管道工程施工规范1

上传人:206****923 文档编号:90778434 上传时间:2019-06-16 格式:DOC 页数:5 大小:61.50KB
返回 下载 相关 举报
管道工程施工规范1_第1页
第1页 / 共5页
管道工程施工规范1_第2页
第2页 / 共5页
管道工程施工规范1_第3页
第3页 / 共5页
管道工程施工规范1_第4页
第4页 / 共5页
管道工程施工规范1_第5页
第5页 / 共5页
亲,该文档总共5页,全部预览完了,如果喜欢就下载吧!
资源描述

《管道工程施工规范1》由会员分享,可在线阅读,更多相关《管道工程施工规范1(5页珍藏版)》请在金锄头文库上搜索。

1、We will continue to improve the companys internal control system, and steady improvement in ability to manage and control, optimize business processes, to ensure smooth processes, responsibilities in place; to further strengthen internal controls, play a control post independent oversight role of ev

2、aluation complying with third-party responsibility; to actively make use of internal audit tools detect potential management, streamline, standardize related transactions, strengthening operations in accordance with law. Deepening the information management to ensure full communication zero resistan

3、ce. To constantly perfect ERP, and BFS+, and PI, and MIS, and SCM, information system based construction, full integration information system, achieved information resources shared; to expand Portal system application of breadth and depth, play information system on enterprise of Assistant role; to

4、perfect daily run maintenance operation of records, promote problem reasons analysis and system handover; to strengthening BFS+, and ERP, and SCM, technology application of training, improve employees application information system of capacity and level. Humanistic care to ensure zero. To strengthen

5、ing Humanities care, continues to foster company wind clear, and gas are, and heart Shun of culture atmosphere; strengthening love helped trapped, care difficult employees; carried out style activities, rich employees life; strengthening health and labour protection, organization career health medic

6、al, control career against; continues to implementation psychological warning prevention system, training employees health of character, and stable of mood and enterprising of attitude, created friendly fraternity of Humanities environment. To strengthen risk management, ensure that the business of

7、zero risk. To strengthened business plans management, will business business plans cover to all level, ensure the business can control in control; to close concern financial, and coal electric linkage, and energy-saving scheduling, national policy trends, strengthening track, active should; to imple

8、mentation State-owned assets method, further specification business financial management; to perfect risk tube control system, achieved risk recognition, and measure, and assessment, and report, and control feedback of closed ring management, improve risk prevention capacity. To further standardize

9、trading, and strive to achieve according to law, standardize and fair. Innovation of performance management, to ensure that potential employees zero fly. To strengthen performance management, process control, enhance employee evaluation and levels of effective communication to improve performance ma

10、nagement. To further quantify and refine employee standards . Work, full play party, and branch, and members in five type Enterprise construction in the of core role, and fighting fortress role and pioneer model role; to continues to strengthening four good leadership construction通信管道工程施工作业规范一、 PVC管

11、、蜂窝管通信管道施工要求 1、 核对红线根据设计要求和城市建设道路规划施工图所提供的红线位置,到现场确定具体实质位置,红线位置应不能偏离中心50cm。2、管道基础(1)通信管道基础的中心线应符合设计规定,左右偏差应不大于10毫米。管道基础宽度应比管道组群宽度加宽100毫米(即每侧各宽50毫米)(2)基础在浇灌混凝土之前,应检查核对加钢筋的段落位置是否符合设计规定,其钢筋的绑扎、衬垫等是否符合规定;并应清除基础模板内的杂草等物。浇灌的混凝土应捣固密实,初凝后应覆盖草帘等物并洒水养护。基础模拆除后,基础侧面应无蜂窝、掉边、断裂及欠茬等现象,如发现有上述缺陷,应进行认真的修整、补强等。(3)管道基础

12、必须夯实,铺10cm中粗砂底基,在地下水位较高和沙土地带,要求先回填30厘米6%水泥石粉,铺管后再填充中粗砂10cm,回土夯实,完工后不应有上下起伏及S弯。(4)为减少施工土方量,管道斜坡方向最好与地面的斜坡方向一至,管道放坡高度一般控制在23,在过沟、过桥时可适当放宽,但最大不要超过15. (5) 通信管道基础的混凝土应振捣密实、表面平整、无断裂、无波浪、无明显接茬、欠茬,混凝土表面不起皮、不粉化。3、铺设管道(1)、PVC管、蜂窝管其管身应光滑无伤痕,管孔无变形。 (2)、放管前应将管外凹状定位筋朝上放置,并严格按照管外箭头标志方向顺延,不可颠倒方向。 (3)、塑料管的组群管间缝隙宜为10

