卷1&5 To remove the price

3、d BQ from these 2 sets of documents if the BQ has been superseded by the contract BQ.3. Contract BQ Is the design for the main entrance door type FM乙4 (S2.1/1/B) the same as the Public Area timber fire door type FM乙4 (S2.1/1/G)? If its the same thing, please re-adjust the rates to tie in with each o

4、ther.4. Is the BQ given complete? The total cost shown under the Contract BQ (RMB975,193.00) does not tie up with the awarded sum (RMB1,210,448.79).5. 专用条件a) The item in the contents page does not match with the actual clause. S14.7 is know as 竣工报备in the contents page but is reflected as 竣工报表 in the

5、 actual clause.b) Clause S20.1, sub-clause 24.1 on page SCC/38. Reference is made to clause 4.6 of the 投标须知 in paragraph 1. The 投标须知 is not part of this contract, so please check to ensure the clause tie up, if not, to change accordingly.c) Item S20.1, Clause 24.3(a) actual Clause 26.1 mentioned in

6、this clause cant be foundd) Item S20.1 Clause 24.4 actual Clause 26.1, 26.3 mentioned in this clause cant be foundAppreciate if you could clear the attached contract. I will go through at my end in parallel.Pls find the attached for your clearance pls. I had send to Amy before she goes on leave, but

7、 have not reverted to us.Lu, pls hold it until our clearance from legal. Sorry for inconvenience causedWith regards to Qn No. 2, our suggestion is to go for champagne color powder coat instead to match the rest of the development.item 3.7.1, the duration of submitting the material is too long. The w

8、hole contract period is only 1 month+. Please reduce to reasonable time frame. They are submiting perforamnce bond right? Cannot find in the LOA. Thanks.With regards to Qn No. 2, our suggestion is to go for champagne color powder coat instead to match the rest of the developmentFor the qualification

9、 of the tenderer, Main con called to advise that they will provide the qualification of the firm that they are working with in due course, which I think is ok given the tight timeline (caroline is this ok with you ? pls advise).For design/drawings sonny pls follow up asap.For contract provisions yan

10、 mei pls follow up asap.By copy of this mail, appreciate Amy, Michelle and Caroline can help review in parallel and revert with your comments, if any, in parallel.Please understanding that we are calling several contracts in parallel in order to meet the tight timeline and your assistance in the abo

11、ve are appreciated.With regards to Qn No. 2, our suggestion is to go for champagne color powder coat instead to match the rest of the developmentPlease reply to question number 2 as a matter of urgency so DLS can reply to the tenderers.Pls include in your prelim assessment and provide the prelim ass

12、essment on Monday morningPlease reply to the following urgently. The tenderers need to do some design development as part of their tender return so we need to give some more lead timeAs per discussed yesterday, please provide the followings:1. SKK spray paint finish as a replacement material for sto

13、ne cladding as indicated in Capols drawing. Please provide the specification for tenderers.4. Door finish.7. Please provide design intent write-up for the canopy as indicated in Capols drawing.Please provide in Chinese for the above where possible as we are dealing with local contractors.For the qua

14、lification of the tenderer, Main con called to advise that they will provide the qualification of the firm that they are working with in due course, which I think is ok given the tight timeline (caroline is this ok with you ? pls advise).For design/drawings sonny pls follow up asap.For contract prov

15、isions yan mei pls follow up asap.By copy of this mail, appreciate Amy, Michelle and Caroline can help review in parallel and revert with your comments, if any, in parallel.Please understanding that we are calling several contracts in parallel in order to meet the tight timeline and your assistance in the above are appreciatedPer our concall for the Lift Supply LOA comments/concensus as follow as noted by QS in the attached :1. item 1.2 order of listing suggest update the special conditions instead2. item 3.3 (3) maintain 75% max per agreement dur