1、1,第七章 国际工程合同文件理解与运用,2,本章目录,施工质量的相关规定,1,竣工检验与试验,2,工程保修的相关规定,3,3,第一节 国际工程合同中施工质量的规定,Conditions of Contract for Construction,4,第一节 国际工程合同中施工质量的规定,Conditions of Contract for Construction,5,第一节 国际工程合同中施工质量的规定,ICE CONDITIONS OF CONTRACT DEFINITIONS AND INTERPRETATION Definition (r) “Certificate of Substan

2、tial Completion“ means a certificate issued under Clause 48(2) (a), 48(3) or 48(4). (s) “ Defects Correction Period“ means that period stated in the Appendix to the Form of Tender calculated from the date on which the Contractor becomes entitled to a Certificate of Substantial Completion for the Wor

3、ks or any Section or part hereof. (t) “ Defects Correction Certificate“-as defined in Clause 61 (1).,6,第一节 国际工程合同中施工质量的规定,Conditions of Contract for Construction 4.9 Quality Assurance,7,第一节 国际工程合同中施工质量的规定,ICE CONDITIONS OF CONTRACT Design responsibility (2) The Contractor shall not be responsible fo

4、r the design or specification of the Permanent Works or any part thereof (except as may be expressly provided in the Contract) or of any Temporary Works designed by the Engineer. The Contractor shall exercise all reasonable skill care and diligence in designing any part of the Permanent Works for wh

5、ich he is responsible.,8,第一节 国际工程合同中施工质量的规定,AIA 201-2007 General conditions of the contract for consruction 9.8.1 Substantial Completion is the stage in the progress of the Work when the Work or designated portion thereof is sufficiently complete in accordance with the Contract Documents so the Owne

6、r can occupy or utilize the Work for its intended use.,9,第一节 国际工程合同中施工质量的规定,AIA 201-2007 General conditions of the contract for consruction 9.8.2 When the Contractor considers that the Work, or a portion thereof which the Owner agrees to accept separately, is substantially complete, the Contractor s

7、hall prepare and submit to the Architect a comprehensive list of items to be completed or corrected prior to final payment. Failure to include an item on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents.,10,第一节 国际工程合同中施工质量的规

8、定,AIA 201-2007 General conditions of the contract for consruction 9.8.3 Upon receipt of the Contractors list, the Architect will make an inspection to determine whether the Work or designated portion thereof is substantially complete. If the Architects inspection discloses any item, whether or not i

9、ncluded on the Contractors list, which is not sufficiently complete in accordance with the requirements of the Contract Documents so that the Owner can occupy or utilize the Work or designated portion thereof for its intended use, the Contractor shall, before issuance of the Certificate of Substanti

10、al Completion, complete or correct such item upon notification by the Architect. In such case, the Contractor shall then submit a request for another inspection by the Architect to determine Substantial Completion.,11,第一节 国际工程合同中施工质量的规定,AIA 201-2007 General conditions of the contract for consruction

11、 9.8.4 When the Work or designated portion thereof is substantially complete, the Architect will prepare a Certificate of Substantial Completion that shall establish the date of Substantial Completion, shall establish responsibilities of the Owner and Contractor for security, maintenance, heat, util

12、ities, damage to the Work and insurance, and shall fix the time within which the Contractor shall finish all items on the list accompanying the Certificate. Warranties required by the Contract Documents shall commence on the date of Substantial Completion of the Work or designated portion thereof un

13、less otherwise provided in the Certificate of Substantial Completion .,12,第一节 国际工程合同中施工质量的规定,AIA 201-2007 General conditions of the contract for consruction 9.8.5 The Certificate of Substantial Completion shall be submitted to the Owner and Contractor for their written acceptance of responsibilities

14、 assigned to them in such Certificate. Upon such acceptance and consent of surety, if any, the Owner shall make payment of retainage applying to such Work or designated portion thereof.Such payment shall be adjusted for work that is incomplete or not in accordance with the requirements of the Contra

15、ct Documents.,13,第一节 国际工程合同中施工质量的规定,AIA 201-2007 General conditions of the contract for consruction 9.9 PARTIAL OCCUPANCY OR USE 9.9.1 The Owner may occupy or use any completed or partially completed portion of the Work at any stage when such portion is designated by separate agreement with the Cont

16、ractor, provided such occupancy or use is consented to by the insurer as required under Section 11.3.1.5 and authorized by public authorities having jurisdiction over the Project. Such partial occupancy or use may commence whether or not the portion is substantially complete, provided the Owner and Contractor have accepted in writing the responsibilities assigned to each of them for payments, retainage, if any, security, maintenance, heat, utilities, damage to the Work and