13、-15毫米,接续管头必须错开,并保证管群的整体开头统一,直至进入窗口部分其形状应一致。窗口部分的堵抹要求与水泥管相同。(4)、管与管的驳接方法与步骤: A、管材红色方向标明箭头朝上涂胶水至划线处,再将直通一端内侧涂上胶水。将直通内的定位槽对准管外的定位筋插入,用木槌或短木棒打紧至管端划线处。 B、再在直通的另一端内侧涂上胶水,将另一管的管外涂上胶水至划线处,将管插入直通内,打紧至划线处。本工序务必注意接头两端管材上划有的红色方向箭头插在接头同一条定位槽内。 4、回填土 (1)、回填土前,应清除沟(坑)内遗留的杂物,回填土内不应含有直径大于5厘米的砾石碎砖等坚硬物。 (2)、管道顶部回填土在30

14、厘米以上时,每次填30公分应用木夯排夯三遍,直至回填、夯实与原地表平齐。 (3)、在市内主干道路的回土夯实,应与路面平齐,市内一般道路的回土夯实应高出路面510cm。 5、人、手孔砌筑 (1)、手孔抹面的墙体,抹面应平整、压光、不空鼓;墙角不得歪斜。摸面厚度、沙浆配比1:2.5。 (2)、手孔基础外形,尺寸应符合图纸规定,外形偏差不大于 l 0毫米,混凝土标号为#150。 (3)、墙体与基础结合严密,不漏水。手孔建筑砖砌体必须垂直,砌体顶部四角要水平一致。 (4)、公路旁手孔圈安装后基本与路面平齐;野外地段,手孔圈安装后应高出地面5-10cm,以防止埋住手井和雨水流入;对于尚未筑成路面的地段,

15、手孔部应在口圈下垫砖34层以适应今后路面高程的变动。 (5)、砌好口圈后以木栏标志,夜间点燃红灯,以保安全,养护三天后,回土夯实,撤消标志。 (6)、手孔四壁内外均用1:3配合比例制的100#防水水泥砂浆抹面,外壁粗抹面;厚度为2cm;内壁细抹面厚度为1.5cm。 9、回土时,沟槽或基坑内不得有水,并在管道两侧及上面30cm内架松土,以15cm为一层夯实,管道上面30cm以上,每层回土最多30cm,进行夯实。 二、施工注意事项 1、通信管道需征得城建部门批复后,才可以施工。2、通信管道工程所用的器材规格、程式、质量,施工使用前要进行检验,严禁使用质量不合格的器材。 3、施工路由需要更改时,要填

16、写施工变更单,交建设单位批准。 4、开挖管道沟及手孔时密切配合局方随工人员,以减少不必要的麻烦。 5、对道路没有成型的新建管道段,没有道路标高,本工程管道设计从自然路面为0点计;对道路旁地形稳定的新建管道段,开挖管道沟路面与道路面落差在20cm时,管道按低的为0点。1、管道坡度的方向应保证在同一手孔中管道进出口处的高度差不大于0.5m。 6、如果与其它管线在交越时不能达到最小允许隔距时,应遵循“局部服从整体、小管让大管、软管让硬管、有压让无压”的原则,相互协商,并采取特殊措施。尤其与排水沟交越时以尽量减少对流水的阻碍为原则,并必须包封钢管保护。 7、拆除模型时一定要满足时间要求:混凝土要在714天以上;管道包封要在37天以上。 8、修复过路管道的路面时要求使用250#混凝土。 9、在恢复主要道路时,不再回填原土,要求先回填30厘米6%水泥石粉

展开阅读全文
相关资源
相关搜索

当前位置:首页 > 中学教育 > 其它中学文档

电脑版 |金锄头文库版权所有
经营许可证:蜀ICP备13022795号 | 川公网安备 51140202000112号